Created by Fuzzy Cloud

Patna High Court

Dulari DeviversusThe State of Bihar

Decided
Disposal
DISPOSED

Holding

The court held that the demand for diversion of water through a sluice gate is technically infeasible and therefore the petition lacks merit, leading to its dismissal.

Summary

The petition was filed by Dulari Devi, Chairperson of Zila Parishad Jamui, seeking a court order directing the State of Bihar to construct a sluice gate on the Bahuar River as part of the Kundghat Reservoir Project so that water could be diverted to the north‑eastern villages of Sikandra Block. The petitioner alleged that the dam’s design favoured the southern command area, leaving 40‑50 thousand residents in the eastern side without irrigation and causing barren land. The respondents, represented by the Water Resources Department, submitted a counter‑affidavit stating that the project was designed on the basis of detailed technical surveys, that water flow to the eastern side is not feasible due to topography and gravity flow constraints, and that future irrigation will be provided through the renovation of the Upper Kiul Main Canal. The court examined the technical submissions and held that the issue of water diversion is a matter of technical feasibility best left to engineers, and found no merit in the public‑interest litigation. Consequently, the writ petition was dismissed and the case was disposed of.

Issues considered

  • Can the court compel the State to construct a sluice gate and divert water to the north‑eastern villages of Sikandra Block?
  • Does the alleged irreparable loss to 40‑50 thousand residents give rise to a cause of action in a public interest litigation?
  • Are technical feasibility considerations a bar to judicial intervention in irrigation projects?

Subjects

  • public interest litigation
  • water resources
  • irrigation
  • technical feasibility
  • administrative law
  • environmental law
  • civil writ jurisdiction

Judgment

         IN THE HIGH COURT OF JUDICATURE AT PATNA
                    Civil Writ Jurisdiction Case No.20331 of 2025
     ======================================================
     Dulari Devi, Wife of Guddu Yadav, at present Chairman Zila Parishad Jamui,
     Resident of Village- Borar, Sikandra, P.S. Shikandra, District- Jamui.

                                                                  ... ... Petitioner/s
                                        Versus

1.   The State of Bihar through Secretary, Water Resources Department, Govt. of
     Bihar, Patna.
2.   The Additional Secretary, Water Resources Department, Govt. of Bihar,
     Patna.
3.   The Technical Advisor, Water Resources Department, Govt. of Bihar, Patna.
4.   The Engineer in Chief Head Quarter, Water Resources Department, Govt. of
     Bihar, Patna.
5.   The Engineer in Chief (Irrigation Creation), Water Resources Department,
     Govt. of Bihar, Patna.
6.   The Chief Engineer, Planning and Monetring, Water Resources Department,
     Govt. of Bihar, Patna.
7.   The Chief Engineer, Master Planning Investigation and Project Preparation,
     Water Resources Department, Govt. of Bihar.
8.   The Director, Water Resource and Irrigation Department, Govt. of Bihar,
     Patna.
9.   The District Magistrate, Jamui, P.S. and District- Jamui.
10. The Superintending Engineer, Irrigation Department, Bhagalpur, P.S. and
    District- Bhagalpur.
11. The Executive Engineer, Minor Irrigation Jamui, P.S. and District- Jamui.
12. The Sub-Divisional Officer, Nawabganj Minor Irrigation Officer, P.S.-
    Sikandra, District-Jamui.
13. The Executive Engineer, Water Resources Department, Sikandra, Jamui P.S.
    and District- Jamui.
14. The Project Manager, Kundghat, P.S.- Sikandra, District- Jamui.

                                               ... ... Respondent/s
     ======================================================
     Appearance :
     For the Petitioner/s   :      Dr. Anjani Pd. Singh, Advocate
     For the Respondent/s   :      Mr. P. K. Shahi, Advocate General
     ======================================================
     CORAM: HONOURABLE THE CHIEF JUSTICE
             and
             HONOURABLE MR. JUSTICE HARISH KUMAR
     ORAL JUDGMENT
     (Per: HONOURABLE THE CHIEF JUSTICE)
Patna High Court CWJC No.20331 of 2025 dt.10-04-2026
                                           2/11




         Date : 10-04-2026

                        The present writ petition by way of a Public

         Interest Litigation has been filed by the petitioner Dulari Devi

         seeking for construction of sluice gate towards Bahuar Canal

         with regard to Kurdghat reservoir construction in order to save

         the irrigation at Northern Eastern side of the Shikandra Block

         (Jamui) towards Kodasi Jagdishpur to Raghunathpur village

         otherwise it would cause irreparable loss to the 40-50 thousands

         people of Sikandra Block, with a further prayer to direct the

         respondents to provide water in Bahuar river also otherwise it

         would be fatal to several panchayats under Shikandra Block and

         for further direction to the respondents to divert the water in

         proportion of the land to save several panchayats in the down

         water level and to prevent the land being barren land.

                        2. The case of the petitioner is as follows:

                                                  “(i). That Kurdghat Jalashya
                                 Yojna / Kurdghat Reservoir Project is a
                                 dream project of the Water Resource
                                 Department under Jamui District. It has
                                 to be constructed approximately 351
                                 meters long and 41 meter high dam across
                                 the Bahuar River in Shikandra Block
                                 under Jamui District to provide irrigation
                                 facilities to drought prone area in Jamui
                                 District for boost agricultural activities.
Patna High Court CWJC No.20331 of 2025 dt.10-04-2026
                                           3/11




                                                  (ii). That the petitioner is the
                                 supporter of the dam project but the
                                 petitioner       only     wants     proportionate
                                 distribution of water for her jurisdiction.
                                 She learnt that the dam has given water to
                                 Mathurapur Main Canal on the Southern
                                 side    while      the     aforesaid      dam   has
                                 neglected Bahuar river and towards Sable
                                 Bigha and Kodasi Village Panchayats,
                                 which will cause great loss to several
                                 panchayats.
                                                  (iii).    That     the     several
                                 Mukhiyas of the panchayats like Pole
                                 Sablebigha, Bhullo and Pramukh of the
                                 Shikandra Block namely Usha Devi wrote
                                 letter to petitioner, who is the Chair
                                 person, Zila Parisad Jamui to open the
                                 Slice gate towards Bahuar River and they
                                 became aggrieved as their land has
                                 become barren.
                                                  (iv). That hundreds of local
                                 aggrieved persons have written letter to
                                 the Chairperson of the Zila Parisad of
                                 Jamui for redressal of their grievances in
                                 regard to irrigation of their lands and to
                                 save     the     land     from    being     barren,
                                 otherwise people would be on the verge of
                                 starvation like Faguni Prasad Yadav,
                                 Santosh Paswan, Nand Kishore Keshri.
                                                  (v).     That    thereafter    the
Patna High Court CWJC No.20331 of 2025 dt.10-04-2026
                                           4/11




                                 petitioner wrote letter vide letter no.
                                 51/2025 on 11.02.2025 to the Chief
                                 Engineer, Water Resources and Irrigation
                                 Department, Govt. of Bihar, Patna and
                                 Principal Secretary, Govt. of Bihar vide
                                 letter no. 52/2025 dated 11.02.2025 and
                                 gave reasons that if the respondents
                                 disturb Bahuar river, forty to fifty
                                 thousand citizens would be aggrieved but
                                 till today, no action has been taken with
                                 regard to the locality concerned.
                                                  (v). That the petitioner has
                                 also annexed a Nazri Nakasha of the
                                 locality and it appears that the Sluice
                                 Gate towards Mathurapur Main Nahar
                                 Blocks the Bahuar River and that the
                                 respondents            are      neglecting      the
                                 farmers/lands,          who       were       earlier
                                 beneficiaries from the water.”
                        3. When the matter was taken up on 18.02.2026,

         learned counsel for the State took time to file counter affidavit

         and accordingly counter affidavit has been filed on behalf of the

         respondent nos. 1 to 8 and 10 to 13 by one Ravi Shekhar

         Sharma, Executive Engineer, Irrigation Division Sikandra,

         Jamui, wherein it is stated as follows:

                                                  “5.     That     the    Kundghat
                                 Reservoir Project has been prepared on
                                 the basis of comprehensive technical
Patna High Court CWJC No.20331 of 2025 dt.10-04-2026
                                           5/11




                                 survey and investigations on the basis of
                                 which DPR has been approved. Thereafter
                                 the design and drawings had been
                                 approved based on natural flow of water
                                 (i.e. gravity flow), topography of land
                                 Thereafter the construction work had been
                                 started and presently the construction
                                 work is at the final stage of completion.
                                 Hence       it    is    not     technically      and
                                 economically feasible to provide water in
                                 North-Eastern          villages     through      this
                                 Kundghat reservoir scheme. Also, in the
                                 Design, there is a provision of water flow
                                 into the Bahuaar River through:-
                                                   a.    Escape      Channel       of
                                         Kundghat Main Canal.
                                                   b. Spillway Gates of Dam if
                                         there     is   excess     water     in   the
                                         reservoir.
                                                  6. That it is submitted that the
                                 concerned team had approved the said
                                 project after considering the natural water
                                 flow of connected river & gravity flow,
                                 topographical condition, scientific and
                                 geological basis as well as the technical
                                 feasibility and economical optimization
                                 hence without considering these facts the
                                 design & alignment of the project cannot
                                 be changed.
                                                  xxx          xxx         xxx
Patna High Court CWJC No.20331 of 2025 dt.10-04-2026
                                           6/11




                                                  9. That it is stated and
                                 submitted        that     the   demand       of   the
                                 Petitioner to divert the water flow towards
                                 certain villages is technically unfeasible
                                 because the ground slope in that direction
                                 does not favour the gravity flow and the
                                 project is designed to supply the water
                                 through      natural       gradients    to    ensure
                                 sustainability and efficiency.
                                                  10. That it is further stated
                                 that the Bahuaar River is a seasonal hilly
                                 river which carries heavy flow only for a
                                 short duration during the monsoon and
                                 then recedes. To regulate such flow,
                                 conserve rainwater and ensure planned
                                 irrigation,      the      Kundghat     Dam        was
                                 constructed on the Bahuaar River. The
                                 dam is located near Lachuar Village,
                                 where the eastern side of the river is at a
                                 higher elevation and the western side is
                                 lower.
                                                  11. That due to the natural
                                 topography, the gravity-based irrigation
                                 from the Bahuaar River is technically
                                 feasible only towards the western side.
                                 Accordingly,          a    canal     system       was
                                 constructed       to      provide    irrigation    to
                                 approximately 2035 hectares of land in
                                 Sikandra Block. The eastern area, being
                                 higher than the riverbed, cannot receive
Patna High Court CWJC No.20331 of 2025 dt.10-04-2026
                                           7/11




                                 irrigation from the dam through natural
                                 flow. The same is evident from the Nazari
                                 Map.
                                                  12. That prior to construction
                                 of the said dam, monsoon water of the
                                 Bahuaar River used to flow into the
                                 Harohar River, and there was no water
                                 storage or regulated irrigation system.
                                 After    construction,     water   is   stored,
                                 regulated and safely managed through
                                 canals, escape regulator and a spillway
                                 structure for ensuring irrigation in the
                                 southern command area and overall water
                                 security.
                                                  13. That the eastern area as
                                 referred by the Petitioner already falls
                                 within the Cultural Command Area of
                                 existing irrigation projects, including the
                                 Upper Kiul Main Canal (UKMC) and
                                 connected reservoirs and distributaries.
                                 The renovation and lining work of the
                                 UKMC is presently under process and
                                 upon completion; irrigation water shall
                                 reach the tail end. The farmers of the
                                 eastern region will be also benefitted after
                                 renovation and lining work of the UMKC.
                                 It is further stated that earlier the UKMC
                                 was built with soil but now the work of
                                 concretization in place of soil is under
                                 process.
Patna High Court CWJC No.20331 of 2025 dt.10-04-2026
                                           8/11




                                                   14. That in this regard it is
                                 further stated that the agreement bearing
                                 Agreement No. 02/SBD/2025-26 was also
                                 executed      with      successful     bidder    for
                                 Restoration and Lining Work of main
                                 Canal from 0.00 to 19.60 Km under Upper
                                 Kiul Reservoir Scheme for agreement
                                 amount       of     Rs.52,67,67,661.      As     per
                                 agreement the said work will be completed
                                 within 18 months.
                                                   15. That it is stated that after
                                 completion of abovementioned project the
                                 complete         irrigation   facility    will   be
                                 available in the eastern side as referred by
                                 the Petitioner. It is pertinent to mention
                                 that earlier the irrigation facility was also
                                 available in the eastern side or area as
                                 referred or demanded by the Petitioner but
                                 due to some damage in the UKMC, the
                                 said irrigation facility was disturbed.
                                                   xxx         xxx        xxx
                                                   17. That earlier vide Letter
                                 No. 813 dated 11.07.2018 the Executive
                                 Engineer, Irrigation Division Sikandra
                                 submitted the Technical feasibility Report
                                 before     the        Superintending     Engineer,
                                 Irrigation Circle, Jamui stating all the
                                 facts about the construction of Kundghat
                                 Reservoir Scheme. The same is evident
                                 from the Technical feasibility Report of the
Patna High Court CWJC No.20331 of 2025 dt.10-04-2026
                                           9/11




                                 committee dated 18.12.2017 as well as the
                                 Estimates dated 08.09.2009.”
                        4. After receipt of the counter affidavit, the

         petitioner has filed a rejoinder affidavit, wherein it is stated as

         follows:

                                                  “4. That meaning thereby the
                                 “Kund        Ghat      Project”    has    been
                                 constructed on the origin point of Bahuar
                                 River but the design of construction is
                                 faulty as when rain water raises in the
                                 reservoir and reaches a height of 30
                                 metres then the water comes in Bahuar
                                 River, otherwise water flows to other side,
                                 i.e., towards Mathurapur and Korwadih it
                                 appears from the design itself that the
                                 authority concerned has adopted a step-
                                 mother treatment towards agriculturists,
                                 who are beneficiaries of Bahuar river and
                                 accordingly, it will cause great prejudice
                                 to the eastern northern area of Sikandra
                                 Block.
                                                  5. That in the construction of
                                 Kundghat reservoir there is a provision for
                                 water flow into Bahuar River through step
                                 channel and spillway gates if there is
                                 excess water in the reservoir meaning
                                 thereby that in a normal situation, there
                                 will be no water flow towards Bahuar
                                 river and it will cause great prejudice to
Patna High Court CWJC No.20331 of 2025 dt.10-04-2026
                                          10/11




                                 irrigation in the sub division of Sikandra
                                 Block. Some photograph is attached
                                 herewith for clarification of the scenario
                                 over the Bahuar river.
                                                  xxx      xxx      xxx
                                                  10. That from the statement
                                 made in paragraph 13 of the counter
                                 affidavit it appears now that the petitioner
                                 will get water after renovation of linking
                                 work of “Upper Kiul Main Canal”
                                 (U.K.M.C.) and the renovation of linking
                                 work of U.K.M.C. is presently under
                                 process and upon completion, irrigation
                                 water shall reach the farmers of the
                                 eastern region.”
                        5. We have heard the learned counsel for the

         respective parties and gone through pleading in the writ petition,

         counter affidavit and the rejoinder affidavit. From the record, it

         appears that the construction work of the Kundghat Reservoir

         Project is at the final stage of completion and it is not

         technically and economically feasible to provide water in North-

         Eastern villages through the Kundghat reservoir scheme and that

         the demand of the petitioner to divert the water flow towards

         certain villages is technically not feasible as because the ground

         slope in that direction does not favour the gravity flow and the

         project has been designed to supply the water through natural
             Patna High Court CWJC No.20331 of 2025 dt.10-04-2026
                                                       11/11




                      gradients to ensure the sustainability and efficiency.

                                     Even though the learned counsel for the petitioner

                      has disputed the stand taken by the Executive Engineer in the

                      counter affidavit, however since these are all technical issues to

                      be dealt with by the persons having technical expertise in the

                      concerned field and above all in the counter affidavit filed by

                      the Executive Engineer, it is clearly stated that the prayer of the

                      petitioner regarding diversion of the water towards certain

                      villages is technically not feasible, this Court does not find any

                      merit in the present Public Interest Litigation.

                                     6. Accordingly, the Public Interest Litigation is

                      disposed of.


                                                  (Sangam Kumar Sahoo, CJ)



                                                      (Harish Kumar, J)
uday/-
AFR/NAFR                NAFR
CAV DATE                NA
Uploading Date          15.04.2026
Transmission Date       NA


Continue reading with your account

Sign in to read the full judgment. It’s free.

Sign in to read

Checking your session…

For a signed copy suitable for filing, refer to the court's website.