Patna High Court

Madhurendra PrasadversusChairman cum Managing Director, Bihar State Power (Holding) Co. Ltd.

Decided
Disposal
ALLOWED

Holding

The departmental proceedings and all consequent orders are void because they were initiated by an authority lacking jurisdiction, as the General Manager (HR & Administration) was not the appointing/disciplinary authority and no valid delegation of disciplinary powers to him existed.

Summary

The petitioner, a former Junior Electrical Engineer promoted to Assistant Electrical Engineer, was transferred to SBPDCL after the restructuring of BSEB under the Electricity Act, 2003. He was made a member of a committee investigating a franchisee’s financial default and later faced departmental proceedings initiated by the General Manager (HR & Administration) for alleged negligence, resulting in the withholding of two annual increments. The petitioner challenged the initiation and punishment, arguing that the General Manager lacked jurisdiction as the appointing and disciplinary authority was the Managing Director, and no valid delegation of powers existed. The respondents contended that the proceedings were lawful and that the petitioner was estopped from raising jurisdictional objections later. The Court held that the departmental proceedings were initiated by an unauthorized authority, rendering the charge sheet, show‑cause notices, and punishment orders void, and quashed all such orders, directing the respondents to restore any deducted amounts.

Issues considered

  • Whether the General Manager (HR & Administration) had the jurisdiction to initiate departmental proceedings against the petitioner.
  • Whether the initiation of the disciplinary proceeding complied with Rule 16(1) of the Bihar Government Servants (Classification, Control and Appeal) Rules, 2005 and the delegation of powers under the Electricity Act, 2003.
  • Whether the petitioner is estopped from challenging the jurisdiction of the initiating authority at a later stage.
  • Whether the writ petition is maintainable given the petitioner’s earlier limitation to the review order.

Legislation cited

Subjects

  • departmental proceedings
  • jurisdiction
  • disciplinary authority
  • delegation of powers
  • public service law
  • punishment
  • administrative law
  • Electricity Act
  • Bihar government rules

Judgment

          IN THE HIGH COURT OF JUDICATURE AT PATNA
                   Civil Writ Jurisdiction Case No. 314 of 2023
     ======================================================
     Madhurendra Prasad son of Late Ramchandra Rawat, resident of Village-
     Koiriaya Tola, Sona Lal Gali, Raksaul, P.S.- Raksaul, District- East
     Champaran.

                                                                ... ... Petitioner/s
                                        Versus
1.   Chairman cum Managing Director, Bihar State Power (Holding) Co. Ltd.
     having its office at Vidyut Bhawan, Bailey Road, Patna- 800001.
2.   South Bihar Power Distribution Co. Ltd. through its Managing Director
     having its office at Vidyut Bhawan, Bailey Road, Patna- 800001.
3.   Managing Director, South Bihar Power Distribution Co. Ltd. through its
     Managing Director having its office at Vidyut Bhawan, Bailey Road, Patna-
     800001.
4.   General Manager (HR and Admn), South Bihar Power Distribution Co. Ltd.
     through its Managing Director having its office at Vidyut Bhawan, Bailey
     Road, Patna- 800001.

                                               ... ... Respondent/s
     ======================================================
     Appearance :
     For the Petitioner/s      :      Mr. Umesh Prasad Singh, Sr. Adv.
                                      Mr.Vaibhava Veer Shanker
                                      Mr. Sameer Sawarn
     For the Respondent/s      :      Mr. Dharmeshwar Mishra, Sr. Adv.
                                      Mr, Indrajeet Bhushan
     ======================================================
     CORAM: HONOURABLE MR. JUSTICE ANIL KUMAR SINHA

     JUDGMENT AND ORDER
            C.A.V.

      Date : 06-01-2026

                            The present writ application has been filed for

     quashing the resolution, dated 12.08.2014, issued, by the General

     Manager (HR & Administration), South Bihar Power Distribution

     Company Limited, Patna, under Memo No. 1530, whereby

     departmental proceedings were initiated against the petitioner and

     for quashing the resolution/Order No. 664, dated 13.05.2016, by
Patna High Court CWJC No.314 of 2023 dt.06-01-2026
                                           2/18




       which the punishment of withholding two annual increments with

       cumulative effect was imposed against the petitioner. The

       petitioner has further prayed for quashing resolution no. 267, dated

       14.02.2017, whereby the earlier punishment was modified to the

       extent of withholding of one annual increment with non-

       cumulative effect, as well as for quashing the letter no. 647, dated

       22.09.2022, whereby the petitioner was informed that his review

       application has been rejected.

                    2. The factual matrix of the case of the petitioner, in

       brief, is that he was initially appointed as Junior Electrical

       Engineer, vide Notification No. 1097, dated 12.11.1999, issued by

       the Joint Secretary, Bihar State Electricity Board (hereinafter

       referred as ‘BSEB’). Subsequently, he was promoted to the post of

       Assistant Electrical Engineer on 17.09.2007. Thereafter, the

       petitioner was transferred from the Electric Supply Sub-Division,

       Katihar (Urban) to the Electric Supply Sub-Division, Rajgir with

       effect from 25.10.2012. Pursuant thereto, the petitioner joined at

       Rajgir as Assistant Electrical Engineer.

                    3. With the enactment of the Electricity Act, 2003, the

       Electricity (Supply) Act, 1948 stood repealed and by virtue of

       Section 172 thereof, the BSEB ceased to exist. In exercise of

       powers under Section 132 of the Electricity Act, 2003, the State
Patna High Court CWJC No.314 of 2023 dt.06-01-2026
                                           3/18




       Government issued a Notification, dated 30.10.2012, restructuring

       the erstwhile BSEB into the Bihar State Power Holding Company

       Limited (in short, ‘BSPHCL’) and its four subsidiary companies,

       including the South Bihar Power Distribution Company Limited

       (in short, ‘SBPDCL’).

                    4. In terms of Section 133 of the Electricity Act, 2003,

       the services of all employees of the erstwhile BSEB were initially

       transferred to BSPHCL on the same terms and conditions and

       thereafter, in accordance with the said notification, employees

       were allocated to the respective subsidiary companies.

                    5. Clause 6 of the Notification deals with transfer of

       persons and Schedule F deals with detailed scheme including the

       terms and conditions for transfer of the employees in transmission,

       generation, distribution and common services. The petitioner,

       being posted at Rajgir, which is a distribution division, became an

       employee of the SBPDCL with effect from 01.11.2012.

                    6. The SBPDCL is governed by its Board of Directors,

       one of whom is the Managing Director (MD), who functions as the

       Chief Executive and Administrative Head of the Company and

       thereby became the employer of the petitioner in place of the

       BSEB. The field undertakings of the company are headed by the

       General Manager -cum- Chief Engineer.
Patna High Court CWJC No.314 of 2023 dt.06-01-2026
                                           4/18




                    7. Prior to the posting of the petitioner at Rajgir on

       25.10.2012, a tender for appointment of a franchisee for collection

       of electricity charges/bills from consumers was issued by the

       erstwhile BSEB. Pursuant thereto, M/s Mithilesh Enterprises was

       selected as the franchisee and a Letter of Intent, under Memo No.

       3281,      dated     28.08.2012,       was    issued   by   the   Electrical

       Superintending Engineer, Biharsharif.

                    8. In terms of Clause 4 of the Letter of Intent, dated

       28.08.2012, the Electrical Executive Engineer, Electric Supply

       Division, Rajgir, was designated as the Work Incharge for

       operation of the contract. Further, Clause 4.5 (B) of the agreement

       executed between the franchisee and the Electrical Superintending

       Engineer, Biharsharif, stipulated that the BSEB may, at any time

       during the subsistence of the agreement, authorize any person(s) to

       inspect, verify and audit the performance, records and accounts of

       the franchisee.

                    9. The contract with the said franchisee was for a period

       of three years. However, during the subsistence of the contract, the

       franchisee defaulted in depositing the amount collected from the

       consumers. Such irregularities came to light upon scrutiny of the

       accounts for the period from 01.10.2012 to 30.11.2013, which

       ultimately led to termination of the contract with the franchisee.
Patna High Court CWJC No.314 of 2023 dt.06-01-2026
                                           5/18




       Subsequent audit of accounts conducted for the period from

       01.08.2012 to 30.11.2013 further revealed that the franchisee,

       during the contract period as well as even after termination of the

       agreement, had collected money from consumers, but failed to

       deposit the same, thereby defalcating an amount exceeding to

       ₹28,15,898/-.

                    10. Subsequently, a committee was constituted by the

       Electrical Executive Engineer, Rajgir, vide office order, dated

       13.01.2014 to examine the relevant records and for the first time,

       the petitioner was included as a member of the committee. Upon

       examination, the committee found a short deposit of ₹24,91,848/-.

       Acting in the capacity of a member of the committee, the

       petitioner forwarded the inspection report to the Electrical

       Executive Engineer, Rajgir, vide letter no. 30, dated 29.01.2014.

                    11. However, all of a sudden, on 12.08.2014, the

       General Manager (HR & Administration), SBPDCL, issued Memo

       No. 1530, dated 12.08.2014, initiating departmental proceeding

       against the petitioner on the allegation that there was reason to

       believe that the petitioner was prima facie guilty of gross

       misconduct and negligence of duty, as specified in the charge

       sheet. The petitioner was directed to submit his written statement

       of defence within fifteen days from the date of issuance of the said
Patna High Court CWJC No.314 of 2023 dt.06-01-2026
                                           6/18




       memo. Sri Rishi Prasad, Chief Engineer, SBPDCL, was appointed

       as the Enquiry Officer to conduct the departmental proceeding.

                    12. After conclusion of the departmental proceeding, the

       Enquiry Officer submitted the enquiry report on 20.11.2014,

       wherein it has categorically been concluded that although five

       charges were levelled against the petitioner, no charge of financial

       embezzlement in collusion with the franchisee was proved against

       him. However, the petitioner was held guilty of negligence of duty

       and a second show-cause notice on 08.01.2015 was issued by the

       General Manager (HR & Administration), calling upon the

       petitioner to explain as to why he should not be punished.

                    13. In response to the second show-cause notice, the

       petitioner submitted a detailed reply on 09.06.2015, denying all the

       charges levelled against him. However, without properly

       considering the facts and circumstances of the case and in a

       mechanical manner, the General Manager (HR & Administration)

       imposed the punishment of withholding of two annual increments

       with cumulative effect, which was communicated to the petitioner,

       vide Memo No. 665 dated 13.05.2016.

                    14. Aggrieved by the punishment order, the petitioner

       preferred an appeal before the appellate authority, i.e. the

       Chairman -cum- Managing Director, BSPHCL, Patna. The
Patna High Court CWJC No.314 of 2023 dt.06-01-2026
                                           7/18




       appellate authority, vide order, dated 05.02.2017 modified the

       punishment from withholding of two annual increments with

       cumulative effect to withholding of one increment with non-

       cumulative effect.

                    15. Aggrieved by the order, dated 05.02.2017, the

       petitioner preferred a review application on 13.05.2022 before the

       Chairman -cum- Managing Director, BSPHCL; however, the same

       was rejected by the competent authority on 14.02.2017 as not

       maintainable.

                    16. During the pendency of review application, the

       petitioner approached this Hon’ble Court by filing CWJC No.

       12243 of 2022, which was disposed vide order, dated 30.09.2022,

       with liberty to the petitioner to assail the order passed in the

       review application by way of a fresh writ petition.

                    17. Learned Senior Counsel appearing on behalf of the

       petitioner argued that the very initiation of the departmental

       proceeding against the petitioner is ex facie illegal, arbitrary and

       without jurisdiction. Drawing the attention of this Court to the

       Office Order, dated 11.03.2015, issued under the signature of Mr.

       Binod Kumar, General Manager (HR & Administration), it has

       been submitted that the said letter demonstrates that pursuant to

       the decision taken by the Board of Directors, the General Manager
Patna High Court CWJC No.314 of 2023 dt.06-01-2026
                                           8/18




       (HR & Administration), SBPDCL, was authorized to exercise the

       powers in accordance with the delegation of powers schedule

       issued by BSPHCL, till the posting/appointment of the Executive

       Director (HR & Administration) in SBPDCL.

                     18. Therefore, the submission is that the said delegation

       of powers came into force from 11.03.2015; whereas the

       departmental proceeding was initiated against the petitioner on

       12.08.2014. Thus, on the date of initiation of the departmental

       proceeding, the General Manager (HR & Administration), was not

       the appointing authority or the disciplinary authority of the

       petitioner.

                     19. Learned Senior Counsel further submits that in view

       of the statutory scheme governing the service conditions, the

       Managing Director, subject to delegation of powers by the Board

       of Directors of SBPDCL, was the competent appointing and

       disciplinary authority of the petitioner.

                     20. The attention was drawn to the resolution of the

       Board of Directors of the SBPDCL, notified vide Order No. 164,

       dated 26.06.2013, whereby the existing delegation of powers to

       award major and minor punishments to officers of the rank of

       Assistant Engineer/Electrical Engineer and equivalent was

       amended from General Manager -cum- Chief Engineer of the
Patna High Court CWJC No.314 of 2023 dt.06-01-2026
                                           9/18




       concerned area/project and such powers were vested in the

       Managing        Director/Executive            Director   (HR).   The   entire

       departmental proceeding, including issuance of the charge sheet,

       second show cause notice and the order of punishment, was

       undertaken by the General Manager (HR & Administration)

       without any authority under the law.

                    21. Referring to the provisions contained in Rule 16 of

       Bihar Government Servants (Classification, Control and Appeal)

       Rules, 2005 (in short, ‘2005 Rules’), learned Senior Counsel

       contended that the appointing authority/disciplinary authority of

       the petitioner is the Managing Director, as such, the action of the

       General Manager (HR & Administration) regarding initiation of

       departmental proceeding against the petitioner was clearly

       untenable in the eyes of law.

                    22. The memo of charges issued against the petitioner

       was never approved by the appointing or disciplinary authority and

       the power was never delegated by the appointing or disciplinary

       authority to the General Manager (HR & Administration).

       Therefore, the very initiation of departmental proceeding is

       vitiated as illegal. He next submits that the charges levelled against

       the petitioner are wholly unsustainable on merits based on no

       evidence. The proceeding was initiated without taking any
Patna High Court CWJC No.314 of 2023 dt.06-01-2026
                                          10/18




       explanation or show cause from the petitioner before initiation of

       the departmental proceeding and service of memo of charge.

                    23. It is an undisputed fact that the agreement with the

       BSPHCL and the franchisee and the Letter of Intent were executed

       much prior to the posting of the petitioner at Rajgir and under the

       express terms thereof, the Electrical Executive Engineer was

       designated as the Work In-Charge for the operation and

       supervision of the contract. The petitioner was never authorized,

       either under the agreement or by any office order to inspect, audit,

       verify accounts or supervise the collections made by the

       franchisee. The role of the petitioner arose at a later stage when he

       was included as a member of the committee constituted on

       13.01.2014, after the defalcation had already taken place and his

       role was limited to forwarding the report of the committee to the

       competent authority. At no stage, any specific act of omission

       attributable to the petitioner was identified or proved showing the

       misconduct or negligence done by the petitioner nor was any such

       charge, supported by cogent documentary or oral evidence, was

       laid during the departmental proceedings.

                    24. Learned Senior Counsel for the petitioner relied on

       the decisions of the Supreme Court, in the cases of (i) Union of

       India v. B.V Gopinath, reported in (2014) 1 SCC 351; (ii) State
Patna High Court CWJC No.314 of 2023 dt.06-01-2026
                                          11/18




       of Tamil Nadu v. Pramod Kumar, reported in (2018) 17 SCC

       677; (iii) Sunny Abraham v. Union of India, reported in (2021)

       20 SCC 12; (iv) Hukumchand Shyam Lal v. Union of India

       (AIR 1976 SC 789) and also on the decisions of this Court, in the

       cases of Manikant Pathak v. The State of Bihar, reported in

       1997 (1) PLJR 664 (FB); and Vijay Kumar Mathur v.

       SBPDCL, reported in 2023 (2) PLJR 668.

                    25. Per contra, learned Senior Counsel appearing on

       behalf of the respondents submits that the writ petition is wholly

       misconceived and devoid of any merit. It has been argued that the

       departmental proceeding against the petitioner was initiated

       strictly in accordance with law on the basis of serious charges of

       negligence of duty, which resulted in substantial financial loss to

       the Company. The proceeding was initiated by the competent

       appointing -cum- disciplinary authority, i.e. the Managing

       Director, SBPDCL, vide Resolution No. 1529. dated 12.08.2014.

                    26. The Enquiry Officer was appointed to conduct the

       departmental proceeding. The petitioner was afforded full

       opportunity to participate in the enquiry and upon completion of

       the enquiry, the Enquiry Officer submitted a detailed report, dated

       20.11.2014, wherein all five charges levelled against the petitioner

       were found proved on the basis of evidence on record. Pursuant to
Patna High Court CWJC No.314 of 2023 dt.06-01-2026
                                          12/18




       the enquiry report, a second show cause notice was issued to the

       petitioner, calling upon him to explain as to why punishment

       should not be imposed. The petitioner submitted his reply, which

       was duly considered by the disciplinary authority. Since the

       petitioner failed to rebut the findings of the Enquiry Officer by any

       cogent explanation or documentary evidence, the disciplinary

       authority, after due application of mind, imposed the punishment

       of stoppage of two annual increments with cumulative effect by a

       reasoned order, dated 13.05.2016. The punishment imposed was

       proportionate to the gravity of misconduct established in the

       enquiry.

                    27. Learned Senior Counsel further submits that the

       petitioner availed the statutory remedy of appeal. The appellate

       authority, i.e., the Chairman -cum- Managing Director, BSPHCL,

       after affording the petitioner personal hearing and considering the

       entire record, passed a detailed and speaking order. Taking a

       balanced and lenient view of the subsequent conduct of the

       petitioner, the appellate authority modified the punishment to

       stoppage of one annual increment with non-cumulative effect, vide

       Resolution No. 267, dated 14.02.2017, thereby demonstrating

       fairness, reasonableness and judicious exercise of power.
Patna High Court CWJC No.314 of 2023 dt.06-01-2026
                                          13/18




                    28. Learned Senior Counsel further submits that prior to

       filing the present writ petition, the petitioner had already

       approached this Hon’ble Court by filing CWJC No. 12243 of

       2022, wherein he had specifically undertaken to challenge only the

       order passed in the review application by filing a fresh writ

       petition. On the basis of such undertaking, the said writ petition

       was disposed of by order, dated 30.09.2022.

                    29. Accordingly, the petitioner had confined his

       grievance solely to the order passed in the review application and

       not to the earlier stages of the disciplinary proceeding. As such, the

       present writ application is not maintainable.

                    30. Learned Senior Counsel next argued that at no stage

       of the departmental enquiry nor during the appellate or review

       proceedings, did the petitioner raise any objection with regard to

       the competence or authority of the General Manager (HR &

       Administration).         Having      consciously   participated   in   the

       proceedings at all stages without any protest or objection, the

       petitioner is now estopped from raising such technical objections

       at a belated stage. Accordingly, the writ petition is liable to be

       dismissed on this ground alone.
Patna High Court CWJC No.314 of 2023 dt.06-01-2026
                                            14/18




                    31. I have heard learned Senior Counsel for the parties

       and have gone through the material available on records, including

       the impugned orders.

                    32. Upon careful consideration of the pleadings,

       documents available on record and rival submissions advanced by

       the parties, this Court finds that the foundational issue in the

       present case is as to whether the departmental proceeding was

       initiated by the authority having jurisdiction?

                    33. From perusal of records, particularly the order, dated

       26.06.2013, it appears that powers to award major and minor

       punishments to officers of the rank of Assistant Electrical Engineer

       stood vested in the Managing Director/Executive Director (HR).

       By the office order, dated 11.03.2015, the General Manager (HR &

       Administration) was authorized to exercise the powers as given in

       the schedule of delegation and was admittedly issued subsequent

       to initiation of the proceeding against the petitioner and was

       temporary in nature, subject to posting/appointment of Executive

       Director (HR). The impugned Memo No. 1530, dated 12.08.2014,

       initiating the departmental proceeding was started from service of

       memo of charge. The memo of charge was issued on 11.08.2014,

       under      the    signature     of     the    General   Manager   (HR   &

       Administration).
Patna High Court CWJC No.314 of 2023 dt.06-01-2026
                                          15/18




                    34. The provisions, contained under Rule 16 (1) of the

       2005 Rules, prescribes that the Government or appointing

       authority or any authority to which the appointing authority is

       subordinate or any other authority empowered by the general or

       special order of the Government may institute a departmental

       proceeding against any Government servant.

                    35. The issue, as raised before this Court, has been

       elaborately dealt with by a Bench of this Court, in the case of

       Uday Pratap Singh vs. The State of Bihar and Others, reported

       in 2017 (4) PLJR 195, wherein this Court, taking note of the

       relevant provisions of Rule 16 (1) of the 2005 Rules, has

       summarized that a disciplinary proceeding can only be initiated by

       an authority competent to do so.

                    36. Rule 2 (f) of the 2005 Rules, defines the appointing

       authority and inter alia under sub-Rule (iii) includes the authority

       which appointed the Government servant to such Service. The

       appointing authority would be the disciplinary authority, as per

       Rule 2 (j) of the 2005 Rules.

                    37. In the present case, the very decision to initiate the

       departmental proceeding against the petitioner was taken by the

       General Manager (HR & Administration). In paragraph 9 of the

       second supplementary counter affidavit, the respondents have
Patna High Court CWJC No.314 of 2023 dt.06-01-2026
                                          16/18




       expressly admitted that the Managing Director is the Disciplinary

       Authority in respect of the petitioner. The memo of charge, the

       second show-cause notice and the final order imposing major

       punishment, have all been issued by the General Manager (HR &

       Administration). Though, it has been argued that the order

       appointing the Enquiry Officer was issued under the direction of

       the Managing Director, but the respondents have failed to place on

       record any resolution, notification, delegation order to show that

       the General Manager (HR & Administration) was authorized to

       exercise the powers of the appointing/disciplinary authority.

                    38. Admittedly, in the memo of charge, there is no

       indication that the same was served under the direction of the

       Managing Director, i.e. the Appointing Authority. The memo of

       charge does not bear any approval of the appointing/disciplinary

       authority, thereby clearly indicating that the memo of charge was

       issued without the approval of the competent authority.

                    39. In the case of B. V. Gopinath (supra), the Supreme

       Court has held that the charge sheet/charge memo having not been

       approved by the disciplinary authority would be non est in the eyes

       of law. The said proposition has been reiterated by the Supreme

       Court, in the cases of Pramod Kumar, IPS (supra) and Sunny

       Abraham (supra).
Patna High Court CWJC No.314 of 2023 dt.06-01-2026
                                          17/18




                    40. Having considered the aforesaid discussion, on facts

       as well as on law, in the opinion of this Court, the very initiation of

       the disciplinary proceeding by the authority other than the

       appointing authority without any delegation of power in his

       favour, it is difficult to accept the submission advanced on behalf

       of    the    respondents       that    the    General   Manager   (HR   &

       Administration) was the competent authority to initiate the

       departmental proceeding against the petitioner. This Court,

       therefore, accepts the contention of the petitioner that the

       impugned orders, having been issued by an authority lacking

       jurisdiction, are wholly without authority of law. The respondents

       have failed to bring on record any contemporaneous or prior

       document, resolution, notification or order to demonstrate that the

       Managing Director had lawfully delegated his disciplinary powers

       to the General Manager (HR & Administration).

                    41. The contention of the respondents that the issue of

       incompetence of the General Manager (HR & Administration)

       while initiating departmental proceeding was not raised by the

       petitioner during the departmental proceeding and also before the

       Appellate Authority cannot be accepted for the simple reason that

       point of jurisdiction goes to the root of the case and since it is the

       legal point, as such, can be raised at any stage of the proceeding.
             Patna High Court CWJC No.314 of 2023 dt.06-01-2026
                                                       18/18




                                 42. In the circumstances, the very initiation of the

                    departmental proceeding and all consequential actions stand

                    vitiated.

                                 43.     Accordingly,        Resolution   No.   1530,   dated

                    12.08.2014, initiating departmental proceeding against the

                    petitioner, Resolution No. 664, dated 13.05.2016, imposing

                    punishment of withholding two increments with cumulative effect,

                    Resolution No. 267, dated 14.02.2017, modifying the punishment,

                    and Communication Letter No. 647 dated 22.09.2022 rejecting the

                    review application are hereby quashed.

                                 44. The respondents are directed to pay the entire

                    amount, if any, deducted in lieu of punishment awarded to the

                    petitioner within a period of one month from today.

                                 45. In the result, this writ application is allowed.

                                 46. There shall be no order as to costs.



                                                                     (Anil Kumar Sinha, J.)
Prabhakar Anand/-

AFR/NAFR                         AFR
CAV DATE                      31-10-2025
Uploading Date                06-01-2026
Transmission Date                N/A
