Bombay High Court
NAUFAL SHALIMversusTHE STATE OF MAHARASHTRA THROUGH P P AND AND ORS
- Disposal
- Disposed Off
Holding
The Court held that the pipeline may be laid within the 50‑metre mangrove buffer zone as it does not destroy mangroves and is necessary for the public good.
Summary
The petitioner, Naufal Shalim, on behalf of M/s Freelance Fish Meal and Oil Pvt Ltd, sought the High Court's prior permission to lay a 583.46‑metre outfall pipeline within the 50‑metre mangrove buffer zone for discharging treated wastewater into the sea. The company had already obtained consent from the Maharashtra Pollution Control Board and conditional approval from the Maharashtra Coastal Zone Management Authority, which required court permission per the 2018 order in PIL No. 87 of 2006. The petitioners argued that no mangroves would be destroyed and that a similar pipeline already exists in the zone. The Court examined the Public Trust Doctrine and the earlier directive that construction within 50 metres of mangroves must be stopped unless necessary for the public good. Finding that the pipeline would not harm mangroves and would serve a public‑interest purpose, the Court granted permission subject to compliance with environmental conditions. The petition was allowed and the interim application was dismissed.
Issues considered
- Whether laying a pipeline within the 50‑metre mangrove buffer zone violates the order in PIL No. 87 of 2006 directing a halt to construction within that zone.
- Whether the Public Trust Doctrine precludes any construction affecting mangroves absent a demonstrable public interest.
- Whether the High Court may grant prior permission for the pipeline despite the statutory and judicial restrictions.
Subjects
- pipeline
- treated wastewater
- mangrove buffer zone
- Public Trust Doctrine
- coastal regulation
- MCZMA
- Maharashtra Pollution Control Board
- environmental law
- writ of mandamus
Judgment
23-WP-7443-2025(C).doc
IN THE HIGH COURT OF JUDICATURE AT BOMBAY
CIRCUIT BENCH AT KOLHAPUR
CIVIL APPELLATE JURISDICTION
WRIT PETITION NO. 7443 OF 2025
WITH
INTERIM APPLICATION NO. 11196 OF 2025
IN
WRIT PETITION NO. 7443 OF 2025
Naufal Shalim ...Petitioner /
Applicant
Versus
The State of Maharashtra and Others ...Respondents
——————
Mr. M. I. Zarodarwala (Through V.C.) a/w Mr. Onkar Bajaj, for the
Petitioner / Applicant.
Mr. Vikas M. Mali, AGP for the Respondent-State.
——————
Coram : Sharmila U. Deshmukh &
Neeraj P. Dhote, JJ.
Date : August 17th , 2026.
P. C. :
1. By the present Petition, the Petitioner seeks prior permission of
this Court for laying a pipeline for the purpose of discharging the
treated wastewater, in view of the decision of this Court in PIL No.87 of
2006 dated 17th September, 2018.
2. The Petition has been iled on behalf of M/s. Freelance Fish Meal
and Oil Private Limited, located at Mirjole, MIDC, Ratnagiri, which has
Digitally
signed by
SAJAKALI
SAJAKALI LIYAKAT
LIYAKAT JAMADAR
JAMADAR Date:
2026.08.17
18:20:11
+0530
Jamadar-SL 1 of 4
23-WP-7443-2025(C).doc
been granted consent to operate by the Maharashtra Pollution Control
Board. Due to an expansion proposal, it was proposed to discharge the
treated wastewater to the extent of 300 KLD from its diferent
treatment plants into the sea, and for the said purpose, it was proposed
to lay the outfall HDPE pipeline from the plant to the landfall point.
3. The Petitioner prepared the marine environmental impact
assessment study for obtaining clearance for the release of the treated
wastewater into the sea. As per the Coastal Regulation Zone Map, out
of the entire 10.5 kilometres pipeline, 583.46 metres falls in the 50-
metre bufer zone. The Petitioner has obtained permission from the
Maharashtra Coastal Zone Management Authority, (“MCZMA”) which
has granted such permission in its meeting held on 11 th and 12th
November, 2024, with the speciic condition of obtaining prior
permission of this Court in view of the order dated 17 th September, 2018
in PIL No.87 of 2006.
4. Learned counsel appearing for the Petitioner submits that not a
single mangrove will be destroyed, and there is already another pipeline
of some other company in the said 50 metre bufer zone, and no
damage will be caused to the mangroves.
5. The Petitioner was required to approach the Hon'ble High Court in
view of the order dated 17th September, 2018 passed in PIL No.87 of
2006, by which this Court had directed that regardless of the ownership
Jamadar-SL 2 of 4
23-WP-7443-2025(C).doc
of land having mangroves, all construction taking place within 50 metres
of all sides of mangroves shall be forthwith stopped.
6. In Paragraph 83(viii), the Hon'ble Division Bench in the PIL has
held that in view of the applicability of the Public Trust Doctrine, the
State is duty bound to protect and preserve mangroves, which cannot
be permitted to be disturbed for any purpose unless the Court inds it
necessary for the public good or public interest. In view of the said
direction by the Hon'ble Division Bench, the MCZMA has imposed a
condition of obtaining prior permission of this Court for laying the
proposed pipeline within the 50 metre bufer zone.
7. We have gone through the proposal which was considered by the
MCZMA. The Authority had noted that the Petitioner has obtained the
necessary permissions from the Maharashtra Pollution Control Board
for the purpose of treating its trade eluent, and after the inal
treatment, the treated wastewater is required to be discharged and for
the said purpose, the Petitioner seeks to lay down the pipeline. As the
proposal for laying the pipeline is for the release of treated eluent,
and in the event that the permission is not granted, there is every
possibility of the treated eluent being released in areas which are
impermissible, the laying of the pipeline is for the public good. As there
is no destruction of mangroves, there would be no impact on the
mangroves.
Jamadar-SL 3 of 4
23-WP-7443-2025(C).doc
8. In light of the above, permission is granted for laying the pipeline
having a length of 583.46 metres within the 50 metre bufer zone,
subject to strict compliance with the conditions imposed by the
Maharashtra Pollution Control Board and the MCZMA.
9. The Petition is allowed in terms of prayer Clause (a) which reads
as under :
“a. This Hon’ble Court be pleased to issue Writ of Mandamus or any
other Writ in the nature or Order and Direction to the Respondent
Nos.2 & 3 to give necessary permission to lay the pipeline length 583.46
m which is falling under 50 m mangrove bufer zone i.e. throw raw
wastewater into the sea from M/s Freelance Fish Meal and Oil Pvt Ltd
located at Mirjole, MIDC, Ratnagiri, State Maharashtra.”
10. The Interim Application does not survive for consideration and
stands disposed of.
[Neeraj P. Dhote, J.] [Sharmila U. Deshmukh, J.]
Jamadar-SL 4 of 4
Checking your session…