Holding
The appellate court disposed of both appeals, directing the trial court to decide the suits expeditiously while maintaining the status quo, without setting aside the trial court’s substantive order.
Summary
The appellants, owners of shops in Khar Seven Stars Co‑op Housing Society, challenged demolition notices issued by the Municipal Corporation of Greater Mumbai (MCGM) under Section 53(1) of the Maharashtra Regional and Town Planning Act. The trial court dismissed their notice of motions and refused interim protection, prompting appeals. The appellants argued that the statutory notice period and Supreme Court demolition guidelines were not complied with, while MCGM contended that the shops violated approved plans and part demolition had already been carried out. The High Court, without expressing a prima facie view on the merits, directed the trial court to decide the two suits expeditiously within three months and to maintain the status quo, disposing of both appeals without costs.
Issues considered
- Whether the trial court erred in dismissing the appellants' notice of motion and refusing interim protection.
- Whether the MCGM complied with the notice requirements of Section 53(1) of the MRTP Act and the Supreme Court’s demolition guidelines.
- Whether further demolition can proceed absent compliance with the statutory and judicial procedural safeguards.
Legislation cited
- Maharashtra Regional and Town Planning Act — s. 53(1)
Subjects
- demolition
- unauthorised construction
- MRTP Act
- notice requirement
- interim protection
- status quo
- municipal corporation
- Supreme Court guidelines
Judgment
1 of 7 905&906.AO.957.26.DOC
IN THE HIGH COURT OF JUDICATURE AT BOMBAY
CIVIL APPELLATE JURISDICTION
APPEAL FROM ORDER NO.957 OF 2026
WITH
INTERIM APPLICATION NO.7625 OF 2026
Pradeep Motumal Karamchandani,
Shop nos.1, 2 and 3, Ground floor,
Khar Seven Sars Co-op.Hsg.Soc Ltd.,
Plot No.495, TPS III, Junction of 24th Road
and 33rd Road, Khar (W), Mumbai-400052. Appellant
versus
1. Municipal Corpn of Greater Mumbai.
2. The Designated Officer/Executive
Engineer (B&F), Ward H/West,
MCGM, Mumbai. Respondents
AND
APPEAL FROM ORDER NO.958 OF 2026
WITH
INTERIM APPLICATION NO.7624 OF 2026
Farook Yusuf Kadawala,
Shop Nos.7 & 8,
Khar Seven Sars Co-op.Hsg.Soc Ltd.,
Plot No.495, TPS III, Junction of 24th Road
and 33rd Road, Khar (W), Mumbai-400052. Appellant
versus
1. Municipal Corpn of Greater Mumbai.
2. The Designated Officer/Executive
Engineer (B&F), Ward H/West,
MCGM, Mumbai. Respondents
_______
Mr.Amogh Singh with Mr.Rutuparn Umesh Deo i/by Mr.Hardik Desai for
Appellants.
Digitally signed by
MsNeeta Jadhav i/by Ms.Komal Punjabi for Respondent-MCGM.
MANISH MANISH
SURESHRAO
SURESHRAO THATTE
THATTE Date: 2026.10.01
18:51:56 +0530
Mr.Aakash Mukesh Patil, J.E, B&F Deptt, H/West Ward, MCGM, present.
_______
M.S.Thatte
2 of 7 905&906.AO.957.26.DOC
CORAM : AARTI SATHE, J.
DATE : 1st October 2026
P.C.
1. These two Appeals from Order arise from a similar dispute namely
demolition of certain shops in the building namely Khar Seven Stars Co-
op.Hsg.Soc Ltd., Plot No.495, TPS III, Junction of 24 th Road and 33rd Road, Khar
(W), Mumbai-400052 and hence this common order would conveniently dispose
of both the Appeals from Order.
2. The order under challenge in Appeal from Order No.957 of 2026 is an
order dated 24th September 2026 passed by the City Civil Court, Dindoshi,
Mumbai (`Trial Court’) in Notice of Motion No.3069 of 2026 in L.C.Suit
No.1886 of 2026 and the order under challenge in Appeal from Order No.958 of
2026 is an order dated 23rd September 2026 passed by the Trial Court, in Notice
of Motion No.3119 of 2026 in L.C.Suit No.1959 of 2026 (`impugned orders’). By
way of the impugned orders, the Trial Court has dismissed the aforesaid two
Notice of Motions and refused to extend interim protection in respect of the
structures namely the shops and being aggrieved by the aforesaid, the Appellants
have preferred present Appeals from order.
3. Learned counsel on behalf of the Appellants has submitted that the
Trial Court has erred in not taking into consideration that Section 53(1) of the
Maharashtra Regional and Town Planning Act (`MRTP Act’) explicitly mandates
that the planning authority may, serve on the owner a notice requiring him, within
such period, being not less than one month, as may be specified, therein after the
M.S.Thatte
3 of 7 905&906.AO.957.26.DOC
service of the notice, to take such steps as may be, specified in the notice. He has
further submitted that this mandate has not been followed by the Municipal
Corporation of Greater Mumbai (`MCGM’) and the Trial Court has failed to take
into consideration the aforesaid provision. He has further submitted that the Suit
shops have been in existence since 1962-63 and further up to 2008 there were no
final/ sanctioned plans which were traceable in respect thereto. He has submitted
that considering the aforesaid and also considering the decision of the Supreme
Court in Directions in the matter of Demolition of Structures, In Re 1, the Supreme
Court has laid down guidelines which the authorities are bound to follow before
demolition of any structure. He has submitted that the aforesaid guidelines are as
follows :
“IX. Directions
93. In order to allay the fears in the minds of the citizens with regard to arbitrary
exercise of power by the officers/officials of the State, we find it necessary to issue
certain directions in exercise of our power under Article 142 of the Constitution.
We are also of the view that even after orders of demolition are passed, the affected
party needs to be given some time so as to challenge the order of demolition before
an appropriate forum. We are further of the view that even in cases of persons who
do not wish to contest the demolition order, sufficient time needs to be given to
them to vacate and arrange their affairs. It is not a happy sight to see women,
children and aged persons dragged to the streets overnight. Heavens would not fall
on the authorities if they hold their hands for some period.
94. At the outset, we clarify that these directions will not be applicable if there is
an unauthorised structure in any public place such as road, street, footpath,
abutting railway line or any river body or water bodies and also to cases where
there is an order for demolition made by a court of law.
A. Notice
94.1. No demolition should be carried out without a prior show-cause notice
returnable either in accordance with the time provided by the local municipal laws
or within 15 days' time from the date of service of such notice, whichever is later.
1(2025)5-SCC-1
M.S.Thatte
4 of 7 905&906.AO.957.26.DOC
94.2. The notice shall be served upon the owner/occupier by a registered post
A.D. Additionally, the notice shall also be affixed conspicuously on the outer
portion of the structure in question.
94.3. The time of 15 days, stated herein above, shall start from the date of receipt
of the said notice.
94.4. To prevent any allegation of backdating, we direct that as soon as the show-
cause notice is duly served, intimation thereof shall be sent to the office of
Collector/District Magistrate of the district digitally by email and an auto
generated reply acknowledging receipt of the mail should also be issued from the
office of the Collector/District Magistrate. The Collector/DM shall designate a
Nodal Officer and also assign an email address and communicate the same to all
the municipal and other authorities in charge of building regulations and
demolition within one month from today.
94.5. The notice shall contain the details regarding:
(a) The nature of the unauthorised construction.
(b) The details of the specific violation and the grounds of demolition.
(c) list of documents that the noticee is required to furnish along with his
(d) The notice should also specify the date on which the personal hearing is fixed
and the designated authority before whom the hearing will take place.
94.6. Every municipal/local authority shall assign a designated digital portal,
within 3 months from today wherein details regarding service/pasting of the
notice, the reply, the show-cause notice and the order passed thereon would be
available.
B. Personal hearing
94.7. The designated authority shall give an opportunity of personal hearing to the
person concerned.
94.8. The minutes of such a hearing shall also be recorded.
C. Final order
94.9. Upon hearing, the designated authority shall pass a final order.
94.10. The final order shall contain:
(a) The contentions of the noticee, and if the designated authority disagrees with
the same, the reasons thereof.
(b) As to whether the unauthorised construction is compoundable, if it is not so,
the reasons therefor.
(c) If the designated authority finds that only part of the construction is
unauthorised/non-compoundable, then the details thereof.
(d) As to why the extreme step of demolition is the only option available and
other options like compounding and demolishing only part of the property are not
available.
D. An opportunity of appellate and judicial scrutiny of the final order
M.S.Thatte
5 of 7 905&906.AO.957.26.DOC
94.11. We further direct that if the statute provides for an appellate opportunity
and time for filing the same, or even if it does not so, the order will not be
implemented for a period of 15 days from the date of receipt thereof. The order
shall also be displayed on the digital portal as stated above.
94.12. An opportunity should be given to the owner/occupier to remove the
unauthorised construction or demolish the same within a period of 15 days. Only
after the period of 15 days from the date of receipt of the notice has expired and
the owner/occupier has not removed/demolished the unauthorised construction,
and if the same is not stayed by any appellate authority or a court, the authority
concerned shall take steps to demolish the same. It is only such construction which
is found to be unauthorised and not compoundable shall be demolished.
94.13. Before demolition, a detailed inspection report shall be prepared by the
authority concerned signed by two panchas.
EE. Proceedings of demolition
4.14. The proceedings of demolition shall be videographed, and the authority
concerned shall prepare a demolition report giving the list of police officials and
civil personnel that participated in the demolition process. Video recording to be
duly preserved.
94.15. The said demolition report should be forwarded to the Municipal
Commissioner by email and shall also be displayed on the digital portal.
95. Needless to state that the authorities hereinafter shall strictly comply with the
aforesaid directions issued by us.
96. It will also be informed that violation of any of the directions would lead to
initiation of contempt proceedings in addition to the prosecution.
97. The officials should also be informed that if the demolition is found to be in
violation of the orders of this Court, the officer/officers concerned will be held
responsible for restitution of the demolished property at his/their personal cost in
addition to payment of damages.”
4. Learned counsel on behalf of the Appellants therefore submitted that in
the facts of the present case, the speaking order dated 3 rd September 2026 passed
by Respondent no.2 which has been passed in pursuance of notices dated 27 th July
2026 under Section 53(1) of the MRTP Act issued by Respondent no.2, has not
followed the aforesaid directions of the Supreme Court and the same has not been
M.S.Thatte
6 of 7 905&906.AO.957.26.DOC
considered even by the Trial Court, and in view thereof, the rejection of the
Notices of Motion by the Trial Court in the facts of the present case, ought to be
set aside. He has further submitted that the Trial Court has erred in coming to the
conclusion that the Appellants have not made out a prima facie case and the
Appellants have violated the approved plans and amalgamated the shops and
carried out unauthorized extension thereto. He has submitted that the aforesaid
finding is an erroneous finding inasmuch as the Appellants were never supplied
with the approved and sanctioned plans and the Suit shops are in existence since
1962-63. Learned counsel for the Appellants states that part demolition has taken
place and in view thereof, the structures which have been specified in the notices
partly are still standing at the relevant place.
5. Per contra, learned counsel for MCGM has submitted that the
impugned order of Trial Court is a well reasoned order and indeed the Appellants
have violated the approved plans and carried out amalgamation of the shops which
was not permissible. She has also submitted before this Court today that pursuant
to the notices dated 27th July 2026 and under Section 53(1) of MRTP Act issued
by Respondent no.2 and the speaking order dated 3 rd September 2026 passed by
Respondent no.2, the MCGM has carried out part demolition in respect of the Suit
shops. She has placed on record photographs to that effect and the same are taken
on record and marked “X” for identification.
6. Be that as it may, both the parties are ad idem in respect of the fact that
in respect of demolition that has taken place so far of the Suit shops, further
demolition need not be carried out and status-quo as of today be maintained and
M.S.Thatte
7 of 7 905&906.AO.957.26.DOC
the Trial Court be directed to consider all the aforesaid contentions raised by the
Appellants and the MCGM, while deciding the Suit as expeditiously as possible.
7. Considering the aforesaid submissions made by learned counsel for the
parties, this Court is of the view that without delving into the merits of the matter
and without taking any prima facie view, considering that the demolition has taken
place, the Trial Court is directed to decide both the L.C Suits as expeditiously as
possible and preferably within a period of three months from the date of uploading
of this order. Parties are directed not to take adjournments at the time of trial of
the Suits. All contentions of the parties are expressly kept open.
8. Needless to observe that this Court has not expressed any prima facie
view nor expressed any opinion on the merits of the case and the Suits shall be
decided in accordance with law and on merits.
9. Till disposal of both the L.C Suit Nos.1886 of 2026 and 1959 of 2026,
status-quo as of today shall be maintained.
10. Both the Appeals from Order stand disposed of. No costs. Interim
Applications do not survive and stand disposed of.