Bombay High Court
KESHVI DEVELOPERS PVT. LTD., THROUGH ITS DIRECTOR KAMLESH B. LIMBACHIYAversusTHE MUNICIPAL CORPORATION OF GREATER MUMBAI
- Decided
- Disposal
- DISPOSED OFF
Holding
The writ petition is dismissed as being devoid of merit.
Summary
Keshvi Developers Pvt. Ltd. and an associate filed a writ petition challenging the Brihanmumbai Municipal Corporation’s (BMC) cancellation of an In‑Office Development (IOD) permission granted to Sahakar Group for the redevelopment of Narmada Niwas CHSL, alleging that the access road to the site was less than the statutory minimum width of 9 metres required under the Development Control and Promotion Regulations. The petitioners relied on a measurement of 7.5 metres taken diagonally and claimed the BMC’s road‑width status report was inaccurate. BMC, through a detailed counter‑affidavit, produced multiple road‑width measurements taken on different dates, all showing widths ranging from 9.2 to 10.2 metres, and a joint site visit on 10 November 2025 that confirmed these figures. The Court held that the measurements were technical matters within the competence of the municipal authority and found no irregularity or illegality in BMC’s actions. Consequently, the writ petition was dismissed as being devoid of merit.
Issues considered
- The road leading to the redevelopment site complies with the statutory minimum width of 9 metres required under the applicable development regulations.
- Whether the BMC’s measurement and approval process was lawful and free from error.
- Whether the High Court can intervene under Article 226 of the Constitution in technical measurement disputes.
Legislation cited
- Development Control and Promotion Regulations, 2034 — s. Regulation 10(5)(2)
Subjects
- road width
- statutory minimum
- development control regulations
- municipal corporation
- writ petition
- Article 226
- technical measurement
- redevelopment
Judgment
Digitally signed
by PALLAVI
MAHENDRA
PALLAVI WARGAONKAR
MAHENDRA
WARGAONKAR Date:
2026.09.22
13:21:50
50-WP-4387-2025.doc
+0530
Pallavi
IN THE HIGH COURT OF JUDICATURE AT BOMBAY
ORDINARY ORIGINAL CIVIL JURISDICTION
WRIT PETITION NO. 4387 OF 2025
Keshvi Developers Pvt. Ltd. & Anr. … Petitioners
V/s.
The M.C.G.M. & Ors. … Respondents
Mr. Amrut Joshi a/w Mr. Nishant Chothani and Mr. Yash Chheda,
Mr. Nivit Srivastava and Mr. Bhavya R. Shah i/b. Maniar Srivastava
Associates for the Petitioners.
Ms. Sheetal Metakari i/b. Komal Punjabi and Mr. Rajendra B.
Dhonde, Addl. Fire Officer for Respondent - BMC.
Mr. Pankaj Savant, Senior Advocate a/w Mr. Nikhil Jayakar & Mr.
Mayank Vira i/b. Ms. Smita Sawant for the Respondent No.7.
Mr. Ramprakash Pandey for Respondent No.8.
CORAM : MAHESH CHANDRA TRIPATHI, CJ. &
ADVAIT M. SETHNA, J.
DATE : 21st SEPTEMBER, 2026.
P.C.:
1. We have heard the learned counsel for the parties and with
their assistance, we have perused the record.
2. A detailed counter affidavit dated 1 st December 2025 has been
filed by the Respondent Nos.1 to 6 - BMC. It is apposite to mention
here the complaint/grievance of the Petitioner was limited to the
extent that the width of the road of less than 9 meters, contrary to
1
50-WP-4387-2025.doc
the statutory requirement under the Act for processing such plan.
For ready reference, the relevant paragraphs of the Affidavit-in-reply
are reproduced as under :
“12. It is submitted that, as per the Architecture Plans, the subject
plot abuts on 9.00 mtrs wide Topiwala Road towards West
side. Further the L.S. has proposed 14.00 mtrs wide turning
circle towards West side and opens spaces as 6.15 mtrs to
12.34 vmirs towards South side and states that the
Maximum habitable area is accessible from the open spaces
provided towards West and South side, from where
specialized fire appliances from this department can be
operated.
13. I say and submit that considering the above parameters the
provisional fire safety approval was issued by Fire
department of Respondent /BMC as per Reg. 10(5)(2), DCPR
2034.
14. I say and submit that later on due to complaint from the
Petitioner for cancellation of the IOD dated 25.06.2025
granted to M/s, Sahakar Group/Respondent no.7 for the
redevelopment of Narmada Niwas CHSL, situated on Plot
bearing CTS No. 797 and 797/1-9, Village Pahadi, Goregaon
(West), falling within P/S Ward, the Executive Engineer
(Building Proposal) of the Respondent/BMC by a letter dated
12.11.2025 had requested Maintenance Department for
status Report of Road as the complaint pertains to the
existing road width leading to the said plot. It is alleged that
the Road Width Status issued by the P/S Ward Maintenance
Department does not reflect the actual site conditions and
that the minimum width of the road is less than 9.00 meters
as falsely represented by the Respondent no.7.
15. As per remarks of the Maintenance Department u/no.
AC/PS/26059/AEM dated 17.11.2025, I say that the
Maintenance Department of Respondent/BMC had issued
Road Width Status reports to two different applicants 1. M/s.
Tangents Design Cell on 20.12.2022 and 2. M/s. 3
Dimensional Consultants LLP on 13.06.2025 which are as
follows:-
a. In Status Report dated 20.12.2022. for the stretch Opposite
Topiwala CHS, i.e.. from "E" to "F", the recorded road width
was 10.00 meters and for the adjoining stretch opposite
Pahal Avenue, i.e., from "A" to "B" and "B" to "C", the recorded
2
50-WP-4387-2025.doc
widths were 9.30 meters and 9.20 meters respectively.
b. As per status report dated 13.6.2025, for the stretch opposite
Topiwala CHS. i.e.. from "A" to "B", three width measurements
were taken 10.20 meters, 10.00 meters, and 9.90 meters and
for the adjoining stretch opposite Pahal Avenue, i.e., from "B"
to "C", three width measurements were recorded: 9.50 meters.
9.45 meters, and 9.60 meters. At both instances, the
measurements recorded by Respondent BMC are
approximately identical, with no material deviation.
c. To ensure further clarity, a joint site visit was conducted on
10.11.2025 in the presence of the Executive Engineer
(Building Proposal) and representatives of both M/s. Keshvi
Developers Pvt. Ltd./Petitioner And M/s. Sahakar
Developers/Respondent no.7. During the site visit, the road
widths previously measured and recorded by Respondent
BMC were re-verified and found to be consistent with the
earlier measurements as issued by P/S ward.
Hereto annexed and marked as Exhibit-B, Exhibit-C and
Exhibit-D are the copies of Status Report of the said Road
width dated 20.12.2022. 13.6.2025 and 17.11.2025.
d. Both the CTS No. 797 and CTS No. 798 are located at the
dead end of the said road. A portion of the boundary of CTS
No.798 meets the main entrance gate of CTS No.797, creating
a slight offset at the end of the road. At this location, three
perpendicular road width measurements were taken 13.80
meters, 16.30 meters and 9.00 meters directly in front of the
gate of Narmada Niwas CHSL, The Petitioner's report about
width 7.50 meters corresponds to a diagonal measurement
taken fr the offset portion toward Topiwala Mall and does not
repres the perpendicular road width. As per the standard
engineer practices used for determining road width the width
has to measured perpendicular to the alignment of road, the
diago measurement submitted by petitioner does not align w
standard engineering practices used for determining road
width,
I say and submit that, the above remarks shows factual
and technical position of Respondent BMC regarding road
width status of the road leading to Plot CTS No.797. I and
submit that, furthermore, the road is a Municipal Road a
maintained by the Brihanmumbai Municipal Corporation (BM
Also, municipal utilities such as the storm-water drain and str
connection exist along this stretch. The road corresponds to C
No. 746/1, as reflected in the Development Plan extract
attach The road surface is developed with asphalt.”
3
50-WP-4387-2025.doc
3. A perusal of the above makes it clear that the Respondent -
BMC has also carried out joint inspection/visit of the said road/site
on 10th November 2025, in the presence of the parties to the
proceedings, including the Petitioner and Respondent No.7.
4. In light of the above, we do not find any irregularity, much
less illegality in the action of the Respondent – BMC which would
warrant interference in writ jurisdiction. These are matters of
measurement involving technical nuisances/expertise which the
Respondent – BMC being the Competent Authority has duly carried
out. Allegations of mistake and/or discrepancies in such exercise as
urged by Mr. Joshi, learned counsel for the Petitioner does not
justify and/or warrant issuing any positive directions in these
proceedings, preferred under Article 226 of the Constitution of
India.
5. Confronted with the factual situation that has emerged and
for the reasons noted above, we are not inclined to proceed further
in the matter and/or issue any directions.
6. In our considered view, Writ Petition is devoid of merit and is
accordingly Dismissed.
[ADVAIT M. SETHNA, J.] [CHIEF JUSTICE]
4
Checking your session…