Bombay High Court
ANNASAHEB CHUDAMAN PATIL COLLEGE OF ENGINEERING THR ITS PRINCIPAL AND ANRversusUNIVERSITY OF MUMBAI THR THE REGISTRAR AND ORS
- Decided
- Disposal
- Disposed Off
Holding
The Grievance Redressal Committee correctly directed implementation of the 7th Pay Commission recommendations from 1 January 2016 and the petition is dismissed.
Summary
The petitioners, an unaided engineering college run by a charitable trust, challenged an order of the University of Mumbai's Grievance Redressal Committee directing them to implement the 7th Pay Commission salary scales retroactively from 1 January 2016 and to pay arrears to teaching staff (respondents 3‑14). The petitioners argued that financial distress caused by declining admissions made the retroactive implementation untenable, while the respondents contended that statutory notifications required the pay scales to be applied from the 2016 date. The Court examined precedents such as Secretary Mahatma Gandhi Mission and Frank Anthony Public School Employees, holding that financial constraints do not excuse compliance with statutory pay obligations. It affirmed that the Grievance Redressal Committee acted within its jurisdiction under the Maharashtra Public Universities Act and correctly directed the petitioners to honour the pay scales and arrears. Consequently, the writ petition was dismissed.
Issues considered
- Whether an unaided private college affiliated to a public university is bound to implement the 7th Pay Commission salary scales retroactively from 1 January 2016.
- Whether financial hardship of the institution can justify deferral of implementation of the revised pay scales.
- Whether the teaching staff are entitled to arrears of salary for the period preceding the filing of their grievances.
- Whether the Grievance Redressal Committee had jurisdiction to issue the direction under the Maharashtra Public Universities Act.
Legislation cited
Subjects
- 7th Pay Commission
- salary arrears
- grievance redressal
- unaided college
- financial constraints
- Article 227
- Maharashtra Public Universities Act
- retroactive pay
- service book
Judgment
WP-8424-26.DOC
IN THE HIGH COURT OF JUDICATURE AT BOMBAY
CIVIL APPELLATE JURISDICTION
WRIT PETITION NO. 8424 OF 2026
1. Annasaheb Chudaman Patil
College of Engineering,
through its Principal,
Plot No.17, Sector-4,
Opp. Kharghar Railway Station,
Navi Mumbai-410210.
2. Jawahar Education Society,
through its Chairman,
having office at :
Plot No.17, Sector-4,
Opp. Kharghar Railway Station,
Navi Mumbai-410210. ...Petitioners
Versus
1. University of Mumbai,
through the Registrar,
Fort Campus, M. G. Road,
Mumbai – 400032.
2. The Grievance Redressal Committee,
University of Mumbai,
through its Chairman,
SAINATH
SANJAY Fort Campus, M. G. Road,
BODKHE
Digitally signed by
Mumbai – 400032.
SAINATH SANJAY
BODKHE
Date: 2026.09.30
21:35:21 +0530
3. Mrs. Ranjana Jitendra Mahajan
B-406, Ajanta Sea Breeze CHS,
Sector – 14, Airoli,
Navi Mumbai – 400708.
4. Ms. Anagha Vijay Malkapurkar
103, Raliya Residency,
Pt. No. 179D, Sector-30,
Kharghar, Navi Mumbai.
5. Shri Sachin Dewaji Chaure
SAINATH, PA 1/17
WP-8424-26.DOC
Mahalaxmi City, Type-E,
Bldg. No.04, Flat No.A-203,
Vihighar, New Panvel-410206.
6. Shri Pandit Tulshiram Yewale
Flat No.402, Sutar Tower CHS Ltd.,
Plot No.D-4, Sector-20, Airoli,
Navi Mumbai.
7. Shri Pundlik Narayanrao Ghate
202, Shree Shiv Sai CHS,
Plot No.50 & 51, Sector-19,
Kharghar, Navi Mumbai.
8. Mrs. Sandhya Ajay Awate
Himgiri Apts, C-6-9, O-4,
Sector-06, CBD Belapur,
Navi Mumbai – 400614.
9. Smt. Shital Abhishek Patil
B-4, Build. No.01,
Neelkanth Prerana,
Karve Road, Vishnu Nagar,
Dombivali (W) – 421202.
10. Shri Sandeep Nilkanthrao Zade
E-1404, Devdarshan CHS,
Sector-19, Kharghar,
Navi Mumbai – 410210.
11. Shri Ravindra Pandit Patil
B-104, Ashapura Sadan CHS,
Plot No.45/46, Sector-09,
Khanda Colony,
New Panvel (W) – 410206.
12. Shri Sandeep Wamanrao Matey
Mahavir Shraddha, B-606,
Plot No.12, Sector-14,
Kopar Khairane,
Navi Mumbai – 400709.
13. Shri Ratan Ramchandra Kamble
SAINATH, PA 2/17
WP-8424-26.DOC
Shree Jai Ganesh CHS,
C-405, Sector-36, Plot No.34,
Kamothe – 410206.
14. Shri Sanjay Ambadas Patil
Flat No.501, Tower No.05,
New Satara CHS, Plot No.A/24-E,
Kharghar, Navi Mumbai – 410210. …Respondents
_________
_____________ _______ ___
Mr. Aadesh Konde Deshmukh, a/w Mr. Sainath Garade, Mr.
Yogesh Sukale, Ms. Shruti Pokale, Yuganter Goel, for the
Petitioners.
Mr. Mohd. Monis, i/b Rui Rodrigues, for Respondent No.1.
Mr. Avinash Belge, for Respondent Nos. 3 - 14.
_____________________________________
CORAM : N. J. JAMADAR, J.
RESERVED ON : 10th SEPTEMBER 2026
PRONOUNCED ON : 30th SEPTEMBER 2026
JUDGMENT:
1. Rule.
2. Rule made returnable forthwith, and with the consent of
the learned Counsel for the parties, heard finally.
3. This petition under Article 227 of the Constitution of
India, calls in question the legality, propriety and correctness of
an order dated 20th June, 2024 passed by the Grievance
SAINATH, PA 3/17
WP-8424-26.DOC
Redressal Committee, University of Mumbai (R-2) in the
grievances filed by the Respondent Nos.3 to 14, whereby the
petitioners have been directed to fix the salaries of the
Respondent Nos.3 to 14 as per the 7 th Pay Commission Report
w.e.f. 01st January, 2016 and also pay the arrears of salary
within a period of 9 months thereof, and furnish the copies of
respective service books to Respondent Nos.3 to 14.
4. The background facts can be stated, in brief, as under :-
4.1 The Petitioner No.2 is a Public Charitable Trust registered
under the provisions of Maharashtra Public Trust Act, 1950.
The Petitioner No.2 runs Petitioner No.1 – College. The
Petitioner No.1 is an Unaided Institution and the expenses
incurred to run the College are met from the tuition fees and
institutional income. The petitioners claimed, the Petitioner
No.1 – College operates strictly on a no-profit-no-loss basis.
4.2 The Respondent Nos. 3 to 14 are the members of the
teaching staff. In the year 2022, Respondent Nos.3 to 14 lodged
their grievances with the Grievance Redressal Committee of the
University of Mumbai (R-2), inter alia, seeking implementation
of the 7th Pay Commission Pay Scales w.e.f. 01 st January, 2016
and the arrears of pay.
SAINATH, PA 4/17
WP-8424-26.DOC
4.3 By the impugned order, the Grievance Redressal
Committee, University of Mumbai (R-2) allowed the grievance
application observing, inter alia, that, the Government of
Maharashtra has directed the Universities to implement the 7 th
Pay Commission Report w.e.f. 01 st January, 2016 in case of
employees working in the affiliated colleges; aided or unaided.
The University of Mumbai has, in turn, directed all the
affiliated colleges, including the Petitioner No.1, to pay salaries
as per the 7th Pay Commission Report. Therefore, the
Respondent Nos.3 to 14 were entitled to the pay scales as per
the 7th Pay Commission Report and copies of their respective
service books.
4.4 The Grievance Redressal Committee noted that, the
representative of the petitioners has submitted that, the
petitioners were in the process of implementing the 7 th Pay
Commission recommendations and a period of one year was
required to fully implement the said recommendations. Thus,
the Grievance Redressal Committee was persuaded to grant 9
months period from the date of communication of the said
order to pay the salary, allowances and also the arrears as per
the 7th Pay Commission recommendations.
SAINATH, PA 5/17
WP-8424-26.DOC
4.5 Being aggrieved by and dissatisfied with the impugned
order, the petitioners have preferred this Writ Petition. It was
inter alia asserted that, despite the petitioners having brought
to the notice of the Grievance Redressal Committee that, on
account of the declining number of admissions, huge vacancies
in the sanctioned student intake and the resultant financial
stress, the Grievance Redressal Committee has directed the
petitioners to implement the 7th Pay Commission
recommendations retrospectively w.e.f. 01st January, 2016 and
that would put an unbearable financial burden on the
petitioners and thereby impair the very capacity of the
petitioners to run the Petitioner No.1 – College. The petitioners
have no qualm over the implementation of the 7 th Pay
Commission recommendations prospectively and have, in fact,
extended the benefit thereof since the year 2025. The direction for
implementation of the 7th Pay Commission recommendations
w.e.f. 01st January, 2016, however, is extremely onerous.
5. I have heard Mr. Aadesh Konde Deshmukh, the learned
Counsel for the petitioners, Mr. Mohammed Anis, the learned
Counsel for Respondent No.1, and Mr. Avinash Belge, the
learned Counsel for Respondent Nos. 3 to 14. With the
SAINATH, PA 6/17
WP-8424-26.DOC
assistance of the learned Counsel for the parties, I have also
perused the material on record.
6. Mr. Aadesh Konde Deshmukh, the learned Counsel for
the petitioners, strenuously submitted that the Grievance
Redressal Committee (R-2) did not correctly appreciate the
consequences that would result from the implementation of the
7th Pay Commission recommendations w.e.f. 01st January, 2016.
It was not the case that, there was willful omission to extend
the benefit of the 7th Pay Commission recommendations. In
fact, the petitioners have extended the pay scales in accordance
with the 7th Pay Commission recommendations since the year
2025. That underscores the bona fide intent of the petitioners.
In this backdrop, the Grievance Redressal Committee (R-2)
could not have directed the implementation of the 7 th Pay
Commission recommendations from 01st January, 2016.
7. In the process, Mr. Konde Deshmukh would urge, the
Grievance Redressal Committee (R-2) lost sight of the reasons
ascribed by the petitioners for not extending the benefit of 7 th
Pay Commission recommendations since 01st January 2016.
Laying emphasis on the fact that, the petitioners have
consistently pleaded that, on account of reduction in the
SAINATH, PA 7/17
WP-8424-26.DOC
student strength and diminished admissions, they were put to
severe financial constraints, and, yet, the petitioners have
implemented the 7th Pay Commission recommendations since
January 2025, Mr Konde Deshmukh urged that, the direction
for implementation of the 7th Pay Commission
recommendations since 01st January, 2016 was wholly
unwarranted and uncalled for.
8. At any rate, Mr. Konde Deshmukh would urge, the
arrears of pay could not have been claimed and directed to be
paid by the Grievance Redressal Committee (R-2) for a period
preceding 3 years prior to the lodging of the grievances.
Therefore, the impugned order warrants interference to the
extent of the direction for the implementation of the 7 th Pay
Commission recommendations w.e.f. 01st January, 2016.
9. Mr. Avinash Belge, the learned Counsel for Respondent
Nos.3 to 14, countered the submissions on behalf of the
petitioners with equal tenacity. Mr. Belge submitted that, from
the perusal of the impugned order passed by the Grievance
Redressal Committee (R-2), it becomes evident that, the
representative of the petitioners had only sought time of about
one year to implement the 7th Pay Commission
SAINATH, PA 8/17
WP-8424-26.DOC
recommendations. The grounds now sought to be urged before
this Court, were not raised before the Grievance Redressal
Committee (R-2). The entitlement of Respondent Nos.3 to 14 to
the pay and allowances as per the 7th Pay Commission
recommendations is incontrovertible. In fact, the petitioners
claimed that, they have implemented the 7 th Pay Commission
recommendations w.e.f. January, 2025. In this view of the
matter, the controversy sought to be raised with regard to the
date of implementation of the 7th Pay Commission
recommendations, need not detain the Court, urged Mr. Belge.
10. It was submitted that, this Court has repeatedly held
that, the notifications issued by the State Government and the
University of Mumbai, make it explicitly clear that, the pay
scales as per the 7th Pay Commission recommendations was to
be given from 01st January, 2016. The submissions like the one
canvassed in this petition premised on the financial constraints
and difficulties in the implementation of the 7 th Pay
Commission recommendations, have been repeatedly repelled
by the Supreme Court and this Court.
11. To buttress this submission, Mr. Belge placed reliance on
a judgment of the Supreme Court in the case of Secretary,
SAINATH, PA 9/17
WP-8424-26.DOC
Mahatma Gandhi Mission & ors. Vs. Bhartiya Kamgar Sena &
ors.1, and the Division Bench judgments of this Court in the
cases of Barun Kumar s/o Manmohan Choudhary & ors. Vs.
The State of Maharashtra & ors. 2, Bhausaheb Lakshman
Kalunke Vs. The State of Maharashtra & ors.3, and Dr. Dinesh
Kumar Omkarnath Agarwal & ors. Vs. State of Maharashtra &
ors4.
12. To start with, it is necessary to note that, there is no
controversy over the fact that the Respondent Nos. 3 to 14 are
entitled to pay and allowances in accordance with the
recommendations of the 7th Pay Commission. By and large, it is
not in dispute that vide notification dated 01 st March, 2019, the
All India Council for Technical Education (“AICTE”) has revised
the pay scales of the teaching staff employed in technical
institutions as per the 7th Pay Commission recommendations
w.e.f. 01st January, 2016. The Government of Maharashtra vide
GRs dated 08th March, 2019 and 11th September, 2019 has
resolved to implement the revised pay scales of the teachers
appointed in colleges affiliated to the public universities. The
1 (2017) 4 SCC 449
2 WP/5134/2018+ dt.19/04/2022
3 WP/10652/2019 dt.17/10/2022
4 WP/2683/2021+ dt. 17/11/2022
SAINATH, PA 10/17
WP-8424-26.DOC
petitioners, in fact, claimed to have extended the benefit of the
revised pay scale since January, 2025. The controversy, thus,
lies in a narrow compass; whether the implementation of the
revised pay scales could be deferred to a date beyond 01
January, 2016 on account of purported financial difficulties ?
13. Mr. Konde Deshmukh, the learned Counsel for the
petitioners, as noted above, made a strenuous effort to
persuade the Court to hold that, the implementation of the 7 th
Pay Commission recommendations w.e.f. 01st January, 2016
would cripple the finances of the petitioners and would
eventually affect the operation of the Petitioner No.1 – college. It
was submitted that, over a period of time there has been a
gradual decrease in the number of admissions and the revenue
generated by the petitioners in the form of fees has
considerably declined. Even the fee structure was revised on
account of the reduction in number of the students. These
factors, Mr. Konde Deshmukh would submit, ought to have
been adequately considered by the Grievance Redressal
Committee (R-2).
14. The edifice of the aforesaid submission was that, since
the petitioners do not receive any grant-in-aid, an onerous
SAINATH, PA 11/17
WP-8424-26.DOC
liability to pay the salary and allowances as per the 7th Pay
Commission, cannot be fastened on the petitioners. I am afraid,
it is too late in the day to canvass the aforesaid submissions.
15. In the case of Secretary, Mahatma Gandhi Mission
(supra), the Supreme Court repelled the precise submission
sought to be canvassed on behalf of the petitioners. The
Supreme Court in terms observed that, the institutions were
obliged under law to pay the salaries and allowances in
accordance with the governing pay commission
recommendations which were ordered to be implemented by
the AICTE, the State Government and the University to which
the institutions were affiliated, and it was for the institutions to
work out their remedies and find out ways and means to meet
the financial liability arising out of the obligation to pay the
revised pay scales.
16. It is judicially recognized that, the financial constraint is
the first line of defence to the claim for revised pay scale. The
standard objection is that, if the institution is compelled to pay
the salary to the members of the staff, in accordance with the
revised pay scales, the institution will have to close down. The
Supreme Court, in the case of Frank Anthony Public School
SAINATH, PA 12/17
WP-8424-26.DOC
Employees Assn. Vs. Union of India5, emphasized the
inappositeness of the aforesaid line of objections in the
following words :-
“23. We must refer to the submissions of Mr Frank
Anthony regarding the excellence of the institution and
the fear that the institution may have to close down if
they have to pay higher scales of salary and allowances to
the members of the staff. As we said earlier the excellence
of the institution is largely dependent on the excellence of
the teachers and it is no answer to the demand of the
teachers for higher salaries to say that in view of the high
reputation enjoyed by the institution for its excellence, it
is unnecessary to seek to apply provisions like Section 10
the Delhi School Education Act to the Frank Anthony
Public School. On the other hand, we should think that
the very contribution made by the teachers to earn for
the institution the high reputation that it enjoys should
spur the management to adopt at least the same scales of
pay as the other institutions to which Section 10 applies.
Regarding the fear expressed by Shri Frank Anthony that
the institution may have to close down we can only hope
that the management will do nothing to the nose to spite
the face, merely to "put the teachers in their proper
place". The fear expressed by the management here has
the same ring as the fear expressed invariably by the
management of every industry that disastrous results
would follow which may even lead to the closing down of
the industry if wage scales are revised.”
(emphasis supplied)
5 (1986) 4 SCC 707
SAINATH, PA 13/17
WP-8424-26.DOC
17. Indeed, this Court has repeatedly rejected the
submissions on the part of the institutions premised on the
financial constraints that, the recommendations may not be
implemented from an anterior date, from which they became
effective.
18. In the case of Dr. Suryaprakash Dhaneria Vs. State of
Maharashtra & ors.6, a Division Bench of this Court did not
approve of the objections rested in the purported delay in
seeking the revised pay scale on the part of an employee. The
Division Bench observed as under :-
“18. Once it is concluded that it was obligatory on the
part of the management to make the payment of
salary as per the Vth Pay Commission
recommendations, refusal or denial to make the
payment would not shift the blame to the petitioner.
By refusing to make the payment, the management
has committed a wrong and when the petitioner waited
for the management to take a decision and approached
this Court after he was exasperated and exhausted,
accepting the contention of the management that
delay would deprive him of the benefits, would amount
to accepting the contention that delay would legalise
an illegality. We are of this view since we are taking
cognizance of the representations made by the
6 2018 (3) Mh.L.J. 567
SAINATH, PA 14/17
WP-8424-26.DOC
petitioner to the management, which would indicate
that he was not sleeping over his rights.”
(emphasis supplied)
19. In the case of Barun Kumar Choudhary (supra), after an
exhaustive analysis of the previous precedents including the
decision in the case of Secretary, Mahatma Gandhi Mission
(supra) and Dr. Suryaprakash Dhaneria (supra), another
Division Bench enunciated the legal position as under :-
“89. Having considered the above position, it is
clear that there is a liability cast upon the Management
to pay the arrears of the 6th Pay Commission and other
dues. It is not a matter of charity. At the time of seeking
recognition/approval, the Management has to give an
undertaking that all stating dues will be paid. The issue
as to whether the 6th Pay Commission would apply to
un-aided Institutions, such as present Management,
was decided by the Supreme Court in the case of
Secretary, Mahatma Gandhi Mission (supra). This
decision was rendered on 5 January 2017. The
Employees and their Association had made
representations to the Management. All the Petitioners
in these petitions are appointees prior to the date of the
decision of the Supreme Court. The Petitioners
Employees filed the petitions once the Supreme Court
rendered the decision and legal rights arose. There is no
indication in the decision of the Supreme Court in the
case of Secretary, Mahatma Gandhi Mission (supra),
that the dues need to be restricted to three years.
SAINATH, PA 15/17
WP-8424-26.DOC
90. The Division Benches of this Court, having
considered the legal position, have taken the view that if
a representation is made, it will be unjust to deprive the
teaching and non-teaching staff of the benefits of the 6 th
Pay Commission. There is no reason why we should
take a different view. We, therefore, uphold the
contention of the Employees that they are entitled to
their dues as prayed for from the date of their
entitlement and reject the contention of the
Management that its liability to pay the Employees will
be three years prior to filing of the petitions.”
(emphasis supplied)
20. It would be superfluous to multiply the pronouncements
which have emphasized that, the employees who have been
wrongfully deprived of the benefit of the revised pay scales,
should not be deprived of the arrears of pay and allowances for
the period preceding 3 years before the filing of the petition or
grievance before the Tribunal/statutory Authorities.
21. In the case at hand, this Court finds that, the
Respondent Nos.3 to 14 were diligent in pursuing their
remedies. The Respondent Nos.3 to 14 had initially addressed
their grievances to the office bearers of the Petitioner No.1,
authorities of the University and AICTE. Eventually, the
Respondent Nos. 3 to 14 filed grievances before the Grievance
Redressal Committee (R-2) constituted under Section 79 of the
SAINATH, PA 16/17
WP-8424-26.DOC
Maharashtra Public Universities Act, 2016. Thus, it cannot be
said that, the Respondent Nos.3 to 14 were not agitating their
claim for the revised pay scales, diligently.
22. The conspectus of the aforesaid consideration is that, the
Grievance Redressal Committee (R-2) has correctly intervened
in the matter and directed the petitioners to discharge their
statutory obligations. In exercise of its supervisory jurisdiction,
this Court does not find any justifiable reason to interfere with
the impugned order which is in consonance with law.
23. The writ petition, therefore, deserves to be dismissed.
Hence, the following order :-
::ORDER::
(i) The Writ Petition stands dismissed.
(ii) Rule discharged.
No costs.
[N. J. JAMADAR, J.]
SAINATH, PA 17/17