CHAIRMAN, INDORE VIKAS PRADHIKARANversusM/S PURE INDUSTRIAL COCK & CHEM. LID. AND ORS.
- Citation
- 2007 INSC 588
- Decided
- 15 May 2007
- Disposal
- Disposed off
- Bench
- S B SINHA
Holding
A town development scheme may be declared only after a final development plan is sanctioned; a draft plan does not confer jurisdiction, and the authority's jurisdiction cannot be expanded by subsequent notifications.
Summary
The case concerned the authority of the Indore Vikas Pradhikaran (the appellant) to declare its intention to prepare a town development scheme under Section 50 of the Madhya Pradesh Nagar Tatha Gram Nivesh Adhiniyam, when the development plan for the area had not been finalized. The appellant argued that a draft development plan sufficed and that a later notification extending the planning area automatically expanded its jurisdiction. The respondents (property owners, including Pure Industrial Cock & Chem Ltd.) contended that the authority lacked jurisdiction over their villages and that a draft plan could not trigger Section 53’s freeze on land use. The Supreme Court held that a development plan must be final before a town development scheme can be declared, that a draft plan is not determinative, and that the authority’s jurisdiction cannot be enlarged by subsequent notifications without a fresh statutory amendment. Consequently, the declaration under Section 50 was illegal and the High Court’s striking down of it was affirmed.
Issues considered
- Whether a declaration of intention to prepare a town development scheme under Section 50(2) can be made before a development plan is finalized.
- Whether a draft development plan is to be treated as a development plan for the purposes of the Act.
- Whether the authority's jurisdiction can be automatically extended by a later notification/amendment by the District Planning Committee.
- Whether Section 53 can be invoked to freeze land use in the absence of a final development plan.
- Whether the High Court was correct in striking down the declaration.
Legislation cited
- Madhya Pradesh Nagar Tatha Gram Nivesh Adhiniyam, 1973s. 13, s. 16, s. 17, s. 17A, s. 18, s. 19, s. 1(j), s. 20, s. 24, s. 2(i), s. 2(o), s. 2(u), s. 2(v), s. 38, s. 49, s. 50, s. 53
Subjects
Judgment
CHAIRMAN, INDORE VIKAS PRADHIKARAN A
v.
MIS PURE INDUSTRIAL COCK & CHEM. LID. AND ORS.
MAY 15, 2007
[S.B. SINHA AND MARKANDEY KA TJU, JJ.) B
Madhya Pradesh Nagar Tatha Gram Nivesh Adhiniyam (No. 23 of
1973)-Section l(j), 2(i), 2(o), 2(u), 2(v), 13. 16, 17, 17A, 18, 19, 20, 24,
38, 49, 50 & 53-Madhya Pradesh Bhumi Vikas Niyam 1984-Publication C
of draft development plan of a planning area by Town and Country
Development Authority calling for objections and suggestions-Notification
by the Authority declaring its intention to prepare a town development
scheme-State Government rejecting the draft development plan-Authority
declining to grant permission to property owners for construction in view of
the notification-High Court allowing the Writ Petitions of property owners D
by striking down the notification-Correctness of-Held, words used in the
Act should be given a literal meaning unless the context otherwise requires-
Development plan does not include draft development plan-Notification
issued by the Authority without a sanctioned development plan is wholly
illegal and hence struck down-On facts, the Authority does not have
jurisdiction over the lands of the property owners. E
A Notification was issued initially by State Government under section
13(1) of the Madhya Pradesh Nagar Tatha Gram Nivesh Adhiniyam (No. 23
of 1973) (for short "the Act") laying down the limits of City Planning Area
constituting certain villages. Later, another notification wa issued amending F
the Planning Area by adding more villages including the two villages in
question in which respondents' lands are situated, and deleting some villages.
Thereafter, the appellant-Authority published a draft development plan of the
Planning Area under Section 18 of the Act and called for any objections and
suggestions in respect thereof. In anticipation of the sanction of the draft
development plan by he State Government, the appellant published a declaration G
of intention for preparing a town planning scheme in the Planning Area in
Official Gazette under section 50(2) of the Act. The draft development plan
came to be ultimately not sanctioned by the State Government.
The applications made by the respondents for permission for
799 H
800 SUPREME COURT REPORTS [2007] 6 S.C.R.
...... ..
A construction were rejected by the appellant on the ground of the declaration
made under section 50(2) of the Act. Writ Petitions preferred by the
respondents challenging the rejection of their applications seeking
permissions were allowed by the High Court by striking down the declaration
by holding that the draft town development scheme cannot be published by the
appellant without a development plan coming into force under the Act; that
B such a draft scheme cannot by itself restrict the right of a person to use his
property in the manner he likes; and that the appellant-Authority does not
have jurisdiction over the two villages in question.
In appeal to this Court, the appellant contended that under the Act, a ..(
c development plan includes a draft development plan; that the existence of a
draft development plan would authorize it to declare its intention to prepare a
town development scheme at any time under section 50 of the Act; that the
preparation of the draft scheme under section 50 of the Act is not subject to
the sanction of final development plan and that section 50 must be read in
contrast with section 20 of the Act; that section 53 would operate as soon a
D declaration is made under section 50 or otherwise section 53 of the Act would
become otiose; that the draft town development scheme covers the villages in
question; that private interest must be waived to public interest; and that the
...
extention of the planning area by subsequent notification would ipso factor
..._
enlarge the jurisdiction of the appellant in applying the purported town
development scheme.
E
The respondents contended that their lands are situated outside the
planning area over which the appellant has jurisdiction; that the extention of
the planning area by a subsequent notification would not ipso factor enlarge
the jurisdiction of the appellant; that the definition of the 'town development
scheme' under section 2(u) of the Act presupposes an existence of a sanctioned
F
development plan and hence the draft town development scheme is illegal; that
public interest has sufficiently been safeguarded under the Act; and that a
vested right had accrued in favour of them on obtaining sanction from the
..,. -
Gram Panchayat which cannot be taken away.
G Dismissing the appeals, the Court
HELD: 1.1. A statute should be considered in such a manner as a result
whereof greater hardship is not caused to the citizens than actually -:<._-
contemplated thereby. Whereas an attempt should be made to prevent
unplanned and haphazard development, the same would not mean that the court
H would close its eyes to the blatant illegalities committed by the State and/or
CHAIRMAN, INDORE VIKAS PRADHIKARAN' PL'RE INDUSTRIAL COCK & CHEM LTD 8QJ
the statutory authorities in implementation thereof. Implementation of such A
land development as also building laws should be in consonance with public
welfare and convenience. The public authority may have general
considerations, safety or general welfare in mind, but the same would become
irrelevant, since statutory rights of a party cannot be taken away. The Cou~
must make an endeavour to strike a balance between public interest on the
one hand and protection of a constitutional right of a citizen to hold property B
on the other. IPara 4711820-G-H; 821-A-Bl
1.2. An endeavour should be made to find out as to whether the statute
). takes care of public interest in the matter as against the private interest, on
the one hand, and the effect of lapse and/or positive inaction on the part of the C
State and other planning authorities, on the other. The courts cannot also be
oblivious of the fact that the owners who are subject to the embargos placed
under the statute are deprived of their valuable rightful use of the property
for a long time. When a pu,blic authority is asked to perform statutory duties
within the time stipulated, it is directory in nature but when it involves valuable
rights of the citizens and provides for the consequences therefore, it would D
be mandatory in character. The courts should, therefore, strive to find a
balance of the competing interest (Paras 48, 49 and 53( [821-C-E; 822-F-Gf
T. Vijayalakshmi v. Town Planning Member, (2006( 8 SCC 502; Prakash
Amichand Shah v. State of Gujarat & Ors., [1986( 1 SCC 581 and State of
Gujarat v. Shanti/al Mangaldas & Ors., (196913SCR341, referred to. E
1.3. The Madhya Pradesh Nagar Tatha Gram Nivesh Adhiniyam (No.
23 of 1973) (Act), being regulatory in nature as by reason thereof the right
of an owner of property to use and develop stands restricted, requires strict
construction. An owner of land ordinarily would be entitled to use or develop F
the same for any purpose unless there exists certain regulation in a statute
or a statutory rules. Regulations contained in such statute must be interpreted
in such a manner so as to least interfere with the right of property of the
owner of such land. Restrictions are made in larger public interest. Such
restrictions, indisputably must be a reasonable one. The statutory scheme
contemplates that a person and owner of land should not ordinarily be deprived G
from the user thereof by way of reservation or designation. Expropriatory
legislations must be given a strict construction
- >:- [Paras 59 and 60( [823-E-H; 824-A)
Bairam Kumwat v. Union of India & Ors., [2003( 7 SCC 628; Krishi
H
802 SUPREME COURT' REPORTS [2007) 6 S.C.R.
A Utpadan Mandi Samiti & Ors. v. Pilibhit Pantnagar Beej Ltd & Anr., f20041
1 SCC 391; Union of India & Ors. v. West Coast Paper Mills ltd. & Anr.,
(20041 2 SCC 747; Hindustan Petroleum Corporation Ltd v. Daius Shapur
Chenai & Ors., [2005[ 7 SCC 627; State of Rajasthan & Ors. v. Basant
Nahata, JT [20051 8 SC 171; State of Uttar Pradesh v. Manohar, [20051 8
SCC 126 (CB); Jilubhai Nanbhai Khachar & Ors. v. State of Gujarat & Anr..
B f 19951 Supp. 1. SCC 596; Pt. Chet Ram Vashist (Dead) by LRs. v. Municipal
Corporatfon of Delhi, f19951 l SCC 47 and Raju S. Jethma/ani v. State :Jf
Maharashtra, (2005) 4 ~CALE 688, referred to.
Sri Krishnapur Mutt. Udupi v. N. Vijayendra Shetty & :for., (1992) 3 -4..
C Kar.LJ. 326, referred to.
1.4. A draft development plan which has not attained finality cannot be
held to be determinative of the rights and obligations of the parties and, thus,
it can never be implemented. Section 50 of the Act explicitly states that the
authority may declare its intention to prepafle a town development scheme
D which having regard to Section 2(u) of the Act must be read to mean
declaration of its implementation to prepare a scheme for the implementation
of the provisions of a development plan. Had the legislature thought of
implementation of a draft development plan, they could have also provided for
an interim development plan which ipso facto would have been enforceable. A
-
development plan can be implemented only when it is final and not when it is
E at the draft stage, i.e., susceptible to changes.
[Paras 73, 74 and 751 (829-E-H; 830-A-B)
1.5. A meaning assigned to a term as defined in the interpretation clause
unless the context otherwise requires should be given the same meaning. In
F the absence of any context indicating a contrary intention, the same meaning
would be attached to the word used in the latter as is given to them in the
earlier statute. The words or expression used in a statute before and after
amendment should be given the same meaning. [Paras 75 and 76) [830-B-C)
Venkata Subamma & Anr. v. Ramayya and Ors., AIR (1932) PC 92,
G referred to.
Lehnon v. Gobson & Howes Ltd., (1919) AC 709, refereed to.
Craies on Statute Law, Seventh Edition; G. P. Singh 's Principles of ~. -
Statutory Interpretation, Tenth edition, referred to.
H
• >..
CHAIRMAN, INDORE VIKAS PRADHIKARAN '· PURE INDUSTRIAL COCK & CHEM LTD 803
1.6. Land use, development plan and zonal plan provided for the plan at A
macro level whereas the town planning scheme is at a micro level and, thus,
would be subject to development plan. A purpose which is otherwise not
contemplated under Chapter IV would be brought in by side door in Chapter
VII of the Act That which cannot be done directly cannot be permitted to be
done indirectly. (Paras 78 and 80) (830-F; 831-A-B]
B
1.7. The purpose of declaring the intent under Section 50(1) of the Act
is to implement a development plan. Section 53 of the Act freezing any other
~-\ development is an incidence arising consequent to the purpose, which purpose
is to implement a development plan. If the purpose of declaring such an
intention is merely to bring into play Section 53 of the Act, and thereby free7.e
all development, it would amount to exercise of the power of Section 50(1) for
c
a collateral purpose, i.e., freezing of development rather than implementation
of a development plan. The collateral purpose also will be to indirectly get
over the fact that an owner of land pending finali7.8tion of a development plan
has all attendant rights of ownership subject to the restraints under Section
16 of the Act. If the declaration of intent to formulate a town development D
scheme is to get over Section 16 and freeze development activities under
Section 53, it would amount to exercise of power for a collateral purpose.
[Para 81) (831-8-D]
1.8. A bare perusal ofSections 17 and 49 of the Act would show that it
is development plan which determines the manner of usage of the land and E
the town development scheme enumerates the manner in which such proposed
,
usage can be implemented. It would follow that until the usage is determined
through a development plan, the stage of manner of implementation of such
proposed usage cannot be brought about It would also, therefore, follow that
what is contemplated is the final development plan and not a draft development F
plan, since until the development plan is finalized it would have no statutory
.,.. or legal force and the land use as existing .Prior thereto with the rights of
usage of the land arising therefrom would continue. (Para 82) (831-E-F)
1.9. To accept that it is open to the town development authority to declare
an intention to formulate a town development scheme even without a G
development plan and ipso facto bring into play a freeze on usage of the land
under Section 53 would lead to complete misuse of powers and arbitrary
-):-
exercise thereof depriving the citizen of his right to use the land subject to
' . the permitted land use and laws relating to the manner of usage thereof. This
would be an unlawful deprivation of the citizen's right to property which right
H
804 SUPREME COURT REPORTS (2007] 6 S.C.R.
,-
includes within it the right to use the property in accordance with the law as .....
A
it stands at such time. [Para 83) (831-F-H]
1.10. The essence of planning in the Act is the existence of a
development plan. It is a development plan, which under Section 17 of the Act
will indicate the areas and zones, the users, the open spaces, the institutions
B and offences, the special purpost'S, etc. Town planning would be based on the
contents of the development plan. It is only when the development plan is in
existence, can a town development scheme be framed. [Para 84] (832-C-D]
-~ -
1.11. The words "at any time" under section 50(1) of the Act do not ...._
confer upon any statutory authority an unfettered discretion to frame the town
c development scheme whenever it is so pleases. The words "at any time" are
not charter for the exercise of an arbitrary decision as and when a scheme
/
has to be framed. The words "at any time" have no exemption from all forms ~
oflimitation for unexplained and undue delay. Such an interpretation would
not only result in the destruction of citizens' rights but would also go contrary
D the entire context in which the power has been given to the authority. The
to
words "at any time" have to be interpreted in the context in which they are
used. Since a town developm~nt scheme in the context of the Act is intended
to implement the development plan, the declaration of intention to prepare a
scheme can only be in the context of a development plan. The starting point of
the declaration of the intention has to be upon the notification of development
E plan and the outer limit for the authority to frame such a scheme upon lapsing
of the plan. Unless such a construction is to be given to the words "at any
time" appearing in section 50(1) of the Act, it would lead to manifest injustice
and absurdity which is not contemplated by the statute. For giving an effective
meaning to the provisions of Section 50 of the Act, the same is required to be
F read in the context of other provisions of the statute. The rule of purposive
construction has to be applied.
(Paras 86, 87, 85 and 88] (832-F, G, H; 833-A-C-D]
~
State ofH.P. & Ors. v. Rajkumar Brijender Singh & Ors., [2004] 10 SCC
585; Bombay Dyeing and Mft. Co. Ltd v. Bombay Environmental Action Group
G & Ors., [2006] 3 SCC 434; National lnsuracne Co. Ltd. v. Laxmi Narain Dhut,
[2007] 4 SCALE 36; Maruti Udyog Ltd. v. Ram Lal & Ors., (2005] 2 SCC
638; Reserve Bank of India v. Peerless General Finance and Investment Co.
Ltd., [1987] 1 SCC 424; High Court of Gujarat v. Gujarat Kishan Mazdoor ~-
Panchayat, [2003] 4 SCC 712; Indian Handicrafts Emporium & Ors. v. Union
~
of India & Ors., [2003] 7 SCC 589 and Deepal Girishbhai Soni & Ors. v.
H
CHAIRMAN, INDORE VIKAS PRADHIKARAN v. PURE INDUSTRIAL COCK k CHEM. LTD. 805
United India Insurance Co. Ltd. Baroda, (2004) 5 SCC 385, referred to. A
Francis Bennion 's Statutory Interpretation; Interpretation and
Application of Statutes' by Reed Dickerson, referred to.
1.12. The appellant-authority was created for a definite purpose. Its
jurisdiction was limited to the area notified. When so creating, although the B
earlier notification was referred to, the same was only for the purpose of
limiting the area of operation of the appellant-authority. The principle of
legislation by incorporation was applied and not the principle of legislation
by reference. A delegatee must exercise its jurisdiction within the four-
corners of its delegation. If it could not exercise its delegated power for the C
purpose of creation of the appellant authority or extention its jurisdiction it
cannot be done by amendment of a notification issued under Section 13(1) of
the Act. Admittedly, the villages in question had been included by the State by
a subsequent notification. Prior thereto, the said villages having not been
included within the area of operation of the appellant authority, any action
taken either by way of its intention to frame a town planning scheme or D
otherwise shall by wholly illegal and without jurisdiction. It would render its
act in relation to the said villages a nullity.
(Paras 102, 105 and 107) [838-B-C; G; 839-C-D)
State of Orissa & Ors. v. Commissioner ofLand Records and Settlement,
Cuttack & Ors., (1998) 7 SCC 162; Rakesh Vij v. Dr. Raminder Pal Singh E
Sethi & Ors., AIR (2005) SC 3593; Howrah Municipal Corpn. v. Ganges Rope
Co. Ltd, (2004) l SCC 663; Union of India v. Indian Charge Chrome, (1999)
7 SCC 314; S.B. International Ltd v. Asstt. Director General ofForeign Trade,
(1996) 2 SCC 439 and Ku/deep Singh v. Govt. NCT of Delhi, (2006) 5 SCC
702, referred to. F
Laxshmi Amma v. Devassy, (1970) KLT 204, referred to.
Director of Public Works v. Ho Po Sang, (1961) AC 901: (1961) 2 All
ER 721, referred to.
G
G. P. Singh 's 'Principles ofStatutory Interpretation, I 0th Edn., referred
to.
CIVIL APPELLATE JURISDICTION: Civil Appeal No. 2530 of2007.
From the Final Judgment and Order dated 06.03 .2007 of the High Court H
of Judicature at Madhya Pradesh, Jabalpur in Writ Appeal No. 462 of 2006.
806 SUPREME COURT REPORTS (2007] 6 S.C.R.
A WITH
Civil Appeal Nos. 2531 and 2007.
K.K. Venugopal and S.K. Gambhir, Sanjay Kapur, Sbuhra Kapur, Rajiv
Kapur and Arti Singh for the Appellant.
B
C.A. Sundaram, Arun Jaitely and Ravindra Srivastava, Nidhesh Gupta,
Rohini Musa, Saboo and Binu Tamta for the Respondents.
The Judgment of the Court was delivered by
C S.B. SINHA, J. I. Leave granted.
2. Interpretation of the provisions of Madhya Pradesh Nagar Tatha
Gram Nivesh Adhiniyam, (No. 23 of 1973) (for short, 'the Act') is in question
in these appeals which arise out of the judgments and orders dated 06.03.2007
passed by a Division Bench of the High Court of Madhya Pradesh in Writ
D Petition No. 9396 of 2006 and Writ Appeal No. 462 of 2006.
3. Before we advert to the said question, we may notice the admitted
fact of the matter.
4. The said Act was enacted to make provisions for planning and
E development and use of land; to make better provision of the preparation of
the development plans and zoning plans with a view to ensuring that town
planning schemes are made in a proper manner and their execution is made
effective; to constitute a Town & Country Planning Authority for proper
implementation of town and country development plan; to provide for the
development and administration of special areas through a Special Area
Development Authority; to make provision for the compulsory acquisition of
land required for the purposes connected with the said matters. The said Act
came into force with effect from 16.04.1973.
Statutory Provisions :
5. The terms "development", "existing land use map'', "planning area",
"Town Development Scheme" and "Town and Country Development
Authority", which are relevant for the purpose of this case, have been defined
in Section 2(f), 2(i), 2(o), 2(u) and 2(v) of the Act respectively in the following
terms:
CHAIRMAN, INDORE VIKAS PRADHIKARAN '·PURE INDUSTRJAL COCK & CHEM. LTD. [S.B. SINHA, I. ) 807
"2(f) "development" with its grammatical variations means the carrying A
out of a building, engineering, mining or other operation in, on
over or under land, or the making of any material change in any
building or land or in the use of either, and includes sub-division
of any land;"
"2(i) "existing land use map" means a map indicating the use to which B
lands in any specified area are put at the time of preparing the
map, and includes the register prepared, with the map giving
details of land-use."
"2(o)"planning area" means any area declared to be a planning area
under this Act: Non-Planning area shall be construed C
accordingly."
"2(u)"Town Development Scheme" means a scheme prepared for the
implementation of the provisions of a development plan by the
Town and Country Development Authority and includes
"Scheme""
D
"2(v)"Town and Country Development Authority" means an authority
established under Section 38."
6. Chapter IV of the Act deals with planning areas and development
plans. Section 13(1) empowers the State Government to constitute planning
areas for the purposes of the said Act and define the limits thereof. Sub- E
section (2) of Section 13 empowers the State Government by notification,
inter alia, to alter the limits of the planning area so as to include therein or
exclude therefrom such areas, as may be specified in the notification; to
amalgamate two or more planning areas so as to constitute one planning area;
to divide any planning area into two more planning areas; and to declare that F
the whole or part of the area constituting the planning area shall cease to be
a planning area or part thereof. Sub-section (3) of Section 13 of the Act
provides for a non-obstante clause, in terms whereof, the local authority
mentioned therein shall in relation to the planning areas from the date of the
notification issued under sub-section ( 1) cease to exercise the powers, perform
the functions and discharge the duties which the State Government or the G
Director is competent to exercise. Section 14 of the Act enables the Director
to prepare an existing land use map and development plan. Section 15 enables
the Director to carry out the survey and prepare an existing land use map and
forthwith publish the same in the manner laid down therein. Once such a plan
is published, no person is authorised to institute or change the use of any H
808 SUPREME COURT REPORTS [2007] 6 S.C.R.
A land or carry out any development of land for any purpose other than that
indicated in the existing land use map without the permission in writing of the
Director.
7. Clause (b) of sub-section (1) of Section 16, however, provides :
B "(b) no local authority or any officer or other authority shall,
notwithstanding anything contained in any other law for the
time being in force, grant permission for the change in use of
land otherwise than as indicated in the existing land use map
without the permission in writing of the Director."
- '\,
c 8. Section 17 provides as to what should be the contents of the
development plan. Section 17A(I) provides for constitution of a committee;
sub-sections (2) and (3) whereof read as under :
"(2) The Committee constituted under sub-section (!), shall :
D (a) consider and suggest modifications and alterations in the
draft development plan prepared by the Director under section
14;
(b) hear the objections after the publication of the draft
development plan under section 18 and suggest modifications or
E alterations if any; to the Director.
(3) The Convenor of the Committee shall record in writing all the
suggestions, modifications and alterations recommended by the
committee under sub-section (2) and thereafter forward his report
to the Director."
F
9. Section 18 of the Act provides for publication of a development
plan; in terms whereof the objections and suggestions in writing are invited
with respect thereto. The notice in terms of the said provision is to specify "'I'
in regard to the draft development plan, inter a/ia, the following particulars:
G "(i) the existing land use maps;
(iv) the provisions for enforcing the draft development plan and
stating the manner in which permission for development may be -:<. -
H
CHAJR.'l'~· NTIORE VIKAS PR.<DHIKAM~ " PLRE INDL'STRJAL COCK & CHHl LID [S B SINHA, J. J 809
obtained." A
I 0. Section 19 provides for sanction of development plans, sub-section
(2) whereof reads as under :
"(2) Where the State Government approves the development plan with
modification the State Government shall. by a notice published in the B
Gazette, invite objections and suggestions in respect of such
modifications within a period of not less than thirty days from the
date of publication of the notice in the Gazette."
11. Preparation of zoning plan is envisaged under Chapter V thereof.
Section 20 reads as under : C
"20. The Local Authority may on its own motion at any time after the
publication of the development plan, or thereafter if so required by the
State Government shall, within six months of such requisition, prepare
a zoning plan."
D
12. In the zoning plan more details of land use as indicated in the
development plau are to be indicated and, inter alia, shall :
"(c) allocate in detail areas or zones for residential, commercial,
industrial, agricultural, and other purposes;
13. Chapter VI of the Act deals with control of development and use E
of land, provided that the overall control of development and use of land in
the State shall vest in the State Government; sub-section (2) of Section 24
reads as under :
"(2) Subject to the provision of sub-section (I) and the rules made F
under this Act, the overall control of development and use of land in
the planning area shall vest in the Director with effect from such date
as the State Government may by notification, appoint in th is behalf."
14. Section 25 envisages that the use and development of land shall
conform to the provisions of the development plan. Section 38 occurring in G
Chapter VII provides for establishment of a Town and Country Development
Authorityy, sub-sections (I) and (2) whereof read as under :
"38(1).-The State Government may, by notification, establish a Town
and Country Development Authority by such name and for such area
as may be specified in the notification. H
810 SUPREME COURT REPORTS (2007) 6 S.C.R.
A (2) The duty of implementing the proposal in the development
plan, preparing one or more town development schemes and acquisition
and development of land for the purpose of expansion or improvement
of the area specified in the notification under sub-section (I) shall.
subject to the provisions of this Act vest in the Town & Country
Development Authority established for the said area."
B
15. Section 49 of the Act envisages that a town development scheme
may make provision for the matters specified therein including acquisition of
land for the purposes mentioned therein as also any other work of such a
nature as would bring about environmental improvements which may be taken
C up by the authority with the prior approval of the State Government.
16. Sub-sections(!), (2), (3) and (4) of Section 50 of the Act, which are
material for our purpose, read as under:
•
"50.(1) The Town and Country Development Authority may, at
any time, declare its intention to prepare a town development scheme.
D
(2) Not later than thirty days from the date of such declaration of
intention to make a scheme, the Town and Country Development
Authority shall publish the declaration in the Gazette and in such
other manner as may be prescribed.
E (3) Not later than two years from the date of publication of the
declaration under sub-section (2) the Town and Country Development
Authority shall prepare a town development scheme in draft form and
publish it in such form and manner as may be prescribed together with
a notice inviting objections and suggestions from any person with
respect to the said draft development scheme before such date as may
F
be specified therein, such date being not earlier than thirty days from
the date of publication of such notice.
(4) The Town and Country Development Authority shall consider
all the objections and suggestions as may be received within the
G period specified in the notice under sub-section (3) and shall after
giving a reasonable opportunity to such persons affected thereby as
are desirous of being heard or after considering the report of the
committee constituted under sub-section (5) approve the draft scheme
as published or make such modifications therein as it may deem fit."
H 17. A proviso has been added thereafter to sub-section (4) by Act of
CHAIRMAN. INDORE \1~•S PRADHIKAR-\N ,. PtiRE INDL'STRIAL COCK & CHEM LTD [SB Slr.llA I J 811
>. 2004 in terms whereof a draft scheme must be approved within the period of A
one year from the publication thereof. Section 51 provides for revision of the
draft scheme. Section 53 imposes restrictions on land use and land development
in the following terms :
"53. As from the date of publication of the declaration to prepare
a town development scheme, no person shall. within the area included B
in the scheme. institute or change the use of any land or building or
carry out any development, save in accordance with the development
authorised by the Director in accordance wi~h the provisions of this
_)_ Act prior to the publication of such declaration."
18. Section 55 provides that land needed for the purpose of town c
development scheme shall be deemed to be land needed for public purpose.
Section 72 empowers the State Government to supervise and control the acts
and proceedings of the officers appointed under Section 3 and the authorities
constituted under the said Act. The State can issue directions in terms of
Section 73 of the Act. Section 75 Section provides for delegation of powers. D
Notifications :
19. On or about 13.02.1974, the State Government issued. a notification
'ti under sub-section (I) of Section 13 of the Act constituting Indore Planning
Area, the limits whereof were defined in the schedule appended thereto. E
Indisputably, it constituted only 37 villages. The villages Bicholi and Kanadia,
with which we are concerned herein, were not included therein.
20. The State Government in exercise of power conferred upon it under
Section 38 of the Act issued a notification establishing the Appellant-Authority,
namely, 'Indore Vikas Pradhikaran' from 13.05.1977 in respect of the area F
specified in the notification dated 13.02.1974.
...
">- 21. On or about 30.03.1999, the State Government delegated its power
under Sections 13 and 47A of the Act in favour of the District Planning
Committee and it in exercise of said delegated power by a notification dated
13.11.2000 amended the planning area by adding 115 villages therein which G
included the said villages Bicholi and Kanadia. By a notification dated
28.06.2002, it, however, further amended the extent of planning area by deleting
- >:- 62 villages therefrom. Bicholi and Kanadia villages were, however, retained in
the said amended notification.
22. Upon compliance of the usual statutory formalities, the appellant H
812 SUPREME COURT REPORTS [2007] 6 S.C.R.
A published a draft development plan on 27.06.2003. The said plan was in ..(
respect of Urban Development Scheme No.164. Objections and suggestions
in respect thereof were called for. Allegedly, objections and suggestions
having been filed; they were heard by the Development Planning Committee
during the period between 25.08.2003 and 03.09.2003. By a resolution adopted
in a meeting held on 20.08.2004 a decision in anticipation of approval of the
B Government under Section 50( I) of the Act was proposed, which included the
lands of villages Bicholi and Kanadia, inter a/ia, for construction of a bye-
pass road of 60 metres width. A declaration of intention to prepare a town
development scheme in terms of sub-section (2) of Section 50 was issued on
24.08.2004. Indisputably, in terms of sub-section (3) of Section 50 of the Act, ,._
C the draft town development scheme was to be prepared within a period of two
years therefrom. On or about 02.12.2004, Respondent applied for sanction of
development plans under Section 29(1) of the Act. We may, however, notice
that on 04.01.2005, the said draft development plans were returned by the
State of Madhya Pradesh in terms of Section 19( 1) of the Act with a direction
that the plans be prepared for the projected population as in the year 2021
D and the same be placed before the Government for approval as soon as
possible.
23. The State of Madhya Pradesh, however, issued a notification in
terms of sub-section (I) of Section 38 of the Act, inter alia, in respect of the
E villages in question, namely, Bicholi and Kanadia only on 28.10.2005. Appellant
issued a notification on 18.05.2006 inviting objections in respect of the said
scheme. A Draft Development Plan-2021 was published on 13.07.2006.
Contentions of the writ petitioner-respondents :
F 24. Respondents' lands situated in villages Bicholi and Kanadia were
within the respective jurisdictions of the Gram Panchayats constituted under
the provisions of the Madhya Pradesh Gram Panchayat Act. The said
panchayats in terms of the provisions of the Act were 'local authorities'.
They submitted applications for grant of building plan in the year 1990 and
the same was sanctioned on or about 05.04.1991.
G
25. Respondent~, as noticed hereinbefore, applied for and obtained
sanction in terms of the building bye-laws framed by the respective gram
panchayats in 1991 for grant of development plans under Section 29(1) on
02.12.2004. The said applications were rejected by the Joint Director, Town
and Country Planning in view of the purported publication of the plan under
H
.•
CHAIR>.l"-t.;, ll'.:r>ORE VIKAS PRADHIKAR•N" PURE INDUSTRl!J_ COCK & CHEM, LID (S 8, SINHA, J } 81 J
~
),
sub-section (2) of Section 50 of the Act Respondents filed a writ petition A
against the said order, inter alia, praying for issuance of a writ or order in
the nature of mandamus directing the said authority to sanction the site plan
which had been submitted. Th~ said writ petitions were dismissed by a
learned Single Judge by an order dated 17.05.2006. Writ appeals were preferred
thereagainst. which have been allowed by the Division Bench of the High
Court by its judgment dated 06.03 .2007. B
High Court Judgment :
~ 26. By reason of the impugned judgment, the High Court struck down
the declaration made under Section (2) of Section 50 of the Act, opining :
c
(i) Unless a development plan for an area is published and comes into
operation, a draft development scheme cannot be published by the
Town and Country Development Authority under sub-section (2) of
Section 50 of the Act.
(ii) Such a town development scheme cannot by itself without a D
development plan for the area restrict the right of a person to use his
-'
property in the manner he likes.
:f (iii) Although the notification issued by the Appellant-Authority had
been constituted by the State Government only in respect of the area
which was covered by the notification dated 13.02.1974, the draft E
development scheme prepared by it was ultra vires, so far as the said
two villages are concerned, being beyond its territorial jurisdiction.
Submissions :
27. Mr. K.K. Venugopal, and Mr. S.K. Gambhir, learned Senior Counsel F
- ,,., appearing on behalf of the appellant, submitted :
(i) The High Court committed a serious error in interpreting the
provisions of Section 50 of the Act, inasmuch: (i) Under the Act
an existing land use map has to be published which would
indicate broadly the land use proposed in the planning area and G
the areas or zones of land allocated for the purposes mentioned
thereini an'd (ii) As the scheme covers the villages in question,
~>
the same could not have beeri ignored.
(u) Having regard to the fact that the scheme provides for
construction of a bypass road of 70 feet width, any construction H
A
814 SUPREME COURT REPORTS [2007] 6 S.C.R.
by the builders would lead to haphazard development and, thus.
would completely destroy the purpose for which the land was
to be reserved for planned development of the residential area.
......
-
(iii) Undertaking of haphazard and unplanned development would
carry with it a statutory injunction provided for under Section
B 53 of the Act, in terms whereof, if an existing land use map or
a draft development plan or a town development scheme is
published, no person is permitted to obtain any permission for
carrying out any development contrary thereto or inconsistent
therewith.
....
c (iv) The materials on records established that a large number of
permissions were obtained by the private developers which if
allowed to be implemented shall result in haphazard development
of colonies and buildings and, thus, defeat the purpose of the
Act.
(v) As Section 50 is not subject to the publication of a final
D
development plan, as would be evident from the words used
therein, namely, 'at any time', Section 53 would operate as soon
as an intention is expressed by issuance of a notification in
""
terms thereof.
(vi) Section 50 of the Act must be read in the contrast with Section
E
20 thereof. So read, a town development scheme must be
consistent with the provisions of the existing land use map as
well as a draft development plan; as otherwise the purport and
object for which Section 53 has been enacted would become
otiose.
F (vii) The Authority constituted under Section 38 being statutorily
obligated to implement the development plan, as would appear
from Sections 38(2) and 49 of the Act, the power/duty to prevent
haphazard by declaring the town development scheme must be
......
-
held to be vested in the Appellant-Authority.
G (viii) The State of Madhya Pradesh having framed rules known as
'Madhya Pradesh Bhumi Vikas Niyam, 1984', (Rules) which are
parts of the town development scheme, keeping in view the fact
that the scheme provided for I0,000 houses for the low income -4 -
group wherefor three major roads were required to be built up
H having a width of75 metres, 60 metres and 36 metres respectively
CHAIRMAN. INDORE VIKAS PRADHIKARAN '· PURE INDUSTRIAL COCK & CHEM LTD. (SB SINHA I ) 8 J5
). as also parks. roads, colleges, gardens, playgrounds and green A
belts, the purposes for which such scheme had been framed
would not be subserved, if pennissions are granted for haphazard
"
<
and unplanned development.
(Ix) In any event, private interest must be waived to public interest.
(x) The High Court committed a manifest error insofar it failed to B
take into consideration that the planning area having been
extended by a notification issued by the District Planning
Committee, the same would subserve the purpose of the
~
notification dated 28.10.2005 issued under sub-section (1) of
Section 3 8 of the Act. c
28. Mr. Banthia, the learned counsel appearing on behalf of the State
had not made any separate submission before us.
29. Mr. C.A. Sundaram and Mr. Arun Jaitley, learned Senior Counsel
appearing on behalf of the respondents in these appeals, on the other hand, D
would submit :
.. (i) The land of the respondents being outside the planning area, as
notified by the State of Madhya Pradesh constituting the
~ Appellant-Authority, the purported town development scheme
would not be applicable in relation thereto. Only because the E
planning area has been extended by the District Planning
Committee, the same would not ipso fact enlarge the territorial
jurisdiction of the Appellant-Authority.
(ii) Safeguard of public interest has sufficiently been taken care of
in tenns of the Act., as upon issuance of a notification under F
Section 13 of the Act, the Director only is authorised to sanction
a plan for development and carry out other functions as laid
...,.. down under Sections 15, 16 and I 7 of the Act.
(fu) The committee constituted under Section 17-A of the Act is the
only authority which can consider and suggest modifications in G
the draft development plan prepared by the Director under Section
14, whereafter only a draft development plan can be published
in tenns of Section 18; sub-section (2) whereof in tum envisages
-~ consideration of objections, suggestions, etc.
(iv) Only upon completion of the procedures laid down in the said H
816 SUPREME COURT REPORTS [2007] 6 S.C.R.
A provisions development plan can be sanctioned by the State .....
under Section 19 and, thus, in the event the State Government
has power to make modification in the development plan, the
same would come into operation only from the date of publication "-
of the notification in the gazette issued under sub-section (4)
thereof.
B
(v} Procedure laid down in the provisions of the Act having not
been fulfilled, the impugned action had resulted in breach oflaw
and, thus, the same had rightly been struck down.
(vi) Chapter V of the Act provides for preparation of zoning plans
....
c and the contents thereof having been prescribed, the safeguards
envisaged under Sections 18 and 19 of the Act would take care
of public interest involved, inasmuch the overall control and
development as also land use is vested in the Director and in
that view of the matter unless a final development plan comes
into being, the Appellant-Authority cannot be held to have any
D jurisdiction thereover in view of Section 38 of the Act.
(vii) The definition of the 'town development scheme' as contained
in Section 2(u) of the Act presupposes existence of a sanctioned
development plan prepared as per law, and, thus, in absence
thereof a town development scheme under Section 50 cannot be
E made.
(viii) In view of the fact that the State Government has issued a
notification on 28. 10.2005 extending the area ofoperation of the
Appellant-Authority, the scheme illegally notified by it would
not be invalidated.
F
(IX) Gram Panchayat of the village being the competent authority at
the relevant time having sanctioned the building plan, a vested
right had accrued in favour of the first respondent and such a
power having been acknowledged and accepted under the
provisions of the Act, the same cannot be taken away.
G
Analysis of the statutory provisions :
30. The Act is divided into several chapters. It proceeds on the basis
that steps are. required to be taken before a town planning scheme is given
effect to. The State Government is in overall control of the matter relating to
.... -
H town and country planning.
CHA!RMA.1', !NDORE \lKAS PRADHIKARAN ' PURE INDUSTRIAL COCK & CHEM L1D [SB. SINHA. J J 8J7
3 I. The Director of Town and Country Planning, however. subject to the A
control and supervision of the State, exercises such statutory powers which
are conferred upon him. A State is divided into several regions. A regional
plan is finalised whereupon restrictions on use of land or development thereof
can be imposed. Such regional plan is subject to review.
32. Chapter IV of the Act provides for carving out planning areas and B
preparation of development plans. Development plans are required to be
prepared and finalised only in relation to the planning areas. An area, however,
which is notified can be sub-divided into planning areas and non-planning
areas.
33. Chapter V of the Act deals with the preparation, finalization, review C
and modifications of the zonal plan wherewith we are not concerned much in
these appeals. Chapter VI of the Act provides for control of development and
use of land. In terms of Section 24 of the Act, the Director is to control land
use. Preparation of development plan, prohibition of development without
permission and matters connected therewith and incidental thereto are also D
dealt with in Chapter VI. Chapter VII of the Act, however, provides for shift
of control in respect of land use and development for the hands of the
Director and, consequently of the State to the Town and Country Development
Authority. Section 38 provides for establishment of Town and Country
Development Authority.
E
34. The Act envisages the following steps which are required to be
complied with :
(a) Constitution of a planning area by notification under Section 13.
(b) Compliance of the detailed procedure set out under Sections 14
to 19, leading to sanction of the development plan under Section
F
19. The said procedure envisages compliance of principles of
..,_ natural justice .
(c) Section 38 provides for establishment of a Town and Country
Development Authority, by notification "for such areas as may
be specified in the notification". Under sub-section (2) thereof,
G
duties of implementation of the development plan and preparation
of the town development scheme have been cast on the Town
~ and Country Development Authority.
(d) The town development scheme is to be prepared upon following
H
818 SUPREME COURT REPORTS (2007] 6 S.C.R.
A the procedure set out under Section 50. The said scheme can be
prepared only when there exists a development plan, prepared
in accordance with the procedure prescribed under the Act as
envisaged under Sections 14 to 19 and after notification under
Section 38( I). In this regard. reference may be also be made to
Section 2(u) of the Act. which describes a town development
B schem.e to mean a scheme prepared for implementation of the
'provisions of the development plan.
35. Before the procedure referred to hereinbefore is applied to the case
at hand, it would appear that the notification dated 13.02.1974 issued under
...
Section 13 of the Act extending the planning area would not include the land
c of the respondents being outside its territorial jurisdiction. By reason of 1977
Notification the villages in question in which the lands of the respondents
are situated, Indore Development Plan, 19991 would not have any application
thereover. The notification issued under Section 38(1) of the Act on 09.05.1977,
would, thus, be limited to the area specified under the notification dated
D 13.02.1974.
36. A Town and Country Development Authority although may have
~
something to do with the preparation of the draft development plan. It exercises
complete control, subject of course to the power of the State Government, to
give directions, exercises revisional power, etc. over implementation of the
E development plan by making town development schemes.
37. Chapter VIII of the Act deals with special areas. Chapter IX, however,
envisages power of the State Government of supervision and control as also
to issue necessary directions. The State has also the power to review plans
for ensuring conformity. It may also delegate its power from time to time.
F Dissolution of authority at the hands of the State is envisaged under Section
76 of the Act.
38. When a planning area is defined, the same envisages preparation of
development plan and the manner in which the existing land use is to be
implemented. A development plan in some statutes is also known as a master
G plan. It Jays down the broad objectives and parameters wherewith the
development plan is to deal with. It also lays down the geographical splitting
giving rise to preparation and finalization of zonal plans. The zonal plans
contain more detailed and specific matters than the master plan or the -A.
development plan. Town planning scheme or lay-out plan contains further
H details on plot-wise basis. It may provide for the manner in which each plot
CIHIRMAN. INOORE \-lKAS PRADHJ](_'JlAN v. PURE INDUSTRIAL COCK & CHEM LTD (SB SINHA. J ) 8 J9
shall be dealt with as also the matter relating to regulations of development. A
39. Once, however, the existing land use is in place, subject to certain
restrictions contained in the Act, the Director would pennit land use in the
same manner as is found to be existing.
40. The old laws, in relation thereto, as also the pennissions granted by B
the local authorities which includes a gram panchayat are pennitted to operate
till new laws are framed and/ or till new building regulations are made.
41. When existing land use is in place, use thereof for purposes other
than the existing land use is frozen. However, subject to permission granted
by the Director, the development of land is not frozen. C
42. When a draft development plan is prepared, the same is subject to
grant of approval and/ or modification thereof. We will deal with the matter
at some details a little later but at this stage, we may notice that end use of
the land is not frozen until a final sanction plan comes into being. A town
planning scheme, as would appear from its definition contained in Section 2(4) D
of the Act, is prepared only for the purpose of implementation of a development
plan. Yet again, we would deal with the question as to whether the same
would bring within its sweep the draft development plan or only final
development plan a little later, but it may be noticed that once a valid town
planning scheme comes into force, indisputably, there may be freezing of land E
use as also freezing of development and, thus, a total embargo is placed
except in such cases where the Director had granted permission. Section 53
of the Act, however, in the event a valid town planning scheme is made,
places a total embargo both on land use as also the development. Even the
Director is denuded of its power to issue any further permission. Existing land
use, draft development plan and final development plan envisage two-stage F
exercise. In drafting or finalizing a zonal plan, a similar exercise is undertaken.
In making a town development scheme, however, the process undertaken is
a three-stage one inasmuch as an intention therefor is declared which entails
serious consequences and, as noticed hereinbefore, by reason thereof, a total
embargo is imposed both on land use as also the development. For the said G
purpose, a time limit within which a draft town planning scheme has to be
finalized is provided but the same can be subject to modification by the State
which ordinarily should be with a view to deal with the same in line with the
final development plan.
H
820 SUPREME COURT REPORTS [2007] 6 S.C.R.
A Principal questions :
43. In these appeals, principally, we are beset with two questions:
(i) Whether having regard to notification dated 13 .02.1974 vis-a-vis
the expansion of the Indore Development Plan, the District
B Committee in exercise of its delegated power can automatically
extend the area of operation of the appellant despite the
notification constituting it by the State whereby and whereunder
its area of operation was limited to the one covered by the
notification dated 13.02.1974?
C (ii) Whether the appellant-authority can declare its intention in terms
of Section 50 of the Act before the development attained finality.
Competing Interest :
44. There are two competing interests, viz., one, the interest of the
D State vis-a-vis the general public and, two, to have better living conditions
and the right of property of an individual which although is not a fundamental
right but is a constitutional and human right.
45. Before we embark upon the questions involved in these appeals, we
would like to make some general observations.
E 46. Town and country planning involving lanq development of the cities
which are sought to be achieved through the process of land use, zoning plan
and regulating building activities must receive due attention of all concerned.
We are furthermore not oblivious of the fact that such planning involving
highly complex cities depends upon scientific research, study and experience
F and, thus, deserves due reverence.
47. Where, however, a scheme comes into force, although it may cause
hardship to the individual owners as they may be prevented from making the
most profitable use of their rights over property, having regard to the drastic
consequences envisaged thereunder, the statute should be considered in
G such a manner as a result whereof greater hardship is not caused to the
citizens than actually contemplated thereby. Whereas an attempt should be
made to prevent unplanned and haphazard development but the same would
not mean that the court would close its eyes to the blatant illegalities committed
by the State and/or the statutory authorities in implementation thereof.
H Implementation of such land development as also building laws should be in
CHAIRMAN, !NDORE V!KAS PRADHIKARAN "·PURE INDUSTRIAL COCK&: CHEM. LID. (S.B. SINHA, I.) 82 J
./ >. consonance with public welfare and convenience. In United States of America A
zoning ordinances are enacted pursuant to the police power delegated by the
State. Although in India the source of such power is not police power but
if a zoning classification imposes unreasonable restrictions, it cannot be
sustained. The public authority may have general considerations, safety or
general welfare in mind, but the same would become irrelevant, as thereby
statutory rights of a party cannot be taken away. The courts must make an B
endeavour to strike a balance between public interest on the one hand and
protection of a constitutional right to hold property, on the other.
48. For the aforementioned purpose, an endeavour should be made to
.).
find out as to whether the statute takes care of public interest in the matter
vis-a-vis the private interest, on the one hand, and the effect of lapse and/
c
or positive inaction on the part of the State and other planning authorities,
on the other.
49. The courts cannot also be oblivious of the fact that the owners who
are subject to the embargos placed under the statute are deprived of their D
valuable rightful use of the property for a long time. Although ordinarily when
a public authority is asked to perfonn statutory duties within the time stipulated
it is directory in nature but when it involves valuable rights of the citizens
and provides for the consequences therefor it would be construed to be
mandatory in character.
E
50. In T. Vijayalakshmi v. Town Planning Member, [2006] 8 SCC 502, this
Court held:
"15. The law in this behalf is explicit. Right of a person to construct
residential houses in the residential area is a valuable right. The said
right can only be regulated in terms of a regulatory statute but unless F
there exists a clear provision the same cannot be taken away. It is also
a trite law that the building plans are required to be dealt with in terms
of the existing law. Determination of such a question cannot be
postponed far less taken away. Doctrine of legitimate expectation in
a case of this nature would have a role to play."
G
It was further observed:
"18. It is, thus, now well-settled law that an application for grant of
>- permission for construction of a building is required to be decided in
accordance with law applicable on the day on which such permission
H
822 SUPREME COURT REPORTS (2007] 6 S.C.R.
A is granted. However, a statutory authority must exercise its jurisdiction
within a reasonable time. (See Ku/deep Singh v. Govt. of NCT of
De/hr)"
51. What would be a public purpose in such a matter has been stated
in Prakash Amichand Shah v. State of Gujarat & Ors., [1986] I SCC 581,
B whereupon the State itself relied upon, in the following terms :
"19. In order to appreciate the contentions of the appellant it is
necessary to look at the object of the legislation in question as a
whole. The object of the Act is not just acquiring a bit of land here
or a bit of land there for some public purpose. It consists of several
c activities which have as their ultimate object the orderly development
of an urban area. It envisages the preparation of a development plan,
allocation of land for various private and public uses, preparation of
a Town Planning Scheme and making provisions for future development
of the area in question. The various aspects of a Town Planning
Scheme have already been set out. On the final Town Planning Scheme
D
coming into force under Section 53 of the Act there is an automatic
vesting of all lands required by the local authority, unless otherwise
provided, in the local authority. It is not a case where the provisions
of the Land Acquisition Act, 1894 have to be set in motion either by
the Collector or by the Government."
E
The impugned provision does not subserve such purpose.
52. It is also not a case like State of Gujarat v. Shanti/al Mangaldas
& Ors., [1969] 3 SCR 341, that when a development is made, the owner of the
property not only gets much more than what he would have got, if the same
F remained undeveloped in the process but also get the benefit of living in a
developed town having good town planning.
53. The courts should, therefore, strive to find a balance of the competing
interest.
G Human Right Issue :
54. The right of property is now considered to be not only a
constitutional right but also a human right.
55. The Declaration of Human Rights (1789) enunciates under Article 17
H "since the right to property is inviolable and sacred, no-one may be deprived
- >
CHAIRMAN, lNDORE VlKAS PRADHIKARAN v. PURE INDUSlRIAL COCK & CHEM LTD (S.B. SINHA, l.]
thereof, unless public necessity, legally ascertained, obviously requires it and A
just and prior indemnity has been paid". Further under Article 217 (III!) of
823
10th December, 1948, adopted in the General Assembly Resolution it is stated
that : (i) Everyone has the right to own property alone as well as in association
with others. (ii) No-one shall be arbitrarily deprived of his property.
56. Earlier human rights were existed to the claim of individuals right to B
health, right to livelihood, right to shelter and employment etc. but now
human rights have started gaining a multifacet approach. Now property rights
are also incorporated within the definition of human rights. Even claim of
) adverse possession has to be read in consonance with human rights.
57. As President John Adams (1797-1801) put it,: c
"Property is surely a right of mankind as real as liberty." Adding,
"The moment the idea is admitted into society that property is not as
sacred as the laws of God, and that there is not a force of law and
public justice to protect it, anarchy and tyranny commence".
D
- 58. Property, while ceasing to be a fundamental right would, however,
be given express recognition as a legal right, provisions being made that no
person shall be deprived of his property save in accordance with law.
Interpretation of the Act :
E
59. The Act being regulatory in nature as by reason thereof the right
of an owner of property to use and develop stands restricted, requires strict
construction. An owner of land ordinarily would be entitled to use or develop
the same for any purpose unless there exists certain regulation in a statute
or a statutory rules. Regulations contained in such statute must be interpreted
F
in such a manner so as to least interfere with the right of property of the
owner of such land. Restrictions are made in larger public interest. Such
restrictions, indisputably must be reasonable one. [See Bairam Kumwat v.
Union of India & Ors., [2003] 7 SCC 628; Krishi Utpadan Mandi Samiti &
Ors. v. Pilibhit Pantnagar Bee} Ltd & Anr.. [2004] 1 SCC 391 and Union of
India & Ors. v. West Coast Paper Mills Ltd. & Anr.. [2004] 2 SCC 747. The G
statutory scheme contemplates that a person and owner of land should not
ordinarily be deprived from the user thereof by way of reservation or
,1'- designation.
... 60. Expropriatory legislation, as is well-known, must be given a strict
H
824 SUPREME COURT REPORTS (2007] 6 S.C.R.
._
..I,
A construction.
61. In Hindustan Petroleum Corporation Ltd. v. Daius Shapur Chenai
& Ors., (2005] 7 SCC 627, construing Section 5A of the Land Acquisition Act,
this Court observed :
B "6. It is not in dispute that Section 5-A of the Act confers a
valuable right in favour of a person whose lands are sought to be
acquired. Having regard to the provisions contained in Article 300-A
of the Constitution, the State in exercise of its power of "eminent
domain" may interfere with the right of property of a person by A
acquiring the same but the same must be for a public purpose and
c reasonable compensation therefor must be paid.
7. Indisputably, the definition of public purpose is of wide
amplitude and takes within its sweep the acquisition of land for a
corporation owned or controlled by the State, as envisaged under
sub-clause (iv) of clause (t) of Section 3 of the Act. But the same
D would not mean that the State is the sole judge therefor and no
judicial review shall lie. (See Jilubhai Nanbhai Khachar v. State of
Gujarat.)" -
It was further stated :
E "29. The Act is an expropriatory legislation. This Court in State of
MP. v. Vishnu Prasad Sharma, observed that in such a case the
provisions of the statute should be strictly construed as it deprives
a person of his land without consent. (See also Khub Chand v. State
of Rajasthan and CCE v. Orient Fabrics (P) Ltd.]
F There cannot, therefore, be any doubt that in a case of this nature due
application of mind on the part of the statutory authority was
imperative."
62. In State ofRajasthan & Ors. v. Basant Nahata, JT (2005) 8 SC 171,
it was opined :
G
" .. .In absence of any substantive prov1S1ons contained in a
parliamentary or legislative act he cannot be refrained from dealing
...._
with his property in any manner he likes. Such statutory interdict
would be opposed to one's right of property as envisaged under ,,.
Article 300A of the Constitution of India."
H
CHAIRMAN, INOORE VIKAS PRADHIKARAN '· PURE INDUSTRIAL COCK lit. CHEM. LID (S.8. SINHA. J ) 825
63. In State of Uttar Pradesh v. Manohar, [2005] 2 SCC 126, a A
Constitution Bench of this Court held :
"Ours is a constitutional democracy and the rights available to the
citizens are declared by the Constitution. Although Article 19(1 )(t)
was deleted by the Forty-fourth Amendment to the Constitution,
Article 300-A has been placed in the Constitution, which reads as· B
follows:
"300-A. Persons not to be deprived ofproperty save by authority
of law.-No person shall be deprived of his property save by
authority of law."
This is a case where we find utter lack of legal authority for
c
deprivation of the respondent's property by the appellants who are
State authorities ..."
64. In Jilubhai Nanbhai Khachar & Ors. v. State of Gujarat and Anr.,
[ 199 5] Supp. I sec 596, the law is stated in the following terms : D
"The right of eminent domain is the right of the sovereign State,
through its regular agencies, to reassert, either temporarily or
permanently, its dominion over any portion of the soil of the State
including private property without its owner's consent on account of
public exigency and for the public good. Eminent domain is the highest E
and most exact idea of property remaining in the Government, or in
the aggregate body of the people in their sovereign capacity. It gives
the right to resume possession of the property in the manner directed
by the Constitution and the laws of the State, whenever the public
interest requires it. The term 'expropriation' i_s practically synonymous
with the term "eminent domain" F
It was further observed :
"48. The word 'property' used in Article 300-A must be understood
in the context in which the sovereign power of eminent domain is
exercised by the State and property expropriated. No abstract principles G
could be laid. Each case must be considered in the light of its own
facts and setting. The phrase "deprivation of the property of a person"
must equally be considered in the fact situation of a case. Deprivation
connotes different concepts. Article 300-A gets attracted to an
acquisition or taking possession of private property, by necessary H
A
826 SUPREME COURT REPORTS [2007] 6 S.C.R.
implication for public purpose, in accordance with the law made by
Parliament or a State Legislature, a rule or a statutory order having
force of law. It is inherent in every sovereign State by exercising its
,..._ ..
~
power of eminent domain to expropriate private property without
owner's consent. Prima facie. State would be the judge to decide
whether a purpose is a public purpose. But it is not the sole judge.
B This will be subject to judicial review and it is the duty of the court
to determine whether a particular purpose is a public purpose or not.
Public interest has always been considered to be an essential ingredient
of public purpose. But every public purpose does not fall under
Article 300-A nor every exercise of eminent domain an acquisition or ...
c taking possession under Article 300-A. Generally speaking preservation
of public health or prevention of damage to life and property are
considered to be public purposes. Yet deprivation of property for any
such purpose would not amount to acquisition or possession taken
under Article 300-A. It would be by exercise of the police power of
the State. In other words, Article 300-A only limits the powers of the
D State that no person shall be deprived of his property save by authority
of law. There has to be no deprivation without any sanction of law.
Deprivation by any other mode is not acquisition or taking possession
under Article 300-A. In other words, if there is no law, there is no
deprivation. Acquisition of mines, minerals and quarries is deprivation
E under Article 300-A."
65. Rajendra Babu, J (as the learned Chief Justice then was) in Sri
Krishnapur Mutt, Udupi v. N. Vijayendra Shetty and Anr., (1992) 3 Kar.L.J.
326 observed : '
"The restrictions imposed in the planning law though in public
F
interest should be strictly interpreted because they make an inroad
into the rights of a private persons to carry on his business by
construction of a suitable building for the purpose and incidentally
may affect his fundamental right if too widely interpreted ..."
G 66. The question has also been addressed by a decision of the Division
Bench of this Court in Pt. Chet Ram Vashist (Dead) by LRs. v. Municipal
Corporatiopn ofDelhi, (1995] 1 SCC 47, wherein R.M. Sahai, J., speaking for
the Bench opined :
..<,
"6. Reserving any site for any street, open space, park, school etc.
H in a layout plan is normally a public purpose as it is inherent in such
CHAIRMAN, INDORE VIKAS PRADHIKARAN '· PURE INDUSTRIAL COCK&: CHEM. LTD (S.B. SINHA, J. ] 827
> reservation that it shall be used by the public in general. The effect A
of such reservation is that the owner ceases to be a legal owner of
the land in dispute and he holds the land for the benefit of the society
or the public in general. It may result in creating an obligation in
nature of trust and may preclude the owner from transferring or selling
his interest in it. It may be true as held by the High Court that the
interest which is left in the owner is a residuary interest which may B
be nothing more than a right to hold this land in trust for the specific
purpose specified by the coloniser in the sanctioned layout plan. But
the question is, does it entitle the Corporation to claim that the land
~ so specified should be transferred to the authority free of cost. That
is not made out from any provision in the Act or on any principle of c
law. The Corporation by virtue of the land specified as open space
may get a right as a custodian of public interest to manage it in the
interest of the society in general. But the right to manage as a local
body is not the same thing as to claim transfer of the property to
itself. The effect of transfer of the property is that the transferor
ceases to be owner of it and the ownership stands transferred to the D
person in whose favour it is transferred. The resolution of the
Committee to transfer land in the colony for park and school was an
order for transfer without there being any sanction for the same in
y
law."
[See also Raju S. Jethmalani v. State of Maharashtra, (2005) 4 SCALE 688). E
Application of the Act :
67. While determining the questions involved in these appeals, we are
not unmindful that the purpose and object of the town development scheme
is a laudable one insofar as it purports to allocate areas covered by Scheme F
No. 164 for residential purposes and a bypass road of 70 feet wide is to be
~ built along the eastern periphery of the area covered by the Scheme. The
question, however, would be as to whether the development can be said to
be a haphazard one or would completely destroy the purpose for which the
land was to be reserved for planned development of the residential area. G
68. The process started in the year 1974. Only 37 villages were included
within the planning area. It may be that with the passage of time the
- )..
requirements for a better planned city were felt, but it is difficult to conceive
that the State of Madhya Pradesh while constituting the appellant - authority
in terms of Section 38(1) of the Act by reason of its notification dated H
828 SUPREME COURT REPORTS [2007] 6 S.C.R.
<"
......
A 09.05.1977 was wholly oblivious thereto. When the Act came into force the
existing land use was determined. The area for which, thus, land could be put
to use was fixed. No land could be used for a purpose which is not envisaged
by land use.
69. A Director who is a very high ranking officer and is answerable only
B to the State is appointed under the Act to put an eye over the development
acuvities; be it by the developers or others. Apart from the fact that gram
panchayat which is a local authority within the meaning of the provisions of
the Act had the occasion to consider each application for grant of sanction
of the building plans which presumably would require to be drawn directly .t
in terms of the building bylaws framed under a statute which in turn gave rise
c to a presumption that it had received an approval of the State, in the event
of any further development the permission of the Director is necessary. The
Director, however, being an authority under the Act was statutorily enjoined
to perform his duties within the four-corners of the statute. Whereas the said
statutory authority is required to apply its mind before an application for
D grant of development of land is filed, which itself having regard to its wide
definition is extensive in nature, to the requirements of law, it cannot unduly
withhold such permission if the application otherwise fulfils the statutory
conditions. The Act itself envisages that in the event an application is not
disposed of within the time specified, a development plan would be deemed <
to be sanctioned. (See Section 30(5) of the Act] Land use, therefore, is
E restricted. The manner in which the permission for construction of building
is to be granted is also well-defined.
70. Respondents obtained permission for development from the
competent authority for diversion of land use as far back as on 12.01.1989.
F They had applied for and were granted sanction of building plan by the gram
panchayat in the year 1991. No step was taken by the statutory authorities
or the appellant herein to notify a draft development plan. It was not notified
""'("
till 2000. No further step was taken pursuant thereto or in furtherance thereof.
Respondents filed an application before the Director for grant of permission
only on 2.12.2004 which was rejected by reason of an order dated 14.12.2004
G purported to be for the following reason:
"subjected land of village Bicholi Hapsi has been included in the
proposed Development Scheme No. 164 of Indore Development
Authority."
.A -
H 71. We may notice two precise submissions of Mr. Venugopal at this
CHAl~l~N. INDORE VIKAS PRADHIKARAN •·. PURE INDUSTRJAL COCK & CHEM LTO. (S.B SINHA, J.] 829
> stage: A
(i) The development plan includes draft development plan;
(ii) Existence of any draft development plan would authorise the
appellant - authority to declare its intention to prepare a town
development scheme at any time.
B
12. The draft development plan was published on 27.06.2003 although
it was sent for consideration of the State in terms of Section 19 of the Act
on 9.10.2003. The same was returned to the appellant - authority stating that
>- plan to be prepared for the projected population in the year 2021 on or about
4.01.2005. A draft development plan 2021 was published only on 13.07.2007
whereas the declaration by the appellant - authority was notified on 20.08.2004.
c
Submission of Mr. Venugopal that a development plan would include a draft
development plan is sought to be made as the statute has interchangeably
used draft development plan, sanctioned development plan as development
plan and, secondly, on the strength of clause (iv) of Sub-section (I) of Section
18 of the Act laying down that a notice shall be issued thereunder containing D
.. inter alia the particulars, viz., the provisions for enforcing the draft
development plan and stating the manner in which permission for development
may be obtained.
")-'
73. We do not see any force in the said argument. It is possible to
enforce a draft development plan in a given case, but the statute must E
specifically provide for the same. But, a draft development plan which has not
attained finality cannot be held to be determinative of the rights and obligations
of the parties and, thus, it can never be implemented. Section 50 of the Act
explicitly states that the authority may declare its intention to prepare a town
development scheme which having regard to Section 2(u) of the Act must be F
read to mean declaration of its implementation to prepare a scheme for the
~-
implementation of the provisions of a development plan.
74. We have come across some legislations, as for example, The Himachal
Pradesh Town and Country Planning Act, 1977 where a provision has been
made for preparation of an interim development plan. It is not in dispute that G
legislations relating to town and country planning are somewhat similar. Had
the legislature thought of implementation of a draft development plan, they
- ). could have also provided for an interim development plan which ipso facto
would have been enforceable.
75. A development plan even in ordinary parlance can be implemented H
830 SUPREME COURT REPORTS (2007] 6 S.C.R.
A only when it is final and not when it is at the draft stage, i.e., susceptible to
changes. Not only land use may make geographical change, the other details
may also undergo a change. The objections and suggestions invited from the
general public as also the persons affected may be accepted. There may be
realignment. It may undergo serious modifications. Once the legislature has
defined a tenn in the interpretation clause, it is not necessary for it to use the
B same expression in other provisions of the Act. It is well-settled that meaning
assigned to a tenn as defined in the interpretation clause ur-less the context
otherwise requires should be given the same meaning.
76. It is also well-settled that in the absence of any context indicating
C a contrary intention, the same meaning would be attached to the word used
in the later as is given to them in the earlier statute. It is trite that the words
or expression used in a statute before and after amendment should be given
the same meaning. It is a settled law that when the legislature uses the same
words in a similar connection, it is to be presumed that in the absence of any
context indicating a contrary intention, the same meaning should attach to the
D words. [See Lenhon v. Gobson & Howes Ltd., (19I9) AC 709 at 711, Craies
on Statute Law, Seventh Edition, page 141 and G.P. Singh's Principles of
Statutory Interpretation, Tenth edition, page 278]
77. In Venkata Subamma and Anr. v. Ramayya and Ors., [AIR 1932 PC
92], it is stated that an Act should be interpreted having regard to its history,
E and the meaning given to a word cannot be read in a different way than what
was interpreted in the earlier repealed section.
78. Land use, development plan and zonal plan provided for the plan
at macro level whereas the town planning scheme is at a micro level and, thus,
F would be subject to development plan. It is, therefore, difficult to comprehend
that broad based macro level planning may not at all be in place when a town
planning scheme is prepared.
79. Once a final plan comes into force, steps inter alia are taken for
acquisition of the property. Section 34 of the Act takes care of such a
G contingency. The town development scheme, as envisaged under Section 49
of the Act, specifically does it. Out of nine clauses contained in Section 49,
six relate to acquisition of land for different purposes. Clauses (v), (viii) and
.'
(ix) only refer to undertaking of such buildings or construction of work by
the authority itself, reconstructions for the purpose of buildings, roads, drains,
sewage lines and the similar amenities and any other work of a nature such
..( -
H as would bring about environmental improvements.
CHAIRMAN, INOORE \1KAS PRADHIKARAN "· PURE INDUSTRIAL COCK & CHEM LTD. (S.B SINHA J ] 831
> 80. If the submission of Mr. Venugopal is accepted, a purpose which is A
otherwise not contemplated under Chapter IV would be brought in by side
door in Chapter VIL It is well-settled that would cannot be done directly
cannot be permitted to be done indirectly.
81. The purpose of declaring the intent under Section 50( I) of the Act
is to implement a development plan. Section 53 of the Act freezing any other B
development is an incidence arising consequent to the purpose, which purpose
is to implement a development plan. If the purpose of declaring such an
, intention is merely to bring into play Section 53, and thereby freeze all
development, it would amount to exercise of the power of Section 50( 1) for
a collateral purpose, Le,, freezing of development rather than implementation c
of a development plan. The collateral purpose also will be to indirectly get
over the fact that an owner of land pending finalization of a development plan
has all attendant rights of ownership subject to the restraints under Section
16. If the declaration of intent to formulate a town development scheme is to
get over Section 16 and freeze development activities under Section 53, it
D
would amount to exercise of power for a collateral purpose.
82. A bare perusal of Sections 17 and 49 would show that it is the
development plan which determines the manner of usage of the land and the
town development scheme enumerates the manner in which such proposed
usage can be implemented. It would follow that until the usage is determined E
through a development plan, the stage of manner of implementation of such
proposed usage cannot be brought about It would also therefore follow that
what is contemplated is the final development plan and not a draft development
plan, since until the development plan is finalized it would have no statutory
or legal force and the land use as existing prior thereto with the rights of F
usage of the land arising therefrom would continue.
83. To accept that it is open to the town development authority to
declare an intention to formulate a town development scheme even without
a development plan and ipso facto bring into play a freeze on usage of the
land under Section 53 would lead to complete misuse of powers and arbitrary G
exercise thereof depriving the citizen of his right to use the land subject to
the permitted land use and laws relating to the manner of usage thereof. This
- ). would be an unlawful deprivation of the citizen's right to property which right
includes within it the right to use the property in accordance with the law as
it stands at such time. To illustrate the absurdity to which such an interpretation H
832 SUPREME COURT REPORTS (2007] 6 S.C.R.
A could lead it would then become open to the town development authority to .... ~
notify an intent to formulate a town development scheme even in the absence
of a development plan, freeze all usage of the property by a owner thereof
by virtue of Section 53 of the Act, and should no development plan be
finalized within 3 years, such scheme would lapse and the authority thereupon
would merely notify a fresh intent to formulate a town development scheme
B
and once again freeze the usage of the land for another three years and
continue the same ad infinitum thereby in effect completely depriving the
citizen of the right to use his property which was in a manner otherwise
permitted under law as it stands.
-4
c 84. The essence of planning in the Act is the existence of a development ,i._
plan. It is a development plan, which under Section 17 will indicate the areas
and zones, the users, the open spaces, the institutions and offices, the special
purposes, etc. Town planning would be based on the contents of the
development plan. It is only when the development plan is in existence, can
a town planning scheme be framed. In fact, unless it is known as to what the
D
contents of a possible town planning scheme would be, or alternatively,
whether in terms of the development plan such a scheme at all is required,
the intention to frame the scheme cannot be notified.
85. Section 50 of the Act no doubt uses the word "at any time". The
E question, however, is what that would imply. The town planning scheme, it
would bear repetition to state, is made for the purpose of implementation of
a development plan. Ordinarily, therefore, it would envisage the time period
for coming into force of the development plan and the expiry thereof. Unless
such a construction is to be given to the words "at any time", it would lead
F to manifest injustice and absurdity which is not contemplated by the statute.
For giving an effective meaning to the provisions of Section 50 of the Act,
the same is required to be read in the context of other provisions of the
statute and in particular the interpretation clauses which we have noticed
hereinbefore.
G 86. Section 50( I) of the Act provide for declaration of this intention to
prepare town development scheme "at any time". The words "at any time" do
not confer upon any statutory authori~· an unfettered discretion to frame the
town development scheme whenever it is so pleases. The words "at any time"
are not charter for the exercise of an arbitrary decision as and when a scheme
,/ -
H has to be framed. The words "at any time" have no exemption from all forms
CHAIRMAN, INDORE \1KAS PRADHIKARAN '·PURE INDUSTRJAl COCK& CHEM LTD. [SB. SINHA,J ) 833
> of limitation for unexplained and undue delay. Such an interpretation would A
not only result in the destruction of citizens' rights but would also go
contrary to the entire context in which the power has been given to the
authority.
87. The words "at any time'" have to be iPterpreted in the context in
which they are used. Since a town development scheme in the context of the
B
Act is intended to implement the development plan, the declaration of intention
to prepare a scheme can only be in the context of a development p!an. The
starting point of the declaratiQn of the intention has to be upon the notification
)_
of development plan and the outer limit for the authority to frame such a
scheme upon lapsing of the plan. That is the plausible interpretation of the c
words "at any time" used in Section 50(1) of the Act.
[See State of HP. & Ors. v. Rajkumar Brijender Singh & Ors., [2004] l 0 SCC
585]
D
88. For construing a statute of this nature, we are dealing with, rule of
purposive construction has to be applied.
89. In Francis Bennion's Statutory Interpretation, purposive construction
has been described as under :
E
"A purposive construction of an enactment is one which gives effect
to the legislative purpose by-
(a) following the literal meaning of the enactment where that meaning
is in accordance with the legislative purpose (in this Code called a
purposive-and-literal construction), or F
(b) applying a strained meaning where the literal meaning is not in
accordance with the legislative purpose (in the Code called a purposive-
and-strained construction)."
[See also Bombay Dyeing and A.ffg Co. Ltd. v. Bombay Environmental G
Action Group and Ors., [2006[ 3 SCC 434 and National Insurance Co. Ltd.
v. Laxmi Narain Dhut, (2007) 4 SCALE 36]
').. 90. In Maruti Udyog Ltd. v. Ram Lal and Ors,, [2005] 2 SCC 638, while
interpreting the provisions of Industrial Disputes Act, 194 7, the rule of H
purposive construction was followed.
834 SUPREME COURT REPORTS [2007) 6 S.C.R.
A 91. In Reserve Bank of India v. Peerless General Finance and Investment ..i..,
Co. Ltd., [ 1987] I SCC 424 this Court stated:
" .. .If a statute is looked at, in the context of its enactment. with the
glasses of the statute-maker, provided by such context, its scheme,
the sections, clauses, phrases and words may take colour and appear
B different than when the statute is looked at without the glasses
provided by the context. With these glasses we must look at the Act
as a whole and discover what each section, each clause, each phrase
and each word is meant and designed to say as to fit into the scheme
of the entire Act..."
c
92. In 'The Interpretation and Application of Statutes' by Reed
Dickerson, the author at p.135 has discussed the subject while dealing with
the importance of context of the statute in the following terms:
"... The essence of the language is to reflect, express, and perhaps
D even affect the conceptual matrix of established ideas and values that
identifies the culture to which it belongs. For this reason, language
has been called "conceptual map of human experience".'
[See also High Court of Gujarat v. Gujarat Kishan Mazdoor Panchayat,
E [2003] 4 SCC 712, Indian Handicrafts Emporium and Ors. v. Union of India
and Ors., [2003] 7 SCC 589 and Deepal Girishbhai Soni and Ors. v. United
India Insurance Co. Ltd., Baroda, [2004] 5 SCC 385, para 56]
Delegation :
F 93. An area conceived of under the Act, as noticed hereinbefore,
consists of both plan area and non-plan area. Development of plan area may
be in phases. A master plan may be followed by a zonal plan and a zonal plan
may be followed by a town development scheme.
G 94. The limit of Indore planning area was specified by a notification
dated 13.02.1974 in terms of Sub-section (l) of Section 13 of the Act. Appellant
- Authority was constituted by the State of Madhya Pradesh in exercise of
its power under Section 38(1) of the Act for the area comprised within the
Indore planning as specified in the notification dated 13.02.1974. The State in
H exercise of its jurisdiction under Sub-section (I) of Section 75 of the Act
delegated its power conferred upon it under Sections 13 and 47A of the Act
CHAIRMAN, ll'o'OORE VIKAS PRADHIKAR~N "· PURE INDUSTRIAL COCK & CHEM.LID. (S.B. SINHA, I. ] 835
upon the District Planning Committee. No power under Section 38 was A
delegated. The District' Planning Committee exercises its jurisdiction pursuant
to the said delegation in terms of a notification dated 13.11.2000 extending the
Indore Development Planning Area to 152 villages. The villages Bicholi and
Kanadia were not included in the notification dated 12.08.1977. They were
included only in the notification issued by the District Planning Committee. B
95. The District Planning Committee, however, issued another notification
amending the planning area to 90 villages only and deleting 62 villages from
its earlier notification.
96. There cannot be any doubt whatsoever that even a delegatee C
exercises its power relying on or on the basis of its power conferred upon
it by the delegator, its act would be deemed to be that of the principal as has
been held by this Court in State of Orissa and Ors. v. Commissioner of Land
Records and Settlement,Cuttack and Ors., [1998] 7 SCC 162, this Court held:
"25. We have to note that the Commissioner when he exercises power D
of the Board delegated to him under Section 33 of the Settlement Act,
1958, the order passed by him is to be treated as an order of the Board
of Revenue and not as that of the Commissioner in his capacity as
Commissioner. This position is clear from two rulings of this Court to
which we shall presently refer. The first of the said rulings is the one E
decided by the Constitution Bench of this Court in Roop Chand v.
State of Punjab 3 . In that case, it was held by the majority that where
the State Government had, under Section 41(1) of the East Punjab
Holdings (Consolidation and Prevention offragmentation) Act, 1948,
delegated its appellate powers vested in it under Section 21 (4) to an F
"officer", an order passed by such an officer was an order passed by
the State Government itself and "not an order passed by any officer
under this Act" within Section 42 and was not revisable by the State
Government. It was pointed out that for the purpose of exercise of
powers of revision by the State under Section 42 of that Act, the order
sought to be revised must be an order passed by an officer in his own G
right and not as a delegate of the State. The State Government was,
therefore, not entitled under Section 42 to call for the records of the
case which was disposed of by an officer acting as its delegate."
97. Whether issuance of notification by the delegatee would H
836 SUPREME COURT REPORTS [2007] 6 S.C.R.
A automatically. extend the jurisdiction of the appellant is the question. Before
we consider the legal issues involved, we may notice that the appellant filed
an application before the High Court wherein it was stated:
"2. The respondent no. 2 submits that though in 2004 itself the State
Government had in principle agreed to extend the area of the Indore
B Development Authority u/s 38 of the Adhiniyam, the said decision
could not be implemented because of certain procedural and other
difficulties. Subsequently, when the respondent no. 2 took up the
matter with the State Govemmer.t, it insisted that in the absence of
a formal request from the IDA it could not extend its area u/s 38 of
C the Adhiniyam. Accordingly, the respondent no. 2 had submitted its
formal request by its aforesaid letter dated 14/10/2005."
98. The State, it is interesting to note, took a similar plea when the
appellant-authority sought permission for new Transport Nagar Scheme on
265 hectares of land situated in village Mundrla Nayata by its letter dated
D 23.os.2005 stating:
"Please refer the reference letter by which the Indore Development
Authority sought permission for new Transport Nagar Scheme on 265
hectares of land situated in village Mundrla Nayata.
E (I) In this regard opinion of law department has been received and as
per that in the year 1977 the areas of Indore Development Authority
was p~escribed whereas the questioned scheme is failing beyond the
prescribed operational area.
(2) Although as per letter dated 28th June, 2002, the planning area of
F Indore city is extended but the operational area of Indore Development
Authority has not been extended. At present, Indore Development
Plan, 1991 is in force and new Development Plan is being prepared.
(3) Thus, the Indore Development Authority is not competent to
declare "Town Development Scheme" beyond its prescribed operational
G area.;,
99. Yet again, the State in exercise of its power under Section 38(1) of
the Act notified planning area confirming to the one identified by the District
Planning Committee in terms of its notification dated 28.10.2005.
H
CHAIRMAN. INDORE VIKAS PRADHIKARAN v. PURE INDUSTRIAL COCK k CllEM. l TD [S.B. SINHA. J J 83 7
How State understood it : A
I00. Application of the principle of executive construction would lead
to a conclusion that the State and the appellant themselves proceeded on the
basis that in terms of the notification issued by the District Planning Committee,
the area of operation of the appellant was not extended.
B
I 0 I. In G.P. Singh 's 'Principles of Statutory Interpretation, I 0th Edn.
at p. 3 I9, it is stated :
"But a uniform and consistent departmental practice arising out
of construction placed upon an ambiguous statute by the highest C
executive officers at or near the time of its enactment and continuing
for a long period of time is an admissible aid to the proper construction
of the statute by the Court and would not be disregarded except for
cogent reasons. The controlling effect of this aid which is known as
'executive construction' would depend upon various factors such as
the length of time for which it is followed, the nature of rights and D
property affected by it, the injustice result from its departure and the
approval that it has received in judicial decisions or in legislation.
Relying upon this principle, the Supreme Court in Ajay Gandhi v.
B. Singh having regard to the fact that the President of the Income
E -
Tax Appellate Tribunal had been from its inception in 1941 exercising
the power of transfer of the members of the Tribunal to the places
where Benches of the Tribunal were functioning, held construing
sections 251(1) and 255(5) ofthe Income Tax Act that the President
under these provisions has the requisite power of transfer and posting
of its members. The court observed : "For construction of a statute, F
it is trite, the actual practice may be taken into consideration."
Contemporary official statements throwing light on the construction
of a statute and statutory instruments made under it have been used
as contemporanea expositio to interpret not only ancient but even
recent statute both in England and India." G
[See also S.B. Bhattacharjee v. S.D. Majumdar & Ors., Civil Appeal arising
out of S.L.P. (Civil) No. 3413 of 2006, disposed of today].
Exercise of delegated power - effect of :
H
838 SUPREME COURT REPORTS (2007] 6 S.C.R.
A I02. The State exercises its different power for different purposes. Issuing
notification of a planning area, whether named or not, for the purpose of
Section 13(1) is different from the one for which a development authority is
created within the meaning of Section 38(1) of the Act. The State in a given
situation may appoint more than one authority for the same planned area. The
State delegated its power upon the District Planning Authority under Section
B 38 of the Act. The appellant-authority was created for a definite purpose. Its
jurisdiction was limited to the area notified. When so creating, although 1974
notification was referred to, the same was only for the purpose of limiting the
area of operation of the appellant-authority. The principle of legislation by
incorporation was applied and not the principle of legislation by reference.
c 103. The difference between the two principles is well-known. Whereas
in the case of the former, a further notification amending the ambit or scope
of the statute would be necessary, if the statute incorporated by reference is
amended, in the latter it would not be necessary.
D 104. In Rakesh Vij v. Dr. Raminder Pal Singh Sethi and Ors., AIR (2005)
SC 3593, this Court observed:
"9. Adopting or applying an earlier or existing Act by competent
Legislature to a later Act is an accepted device of Legislation. If the
adopting Act refers to certain provisions of an earlier existing Act, it
E is known as legislation by reference. Whereas if the provisions of
another Act are bodily lifted and incorporated in the Act, then it is
laiown as legislation by irn:orporation. The determination whether a
legislation was by way of incorporation or reference is more a matter
of construction by the courts keeping in view the language employed
by the Act, the purpose of referring or incorporating provisions of an
F existing Act and the effect of it on the day-to-day working. Reason
for it is the courts' prime duty to assume that any law made by the
Legislature is enacted to serve public purpose .."
I05. It is furthermore a well-settled principle of law that a delegatee must
G exercise its jurisdiction within the four-corners of its delegation. If it could not
exercise its delegated power for the purpose of creation of the appellant
authority or extended its jurisdiction, in our opinion, it cannot be done by
amendment of a notification issued under Section 13(1) of the Act.
106. We may at this juncture notice the effect of the notifications issued
H by the authority :
CHAIRMAN, INDORE \1KAS PRADHIKARAN v. PURE INDUSTRIAL COCK It CHEM LTD. (S B. SINHA, 1 J 839
> • It is a matter of record that the notification issued on 13.02.1974 A
under Section 13 notifying the planning area, did not include
land of Respondent No. I.
• It is also a matter of record that the Indore Development Plan,
1991 notified in 1975 does not admittedly include the village in
which the land of Respondent No. I is situate. B
• The notification issued under Section 38( I) of the Act on
09.05.1977 is also limited to the area specified in the notification
dated 13.02.1974 and admittedly does not include the land of
). Respondent No. I.
107. Admittedly, the villages in question had been included by the State c
in its notification issued on 28. l 0.2005. Prior thereto, the said villages having
; not been included within the area of operation of the appellant authority, any
action taken either by way of its intention to frame a town planning scheme
or otherwise shall be wholly illegal and without jurisdiction. It would render
its act in relation to the said villages a nullity. D
I08. It is, therefore, difficult for us to accept the submission of Mr.
Venugopal and Mr. Gambhir that the notification dated 13. 11.2000 subsumes
in the notification dated 12.08.1977.
109. For the reasons aforementioned, we do not have any other option E
but to uphold the impugned judgment of the High Court.
110. We may, however, observe that several other contentions, as noticed
hereinbefore, have been raised before us but we do not find any necessity
to go thereinto.
F
Should we issue Mandamus ?
111. Before parting, however, we must notice a submission of Mr. C.A.
Sundaram, learned counsel appearing on behalf of the respondents, to the
effect that the High Court committed a manifest error insofar as it limited its
direction only to the following: G
" ... The impugned order dated 17.5.2006 of the learned Single Judge in
W.P. No. 4 of2005 is set aside and the notification dated 24.8.2004 of
- )..
the Indore Development Authority insofar as it applies to village
Bicholi Hapsi and the communication of the Joint Director, Town and
Country Planning, Indore to the appellant that he cannot approve the H
840 SUPREME COURT REPORTS [2007) 6 S.C.R.
'
A plan for constructidn of the house of the appellant because of the
publication of the Draft Scheme No. 164 U/s. 50(2) of the Adhiniyam
are quashed and the Director is directed to reconsider the application
of the petitioner for permission to undertake construction of the
house in accordance with the provisions of the Adhiniyam and the
observations in this judgment..."
B
112. The learned counsel would submit that the said direction is not
correct as the High Court should have directed the Director to consider the
respondents' application in accordance with the Jaw as it existed at the
relevant point of time. We do not subscribe to the said view as it is now well-
C known that that where a statute provides for a right, but enforcement thereof
is in several stages, unless and until the conditions precedent laid down
therein are satisfied, no right can be said to have been vested in the person
concerned. ·
113. In Director ofPublic Works v. Ho Po Sang, (1961) AC 901 : [1961]
D 2 All ER 721, the Privy Council considered the said question having regard
to the repealing provisions of the Landlord and. Tenant Ordinance, 194 7 as
amended on 9-4-1957. It was held that having regard to the repeal of Sections
3-A to 3-E, when applications remained pending, no accrued or vested right
was derived stating:
E "In summary, the application of the second appellant for a rebuilding,,
certificate conferred no right on him which was preserved after the
repeal of Sections 3-A to 3-E, but merely conferred hope or expectation
that the Governor-in-Council would exercise his executive or ministerial
discretion in his favour and the first appellant would thereafter issue
a certificate. Similarly, the issue by the first appellant of notice of
F intention to grant a rebuilding certificate conferred no right on the
second appellant which was preserved after the repeal, but merely
instituted a procedure whereby the matter could be referred to the
Governor-in-Council. The repeal disentitled the first appellant from
thereafter issuing any rebuilding certificate where the matter had been
G referred by petition to the Governor-in-Council· but had not been
determined by the Governor."
[See also Lakshmi Amma v. Devassy, (1970) KL T 204]
114. The question again came up for consideration in Howrah Municipal
H Corpn. v. Ganges Rope Co. Ltd., [2004] 1 SCC 663, wherein this Court
- >
CHAIRMAN, INDORE VIKAS PRADHIKARAN '·PURE INDUSTRIAL COCK & CHEM.LTD. [S.B. SINHA. J. J
categorically held :
"The context in which the respondent Company claims a vested
841
A
---,. .. right for sanction and which has been accepted by the Division Bench
of the High Court, is not a right in relation to ownership or possession
of any property for which the expression vest is generally used. What
we can understand from the claim of a vested right set up by the B
respondent Company is that on the basis of the Building Rules, as
applicable to their case on the date of making an application for
sanction and the fixed period allotted by the Court for its consideration,
-1-
it had a legitimate or settled expectation to obtain the sanction. In our
considered opinion, such settled expectation, if any, did not create
any vested right to obtain sanction. True it is, that the respondent
c
Company which can have no control over the manner of processing
---i of application for sanction by the Corporation cannot be blamed for
delay but during pendency of its application for sanction, if the State
Government, in exercise of its rule-making power, amended the Building
Rules and imposed restrictions on the heights of buildings on G. T. D
Road and other wards, such settled expectation has been rendered
• impossible of fulfilment due to change in law. The claim based on the
alleged vested right or settled expectation cannot be set up against
')- statutory provisions which were brought into force by the State
Government by amending the Building Rules and not by the
Corporation against whom such vested right or settled expectation is E
being sought to be enforced. The vested right or settled expectation
has been nullified not only by the Corporation but also by the State
by amending the Building Rules. Besides this, such a settled expectation
or the so-called vested right cannot be countenanced against public
interest and convenience which are sought to be served by amendment F
of the Building Rules and the resolution of the Corporation issued
thereupon."
115. In Union ofIndia v. Indian Charge Chrome, [1999] 7 SCC 314, yet
again this Court emphasized :
G
"The application has to be decided in accordance with the law
applicable on the date on which the authority granting the registration
is called upon to apply its mind to the prayer for registration."
- )..
I 16. In S.B. International Ltd. v. Asstt. Director General of Foreign
Trade, [1996] 2 SCC 439, this Court repelled a contention that the authorities H
842 SUPREME COURT REPORTS [2007) 6 S.C.R.
A cannot take advantage of their own wrong viz. delay in issuing the advance
licence, stating :
,...._ -
"We have mentioned hereinbefore that issuance of these licences
is not a formality nor a mere ministerial function but that it requires
due verification and formation of satisfaction as to compliance with
B all the relevant provisions."
[See also Ku/deep Singh v. Govt. NCT of Delhi. (2006] 5 SCC 702]
i 17. For the reasons aforementioned, there is no merit in these appeals
~
which are dismissed accordingly. There shall, however, be no order as to
c costs.
B.S. Appeal dismissed. ..