The case involved an international commercial arbitration under a Long‑Term Agreement for the supply of coking coal between Anglo American Metallurgical Coal Pty Ltd (appellant) and MMTC Ltd (respondent). The arbitral tribunal held that MMTC breached the contract by failing to lift 454,034 MT of …
The Supreme Court of India addressed two interconnected issues: whether landlord-tenant disputes governed by the Transfer of Property Act, 1882 are arbitrable, and the scope of judicial review under Sections 8 and 11 of the Arbitration and Conciliation Act, 1996. The case arose from a tenancy …
NV Engineering (formerly Noy Vallesina) and Jindal Drugs entered into an engineering contract that provided for ICC arbitration with the seat in London. A partial award was made in 2000, which Jindal challenged before the Bombay High Court under Section 34 of the Arbitration and Conciliation Act, …
The Government of India appealed a Delhi High Court order that allowed Vedanta Ltd. and its affiliates to enforce a foreign arbitral award under Sections 47 and 49 of the Arbitration and Conciliation Act, 1996. The Court examined the applicable limitation period for filing an enforcement petition, …
Balasore Alloys Ltd filed an arbitration petition under Section 11 of the Arbitration and Conciliation Act, 1996 seeking appointment of a sole arbitrator based on Clause 7 of 37 purchase orders. Medima LLC contended that the parties were bound by an earlier ‘Umbrella’ (Pricing) Agreement dated …
Avitel Post Studioz Ltd and its promoters invested USD 60 million in HSBC based on alleged representations that Avitel would secure a lucrative BBC contract, which later proved to be fictitious. HSBC obtained interim awards and a foreign final award from a Singapore tribunal finding the appellants …
B.B.M. Enterprises obtained an arbitral award on 16 September 2009 for Rs. 1.38 crore plus interest and costs. The award was executed, but the award‑challenging petition under Section 34 of the Arbitration and Conciliation Act, 1996 was filed on 2 April 2010, well beyond the 120‑day limitation …
The appellant, a director of Aatash Norcontrol Limited (ANL), was arrested in connection with alleged financial irregularities in a Build‑Own‑Operate‑Transfer project for a Vessel Traffic and Port Management System (VTPMS) in the Gulf of Khambhat. While the dispute over capital costs was referred to …
Centrotrade Minerals & Metals Inc., a US corporation, contracted with Hindustan Copper Ltd. (HCL) for the sale of copper concentrate and included a two‑tier arbitration clause: first arbitration in India, with a right to appeal to an ICC arbitration in London. After an Indian arbitrator gave a nil …
Patel Engineering Ltd. challenged three arbitral awards dated 29‑03‑2016 concerning payment for extra lead under a contract with North Eastern Electric Power Corporation Ltd. (NEEPCO). NEEPCO filed applications under Section 34 of the Arbitration and Conciliation Act, 1996; the Additional Deputy …
South East Asia Marine Engineering & Constructions Ltd (SEAMEC) was awarded a fixed‑price work order for well drilling by Oil India Ltd. During performance, the price of high‑speed diesel (HSD) rose following a government circular. SEAMEC claimed that the increase fell within Clause 23 – a ‘change …
Quippo Construction Equipment Ltd entered into four rental agreements with Janardan Nirman Pvt Ltd, each containing an arbitration clause under the Construction Industry Arbitration Association (CIAA). One agreement stipulated Kolkata as the place of arbitration, but the sole arbitrator conducted …
The petitioner, Mankastu Impex Private Limited, an Indian distributor of air‑quality monitors, entered into a Memorandum of Understanding with AirVisual Limited, a Hong Kong company, appointing it as exclusive distributor in India. After AirVisual was acquired by IQAir AG, which refused to honour …
The Supreme Court examined whether a District Forum under the Consumer Protection Act, 1986 could extend the time for filing a response to a complaint beyond the 30 days plus a statutorily permitted 15‑day extension under s.13(2)(a), and where the 30‑day period begins. The Court held that s.13(2)(a) …
The appellants, a charitable trust, entered into a 38‑year lease deed with the respondents for development of trust land. The lease deeds of 1996 and 1997 were neither registered nor sufficiently stamped under the Karnataka Stamp Act, 1957, and the respondents failed to pay the deficit stamp duty …
The Supreme Court dismissed the appeals of Vijay Karia and others against the Bombay High Court’s order enforcing four LCIA awards arising from a joint‑venture dispute with Prysmian Cavi E Sistemi SRL. The Court held that none of the grounds pleaded under Section 48 of the Arbitration and …
The State of Gujarat awarded a contract to Amber Builders for highway work, which the contractor completed but later faced a claim of defective repair and a demand for Rs.1.09 crore. The State issued a notice seeking payment, which the contractor challenged in the Gujarat High Court, leading to a …
M/s Dyna Technologies entered into a contract with M/s Crompton Greaves for construction work on an aquaculture project, which was terminated prematurely, leading Dyna to claim compensation for loss of profit, idle charges and unproductive use of machinery. The arbitral tribunal awarded Rs 27,78,125 …
The Central Organisation for Railway Electrification (CORE) terminated a Rs 165‑crore work contract with M/s ECI‑SPIC‑SMO‑MCML (JV) and the contractor invoked the arbitration clause. The parties' contract and the modified Clause 64 of the General Conditions of Contract required a three‑member …
The petitioners BGS SGS SOMA JV sought to enforce an arbitral award concerning a hydro‑electric project, while the respondent NHPC Ltd filed a Section 34 petition in the Faridabad court to set aside the award. The petitioners applied under Section 151 CPC to have the petition returned to the …
Hindustan Zinc Limited (HZL) operates four units and a captive power plant, and entered into open‑access agreements with Ajmer Vidyut Vitran Nigam Ltd (AVVNL) for wheeling power to three of its units. A dispute arose over unscheduled interchange (UI) charges under clauses 8 and 9 of the agreements. …
The appellants, owners of a 14-kanal land in Ludhiana, entered into a joint‑venture agreement with the respondent builder to construct a residential‑commercial complex, which was abandoned in 1999. After termination of the agreement, the parties attempted arbitration under the Arbitration and …
The appellant, Deep Industries Ltd, was contractually terminated by ONGC for allegedly supplying second‑hand equipment and was subsequently black‑listed for two years. The dispute was referred to arbitration, where the arbitrator stayed the blacklist order conditionally, and the first appeal under …
The parties entered into a contract on 21‑12‑2010 that contained an arbitration clause. A dispute over payment and security deductions arose, and the contractor served a notice of arbitration on 09‑03‑2016, which the respondent ignored. The contractor then filed an application under Section 11 of …
The Supreme Court examined a batch of writ petitions filed by Hindustan Construction Company Ltd seeking to strike down Section 87 of the Arbitration and Conciliation (Amendment) Act, 2019 and the deletion of Section 26 of the 2015 Amendment, arguing that they revived an automatic‑stay of arbitral …
Perkins Eastman Architects DPC & Anr (applicants) entered into a design‑consultancy contract with HSCC (India) Ltd (respondent) that contained Clause 24 for dispute resolution by a sole arbitrator appointed by the Chairman and Managing Director (CMD) of HSCC. The applicants invoked arbitration on 28 …
The petitioner sought enforcement of a Singapore arbitral award of about Rs.3,500 crore against respondents who owned Fortis Healthcare. The Supreme Court had earlier ordered a status‑quo on 11 August 2017, clarified on 31 August 2017 and modified on 15 February 2018, prohibiting any change in the …
WAPCOS Ltd entered into a contract with Salma Dam Joint Venture (SDJV), a 95%-5% joint venture of SSPPL and AIL, for the reconstruction of the Salma Dam. After the original contract’s arbitration clause, the parties executed an Amendment of Agreement (AoA) on 9 June 2015, which expressly stated that …
The Union of India (Railways) awarded civil engineering contracts to Pradeep Vinod Construction Company, which later claimed additional payments despite having signed final bills and supplementary agreements indicating full settlement. The contractor invoked the arbitration clause in Clause 64 of …
The Oriental Insurance Co. issued a fire insurance policy to Dicitex Furnishing Ltd., which suffered a total loss of stock in 2012. After a protracted assessment process, the insurer eventually offered a settlement of Rs 7.16 crore, far less than the claim of over Rs 14 crore, and conditioned …
M/s. Mitra Guha Builders (India) Co. entered into a construction contract with ONGC that contained Clause 2 allowing the Superintending Engineer to levy liquidated damages for delay, with a finality clause, and Clause 25 mandating arbitration for disputes. The arbitrator allowed the contractor's …
The appellant, Vijay Trading and Transport Co., entered into a two‑year handling and transportation contract with Central Warehousing Corporation. The contract was terminated by the corporation for the appellant’s failure to deliver an export‑loaded container to the port at Navi Mumbai, leading to …
Bharat Petroleum Corporation Ltd (BPCL) supplied aviation fuel to Go Airlines under two supply agreements (2007‑2009 and 2009‑2011). BPCL claimed interest on delayed payments and invoked the arbitration clause, while Go Airlines raised two counter‑claims, one seeking CENVAT credit invoices. The …
The appellant Oriental Insurance filed a petition under Section 34 of the Arbitration and Conciliation Act, 1996 in the Jaipur District Court to set aside an arbitral award, but the court returned the petition for presentation before the Jodhpur court, fixing 2 April 2008 as the date of …
The Okhla Enclave Plot Holders’ Welfare Association filed a writ petition alleging that the Colonizer (Durga Builders Pvt Ltd) failed to honour the terms of the plot‑allotment agreement and that many allottees had not paid the development charges required by the Supreme Court. The Court referred …
Canara Nidhi Ltd. advanced a Rs.50 lakh loan secured by mortgage and a demand promissory note, which the borrower M. Shashikala failed to repay, leading to an arbitral award of Rs.63.82 lakh. Shashikala filed an application under Section 34 of the Arbitration and Conciliation Act, 1996 to set aside …
The Supreme Court examined whether Section 3J of the National Highways Act, 1956, which excludes the Land Acquisition Act's provisions on solatium and interest, violates Article 14 of the Constitution. The Court held that solatium is an integral part of compensation for compulsory acquisition and …
The original landowners entered into development agreements and later formed three societies, including the appellant society, to develop a complex. Disputes arose over the sharing of lease rents collected by the appellant society from a building, leading the respondents to file petitions under …
The appeal concerned the interpretation of Section 11(6A) of the Arbitration and Conciliation Act, 1996, introduced by the 2015 amendment and later omitted by the 2019 amendment. The appellant argued that the Supreme Court or High Court must still examine the existence of an arbitration agreement …
The case arose from a partnership dispute in which one partner lodged an FIR alleging siphoning of funds and other improprieties. The appellant filed an application under Section 11 of the Arbitration and Conciliation Act, 1996 seeking appointment of an arbitrator pursuant to an arbitration clause …
The appellant, M/s Geo Miller & Co., sought appointment of an arbitrator under Section 11(6) of the Arbitration and Conciliation Act, 1996 for three water‑treatment contracts dated 1979‑1985, alleging non‑payment by the respondent. The respondent contended that the cause of action arose when the …
The Union of India appealed against judgments that applied the Madishetti Bala Ramul decision, which interprets the Land Acquisition Act, to disputes under the National Highways Act, 1956. The Supreme Court examined whether the award under the Land Acquisition Act, deemed a government offer under …
The National Highways Authority of India (NHAI) acquired land for a highway and the compensation awarded by the competent authority was challenged by Sayedabad Tea Company Ltd. The aggrieved party applied to the Central Government under Section 3G(5) of the National Highways Act, 1956 for the …
The parties entered into an arbitration agreement that required the arbitrator to render an award within four months of the first preliminary meeting, with any extension needing the consent of both parties. The first preliminary meeting was held on 4 May 2007, but the arbitrator failed to issue an …
M/s Shahi and Associates entered into a construction contract with the Uttar Pradesh government and invoked arbitration in 1999. The arbitrator awarded Rs. 17,86,339 with interest at 18% per annum under Section 31(7)(b) of the Arbitration and Conciliation Act, 1996. The District Judge and the …
Mahanagar Telephone Nigam Ltd. (MTNL) entered into a bond transaction with CANFINA, a wholly‑owned subsidiary of Canara Bank, which later transferred the bonds to its parent. MTNL cancelled the bonds alleging non‑payment of consideration and sought arbitration. The parties exchanged letters and a …
Zenith Drugs & Allied Agencies entered into a 1997 agreement with RPIL appointing it as a clearing and forwarding agent, which contained an arbitration clause. After RPIL merged with Nicholas Piramal India Ltd., the agreement was terminated and the parties settled their dispute through a compromise …
The appellant and respondent entered into a contract for the sale of iron ore pellets that contained an arbitration clause stating that arbitration would be governed by the Indian Arbitration and Conciliation Act, 1996 and that the venue of arbitration would be Bhubaneswar. A dispute arose and the …
The appellants stored agricultural produce in the respondent's cold storage and alleged damage, leading to a dispute. The storage receipt contained an arbitration clause naming Sri S.T. Madnani, an advocate, as the arbitrator. Madnani had previously acted as counsel for a partner of the respondent …
The appellant, Pam Developments Private Ltd., was awarded a sum of Rs.2.87 crore by an arbitrator in a dispute with the State of West Bengal over a highway repair contract, but the award remained unpaid. The State filed a Section 34 petition challenging the award and later sought a stay of its …
The National Highways Authority of India (NHAI) and Gayatri Jhansi Roadways Limited entered into a 2006 contract that contained a detailed fee schedule for arbitrators. After a dispute arose in 2017, NHAI invoked a newer NHAI circular (dated 01‑06‑2017) that amended the fee amounts, while the …
Reckitt Benckiser (India) Pvt Ltd entered into a supply agreement with Reynders Label Printing India Pvt Ltd on 1 May 2014, which contained an arbitration clause. The applicant sought to include Reynders Belgium (respondent No.2), the parent company, in the arbitration, alleging that its …
Parsha Kente Collieries Ltd entered into a Coal Mining and Delivery Agreement with Rajasthan Rajya Vidyut Utpadan Nigam Ltd for coal supply. Disputes arose over price escalation, fixed costs, and an escrow account, leading to arbitration where the arbitrator allowed claims on price adjustment, fixed …
The National Highways Authority of India (NHAI) awarded a construction contract to Ssangyong Engineering & Construction Co. Ltd., which included a price‑adjustment formula based on the Wholesale Price Index (WPI) old series. When the Ministry of Industrial Development stopped publishing the old …
Garware Wall Ropes Ltd. entered into a sub‑contract with Coastal Marine Constructions & Engineering Ltd. that contained an arbitration clause but the sub‑contract was not stamped. When the respondent filed a petition under Section 11 of the Arbitration and Conciliation Act, 1996 for appointment of …
The Union of India (appellant) and several contractors, including Parmar Construction Company (respondent), entered into railway construction contracts containing an arbitration clause (clause 64). After completing work, the contractors submitted final bills with a "No Claim" certificate, but later …
United India Insurance Co. Ltd. settled two fire insurance claims of Antique Art Exports Pvt. Ltd. by issuing full and final discharge vouchers, which the claimant accepted without objection. Eleven weeks later, the claimant alleged that the settlement was obtained through fraud, coercion and undue …
M/S ICOMM TELE Ltd. was awarded a water supply contract by the Punjab State Water Supply & Sewerage Board, which contained an arbitration clause requiring a 10% "deposit-at-call" before invoking arbitration. The company challenged this clause as arbitrary, discriminatory, and violative of Article 14 …
The parties entered into a ten‑year tenancy agreement for godowns that contained an arbitration clause. When the lease expired, the landlord sought possession and invoked the arbitration clause, appointing an arbitrator under Section 11 of the Arbitration and Conciliation Act, 1996. The tenant …
LMJ International Ltd. and Sleepwell Industries Ltd. entered into two separate contracts for the sale of Thai rice, governed by GAFTA 48 with disputes to be arbitrated under GAFTA 125 in London. Two foreign arbitral awards were rendered in favour of the respondent, who then filed execution petitions …
The Municipal Council Thanesar auctioned shop premises to the respondents, but disputes arose over completion and possession. An arbitrator awarded the council to complete the work and to pay interest on advance rent and non‑refundable security at 7% per annum, without specifying the mode of …
MMTC Ltd., a consignment agent for Vedanta Ltd., supplied copper rods to Hindustan Transmission Products Ltd. (HTPL) under an amended agreement and failed to collect and remit payment, prompting Vedanta to invoke the arbitration clause of their 1993 agreement. The arbitral tribunal awarded Vedanta a …
The appellant, a coal buyer, entered into several sale orders under Coal India Ltd.'s 2007 e‑auction scheme, which contained an arbitration clause (Clause 11.12). After the appellant was deemed to have breached the scheme and his earnest money deposit was forfeited, he invoked the arbitration …
The appeal concerned a custody dispute over a child born to Perry Kansagra and Smriti Madan Kansagra. After mediation failed, the High Court had held that the mediator’s and counsellor’s reports were confidential and could not be used, and later set aside that decision on review. The Supreme Court …
Jai Prakash Associates Ltd. (JAL) entered into a contract with Tehri Hydro Development Corporation Ltd. (THDC) that contained General Conditions of Contract (GCC) clauses 50 and 51 expressly prohibiting any interest on monies due. An arbitral tribunal under the Arbitration and Conciliation Act, 1996 …
The dispute arose from a contract between Rajasthan Small Industries Corporation Ltd (RSIC) and M/s Ganesh Containers Movers Syndicate, which contained a clause appointing the Managing Director (MD) of RSIC or his nominee as the sole arbitrator. After several delays and changes of arbitrators, the …
The Government of Haryana entered into a BOT concession agreement with M/s G.F. Toll Road Pvt. Ltd., which contained an arbitration clause requiring each party to nominate an arbitrator and the third arbitrator to be appointed by the Indian Council of Arbitration (ICA). When the State nominated a …
Emaar MGF Land Ltd. (appellant) entered into a buyer's agreement with Aftab Singh (respondent) that contained an arbitration clause under the Arbitration and Conciliation Act, 1996. Singh filed a complaint before the National Consumer Disputes Redressal Commission (NCDRC) invoking the Consumer …
The State Trading Corporation (STC) entered into a tripartite agreement with Global Steel Holding Ltd. (GSHL) and Global Steel Philippines Inc. (GSPI) for the sale of steel coils, which later gave rise to settlement agreements under the Arbitration and Conciliation Act, 1996. GSHL and GSPI defaulted …
Simplex Infrastructure Ltd entered into a contract with the Union of India for construction of shelters, which led to arbitration and an award dated 27 October 2014 in favour of Simplex. The Union of India filed a Section 34 application before the District Judge on 30 January 2015, which was …
The appellant, a construction contractor, entered into a contract with the State of Himachal Pradesh that contained Clause 65, which stipulated that any dispute would be referred to a sole arbitrator appointed by the Engineer‑in‑Chief. When a dispute arose, the Chief Engineer appointed the …
The Municipal Corporation of Greater Mumbai issued a tender for water meters, which was accepted and a contract containing a clause stating "No Arbitration is allowed" was executed. The respondent filed a Section 9 application under the Arbitration and Conciliation Act, 1996 seeking an injunction, …
NHPC Ltd appealed against a Punjab and Haryana High Court order that, under Section 9 of the Arbitration and Conciliation Act, 1996, required it to release the amount awarded to M/s Patel Engineering Ltd, subject to a bank guarantee. The appellant contended that the High Court had acted beyond its …
The South Delhi Municipal Corporation (SDMC) entered into a 2011 agreement with SMS AAMW Tollways Private Ltd for toll tax collection, which included Clause 16 detailing a two‑stage dispute‑resolution mechanism: first to a Competent Officer and then an appeal to the Commissioner. After a loss of …
P.E.C. Limited chartered a vessel from Austbulk Shipping and a dispute arose over freight and demurrage. The parties had an arbitration clause in the charter party, and a sole arbitrator awarded US$150,362.18 to Austbulk. P.E.C. filed a petition for enforcement of the foreign award in the Delhi High …
The dispute arose from a multimodal transport Bill of Lading in which the respondent, Premier Sea Foods, filed a suit in Kochi to recover a sum, relying on the Bill of Lading as part of its cause of action. The appellant, Caravel Shipping Services, filed an application under Section 8 of the …
The Transmission Corporation of Andhra Pradesh Ltd. (appellant) awarded contracts to Equipment Conductors and Cables Ltd. (respondent) which led to arbitration where claims on invoices 1‑57 were held time‑barred and no award was made. The respondent unsuccessfully sought execution of those amounts, …
Vedanta Ltd entered into four EPC contracts with Shenzen Shandong Nuclear Power Construction Co. Ltd for a 210‑MW co‑generation plant. After termination of the contracts, the Chinese company invoked the arbitration clause and obtained an award granting sums in INR and EUR, with interest at 9% for …
The Mumbai Metropolitan Region Development Authority (MMRDA) entered into a monorail contract with a consortium comprising Larsen & Toubro (India) and Scomi Engineering Bhd (Malaysia). Disputes over interim claims led the consortium to file a petition under Section 11 of the Arbitration and …
The parties, heirs of a deceased businessman, disputed the division of his properties and resolved the matter by arbitration, which resulted in an award on 18 February 2010 that was received on 21 February 2010. The respondents filed an application under Section 34(3) of the Arbitration and …
The Union of India challenged an arbitral award made in its favour by Hardy Exploration and Production (India) Inc, contending that Indian courts had jurisdiction to entertain a Section 34 application despite the arbitration agreement specifying Kuala Lumpur as the "venue" for proceedings. The Delhi …
The petitioner, an Indian shipping company, entered into an agency agreement with a Bangladeshi shipping firm. The petitioner alleged breach of the agreement and claimed a sum of USD 134,875.88. The agreement contained a clause stating that any dispute not settled amicably shall be resolved by …
The petitioners, a Chinese elevator guide‑rail manufacturer, filed an arbitration petition under Section 11(5) of the Arbitration and Conciliation Act, 1996, seeking the appointment of a sole arbitrator pursuant to Clause 15 of their 2014 Commission Processing Contract with the respondents, an …
The parties obtained an ICC arbitral award in London ordering RioGlass Solar to pay Shriram EPC Ltd €4.36 million. Shriram filed a petition under Section 47 of the Arbitration and Conciliation Act, 1996 to enforce the foreign award in India, while RioGlass contended that the award was unenforceable …
The Jawaharlal Nehru Port Trust (JNPT) issued a Request for Qualification and a Request for Proposal for a container terminal project. A consortium comprising PSA Mumbai Investments and another company qualified, received a Letter of Award (LOA) which was later withdrawn after the second member …
The appellant, a developer, was ordered by the Bombay High Court to hand over eight flats and sixteen parking spaces to the plaintiff under a settlement agreement between the plaintiff and another respondent, even though the appellant had no direct contract with the plaintiff. The appellant …
The Supreme Court examined whether clause 7 of a Contractor's All Risk insurance policy constituted a valid arbitration clause. The clause stipulated that arbitration would apply only if the insurer admitted liability and a dispute arose over the quantum payable. The insurer, United India Insurance, …
The dispute arose between M/s Emkay Global Financial Services Ltd., a broker on the National Stock Exchange (NSE), and its client Giradhar Sondhi over securities transactions. An arbitration under NSE bye‑laws was held in Delhi, resulting in an award rejecting Sondhi’s claim. Sondhi filed a Section …
The appellant (KCPL) challenged a Section 9 petition filed by the respondent (Vijay Nirman) which sought to treat an arbitral award as an undisputed operational debt. The award, favouring the respondent, was under challenge in a Section 34 petition under the Arbitration and Conciliation Act. The …
The appeal arose from a Section 34 petition challenging an arbitral award where the filing party had not issued the prior notice or filed the required affidavit under Section 34(5) of the Arbitration and Conciliation Act, 1996. The Patna High Court had held the provision mandatory and dismissed the …
The dispute arose from a 2005 Memorandum of Understanding for the sale of shares, where Clause 12 referred to "Mediators/Arbitrators" making decisions on breaches. The appellant contended that Clause 12 constituted an arbitration clause under the Arbitration and Conciliation Act, 1996. The Court …
Reliance Cellulose Products Ltd. and ONGC entered into a contract for supply of CMC. A dispute arose over the price, which was referred to arbitration. The arbitrator fixed a higher price and awarded pre‑reference, pendente‑lite and future interest at 18% per annum. The Civil Judge reduced the …
The Indian Oil Corporation (IOC) terminated the dealership of T. Natarajan for alleged breaches, leading to arbitration which upheld the termination but gave the dealer liberty to seek reconsideration. The dealer filed a representation for restoration, which IOC rejected; the dealer then filed a …
The National Highways Authority of India (NHAI) entered into a concession agreement with Gwalior Jhansi Expressway Limited (GJEL) to widen NH‑75. GJEL failed to complete the work, leading to arbitration. Both parties filed Section 17 applications before the arbitral tribunal seeking interim relief. …
The appeal concerned four contracts entered into for the commissioning of a 2 MWp photovoltaic solar plant, three of which contained arbitration clauses while the Sale and Purchase Agreement dated 05.02.2012 did not. The Delhi High Court had dismissed an application under Section 8 of the …
The appellant and respondents entered into a partnership agreement in 2005 that contained an arbitration clause referring to the Indian Arbitration Act, 1940. The respondents filed a suit seeking injunction, and the appellant moved an application under Section 8 of the Arbitration and Conciliation …
The appellant Oriental Insurance Company Ltd issued a fire industrial all‑risk policy to the respondent M/s Narbheram Power and Steel Pvt. Ltd. After a cyclone caused alleged losses, the insurer repudiated the claim, refusing to accept liability and declined to refer the dispute to arbitration. The …
The Union of India challenged an international commercial arbitration award in favour of Hardy Exploration and Production (India) Inc. by filing an application under Section 34 of the Arbitration and Conciliation Act, 1996. The respondent argued that Indian courts lacked jurisdiction because the …
The dispute arose from a share purchase agreement where KCP and its nominees, including Cheran Properties Limited (the appellant), were to acquire shares of SPIL from KSL. The parties later entered arbitration, which awarded KSL the return of share documents and payment of Rs 3.58 crore. The award …
The Union of India contracted with M/s Varindera Constructions for residential construction, incorporating Clause 19 (no escalation reimbursement) and Clause 6.3 (no claim for excess wages) in the agreement. During performance, the Haryana government raised the minimum wages, and the contractor …
The Supreme Court considered an appeal by the Madhya Pradesh Rural Road Development Authority challenging a High Court order that had invoked Section 11 of the Arbitration and Conciliation Act, 1996 to adjudicate a dispute. The dispute concerned the applicability of the Madhya Pradesh Madhyastham …
The State of Chhattisgarh appealed against an order of the High Court that had directed the parties to approach the Arbitration and Conciliation Act, 1996 for resolution of a dispute with M/S KMC Construction Limited. The Supreme Court examined whether the Madhya Pradesh Madhyastham Adhikaran …
The petitioners, IBI Consultancy India Private Limited and its parent IBI Group, entered into six contracts with DSC Limited for toll and traffic management systems on two highway projects. The contracts contained an arbitration clause stipulating that disputes be referred to an independent …
The Supreme Court considered appeals challenging a High Court order that held a petition under Section 34 of the Arbitration and Conciliation Act, 1996 was time‑barred. The petitioners, led by the late Anilkumar Patel, argued that the arbitral award dated 07‑07‑1996 had not been served on the other …
The dispute concerned the execution of a works contract which was referred to an arbitrator who awarded in favour of M/s Lion Engineering Consultants. The State of Madhya Pradesh challenged the award under Section 34 of the Arbitration and Conciliation Act, 1996 and sought to amend its objections …
The State of Bihar challenged the appointment of an arbitrator under Section 11(6) of the Arbitration and Conciliation Act, 1996, arguing that the Bihar Public Works Contracts Arbitration Tribunal Act, 2008 excluded the Central Act for works contracts. The parties had a contract dated 22 June 2012 …
The Board of Control for Cricket in India filed a Section 34 challenge to arbitral awards dated June 2015, and the award creditors sought execution. The award debtor argued that the pre‑amended Section 36 imposed an automatic stay on execution until the Section 34 petition was decided, while the …
The Bar Council of India appealed against orders allowing foreign law firms and lawyers to operate in India, arguing that the Advocates Act, 1961 restricts the practice of law to advocates enrolled with the Bar Council, covering both litigation and non‑litigation work. The Supreme Court examined …
The Kerala State Electricity Board (KSEB) contracted with Kurien E. Kalathil to construct a dam, after which a government notification raised minimum wages, leading the contractor to claim labour‑escalation charges with interest (Ex.P‑20) and additional work charges (Ex.P‑59). The High Court ordered …
Indiabulls Housing Finance Ltd (appellant) sought to enforce loan recovery against Deccan Chronicle Holdings Ltd and others under the SARFAESI Act after the original lender, Indiabulls Financial Services Ltd (IBFSL), merged into Indiabulls Housing Finance. The High Court held that SARFAESI could not …
The National Highway Authority of India (NHAI) awarded road construction contracts that contained a price‑adjustment clause (Clause 70.3) requiring calculation of adjustments for components such as bitumen, cement and steel. The clause stipulated percentages (x, y, z) to be the "actual percentage of …
The National Highway Authority of India awarded a BOT concession to a concessionaire, which in turn engaged an EPC contractor who contracted with the respondent to execute highway works. The respondent sub‑contracted the work to the appellant. A dispute arose and the appellant sought arbitration, …
Sundaram Finance Ltd. granted a loan to Abdul Samad, who defaulted, leading to arbitration under the loan agreement. An ex parte award of Rs.12.69 lakh was made, and Sundaram sought execution of the award in the Morena court, which dismissed the application for lack of jurisdiction, directing the …
The appellants sought to enforce a foreign arbitral award in Gujarat High Court, which ordered enforcement. They then challenged the order by filing an appeal under Section 13(1) of the Commercial Courts Act, arguing that an appeal was permissible even though Section 50 of the Arbitration and …
ONGC Mangalore Petrochemicals Ltd. awarded a construction contract to ANS Constructions Ltd. The contractor paid the final bill of Rs.20.34 crore after receiving a No Dues/No Claim Certificate on 21 September 2012. The contractee later withdrew the certificate on 24 October 2012 alleging it was …
Bengal Chemists & Druggists Assn. appealed against an order of the National Company Law Appellate Tribunal (NCLAT) that dismissed its appeal as not maintainable because it was filed nine days after the initial 45‑day limitation period and after the additional 45‑day grace period had also expired. …
The appellant, Indian Farmers Fertilizer Co‑operative Ltd., issued a tender for defoamers which was won by the respondent, Bhadra Products. After the respondent supplied the goods, a payment dispute arose and the parties went to arbitration. The sole arbitrator first decided the issue of limitation, …
Maharashtra State Electricity Distribution Co. Ltd. (MSEB) awarded a contract to Datar Switchgear Ltd. (DSL) for installing Low Tension Load Management Systems. MSEB repeatedly failed to provide the list of locations (DTC lists) required for installation and also delayed renewal of the Letter of …
M/S. INOX WIND Ltd. issued purchase orders to M/S. THERMOCABLES Ltd. for wind‑power cables, attaching its own standard terms and conditions which contained an arbitration clause. After the cables were found defective, INOX gave notice proposing a sole arbitrator but received no response, and filed …
The case concerned the rehabilitation of about 800 slum dwellers in Mumbai who owned the land through a cooperative society. Susme Builders (the appellant) and J.G. Developers (respondent No.4) each claimed to have the consent of at least 70% of the eligible slum dwellers required under the …
The State of Jharkhand appealed against an award made by an arbitrator appointed by the Supreme Court, contending that the Court could not entertain an application to make the award a rule of court merely because it retained seisin over the arbitration. The Supreme Court examined the scope of …
The Union of India entered into a works contract with Mis. Susaka Pvt. Ltd. and, after disputes arose, the matter was referred to an arbitral tribunal which awarded damages and interest on several claims. The Union challenged the award of interest under Section 34 of the Arbitration and Conciliation …
Sutlej Construction was awarded a contract by the Union Territory of Chandigarh for earth excavation, loading, and transport. The contract was terminated by the respondent, leading the appellant to invoke the arbitration clause; an arbitrator was appointed and issued an award partially in favour of …
Bank of India filed a recovery suit under the RDDBFI Act and, after auctioning the mortgaged property, appointed Yadav Consultancy Services as Court Commissioner to safeguard the property. The bank later discharged the commissioner and was directed by the Recovery Officer to continue paying his …
Venture Global Engineering (Venture) and Tech Mahindra (formerly Satyam) entered into a joint‑venture agreement under which each held 50% of a JV company. An arbitration under the London Court of International Arbitration awarded the shares of Venture to Satyam, finding Venture in default. After the …
The landlord filed a civil suit seeking eviction of the premises leased to the defendant, Himangni Enterprises. The lease deed contained an arbitration clause, prompting the defendant to file an application under Section 8 of the Arbitration and Conciliation Act, 1996 to refer the dispute to …
The appellant, a contractor, entered into a contract with the Union of India for railway works and later issued a 'No Claims Certificate' after abandoning the work. Disputes arose and the appellant sought arbitration under Section 11(6) of the Arbitration and Conciliation Act, 1996, leading to an …
The Supreme Court, hearing Civil Appeal No. 1093 of 2006, examined whether it could entertain an application under Section 34 of the Arbitration and Conciliation Act, 1996 to make an arbitral award a rule of the Court when the Court itself had retained seisin over the arbitration proceedings. The …
The appellants borrowed money from the respondent, securing the loan with seven immovable properties. Their loan account was declared a non‑performing asset and the parties’ contract contained an arbitration clause, leading the respondent to initiate arbitration while also issuing notices under …
The dispute arose when an arbitrator, appointed with the parties' consent, terminated the arbitration under Section 25(a) of the Arbitration and Conciliation Act, 1996 because the claimant failed to file a statement of claim within the time prescribed under Section 23(1). The claimant later filed an …
Aravali Power Company Pvt. Ltd. (appellant) and M/s. Era Infra Engineering Ltd. (respondent) entered into a contract for constructing a township for a thermal power project, which contained an arbitration clause (Clause 56) stipulating that disputes be referred to the Project In‑charge or, failing …
The dispute arose from a fourth arbitration between HRD Corporation and GAIL (India) Ltd. over a long‑term wax supply contract. The appellant challenged the appointments of two arbitrators, Justice K.K. Lahoti and Justice K. Doabia, invoking Sections 12 and 14 of the Arbitration and Conciliation …
The appellant, Yusuf Khan, owned a 2412 sq. yard property in Mumbai and entered into a development agreement on 23 June 2006 with two developers to construct a building, granting the developers a 50% share of the development potential. The developers failed to commence or complete construction …
The appellants challenged the admission of a demarcation report prepared by a government agency during conciliation proceedings against the respondent. The High Court had allowed the report as evidence, but the Supreme Court examined whether this contravened Sections 75 and 81 of the Arbitration and …
The appellant, Terapalli Dyvasahata Kumar, filed a petition under Section 23 of the Andhra Pradesh Societies Registration Act, 2001, seeking declarations and injunctions concerning the management of a society. The District Court allowed the petition, holding that "District Court concerned" should be …
The Punjab State Civil Supplies Corporation Ltd. obtained a money award of Rs.10,24,847.15 from Mis Atwal Rice & General Mills in an arbitration proceeding, which became final after the respondents' Section 34 challenge was dismissed. The appellant filed an execution petition under Section 36 of the …
The sole arbitrator, on 7 October 2010, issued an interim order under Section 17 of the Arbitration and Conciliation Act, 1996 prohibiting the disposal of any flats without its leave. The respondent transferred five flats on 14 October 2010, breaching that order, and the arbitrator later found the …
The appellant, Navnirman Development Consultants, was awarded a contract to construct a sports complex for a government agency, completed the work, but was not paid for its bills. The parties' agreement contained an arbitration clause, and when the respondent failed to constitute an arbitral …
The parties entered into a shareholders' agreement that stipulated arbitration under ICC Rules with the venue in London and the agreement governed by Indian law. The appellants argued that, based on the English court's interpretation and the Supreme Court's endorsement in BALCO and Enercon, the seat …
The dispute arose from a purchase order between TRF Ltd (appellant) and Energo Engineering Projects Ltd (respondent) where the contract stipulated that any dispute be referred to the Managing Director of the buyer or his nominee as sole arbitrator. After the Arbitration and Conciliation (Amendment) …
The appellants, joint owners of a property, entered into development agreements with the respondent which contained an arbitration clause. A dispute arose and an arbitrator awarded in favour of the respondent, but the award was unreasoned. The appellants challenged the award under Section 34 of the …
Indus Mobile Distribution Pvt. Ltd. appealed against a Delhi High Court order that had entertained interim relief applications, holding that the court had jurisdiction because the cause of action did not arise in Mumbai. The parties' agreement designated Mumbai as the seat of arbitration and …
Power Machines India Ltd obtained an arbitral award under the Micro, Small and Medium Enterprises Development Act, 2006 directing it to pay a sum to Lakshmi Engineering Industries. The State of Madhya Pradesh, invoking Rule 5 of the Madhya Pradesh MSME Facilitation Council Rules, 2006, sought …
The Union of India entered into a reconstruction contract with M/s. Simplex Infrastructures Ltd, which it later rescinded alleging delay. An arbitrator held the rescission illegal and awarded payment to the respondent. The Union filed a petition under Section 34 of the Arbitration and Conciliation …
The parties entered into a written construction contract on 06‑06‑2009 containing an arbitration clause. Disputes over construction quality led to a meeting where the contract was terminated by mutual consent and an oral agreement was made with the husband of the original contractor to supervise the …
The Union of India appealed a High Court order that appointed an independent arbitrator in a dispute with BESCO Ltd. The issue was whether, under Section 11(6) of the Arbitration and Conciliation Act, 1996, the Chief Justice of a High Court or a designated judge must appoint the arbitrator named in …
The appellant Imax Corporation and the respondent MIS E‑City Entertainment entered into a contract containing an arbitration clause that referred to the ICC Rules of Arbitration and stipulated that the agreement would be governed by Singapore law. The parties submitted their dispute to the ICC, …
Black Pearl Hotels (Pvt) Ltd. entered into a "conducting agreement" with M/s Planet M Retail Ltd. and later sought arbitration under the Arbitration and Conciliation Act, 1996. The High Court Judge, invoking s.33(2)(b) of the Karnataka Stamp Act, 1957, referred the matter to the Registrar to …
M/s. Voestalpine Schienen GmbH (petitioner) entered into a contract with Delhi Metro Rail Corporation Ltd. (DMRC) for supplying rails. Disputes arose over payments and liquidated damages, and the parties invoked an arbitration clause that required DMRC to prepare a panel of serving or retired …
Centrotrade Minerals & Metal Inc. and Hindustan Copper Ltd. entered into a contract containing Clause 14, which provided for a two‑tier arbitration: first before the Indian Council of Arbitration and, if dissatisfied, a second "appeal" arbitration in London under ICC rules. A dispute arose; the …
Mears Group Inc., a US company, entered into a contract with Fernas Insaat A.S., a Turkish firm, to perform horizontal directional drilling for a pipeline project in Bangladesh. The work order contained an arbitration clause requiring disputes to be referred to a sole arbitrator appointed by mutual …
Greaves Cotton Ltd entered into a contract with United Machinery & Appliances that contained an arbitration clause. United Machinery filed a civil suit for loss and damage, and Greaves sought an eight‑week extension to file its written statement while invoking the arbitration clause. The respondent …
Mahanagar Telephone Nigam Ltd. appealed a Delhi High Court order that had held the Code of Civil Procedure (CPC) applicable to an appeal under Section 37 of the Arbitration and Conciliation Act, 1996 and had entertained a cross‑objection under Order XLII Rule 22 CPC. The Supreme Court examined …
The dispute concerned benefits under a retirement deed and a partnership deed of a beedi‑manufacturing firm, both containing arbitration clauses. The defendants filed an application under Section 8(1) of the Arbitration and Conciliation Act, 1996 seeking to refer the matter to arbitration, but did …
The appellant, a partner in a hotel partnership, filed an application under Section 8 of the Arbitration and Conciliation Act, 1996 seeking to refer a civil suit filed by the other partners to arbitration. The respondents argued that serious allegations of fraud and mis‑appropriation of funds made …
Arun Dev Upadhyaya appealed against a judgment of the Single Judge of the Bombay High Court that enforced an international arbitration award against one of the respondents but not the other. The appeal raised the question of whether a Letters Patent appeal could be filed before the Division Bench …
The appellant, a successful purchaser at a sealed‑tender sale, sought to enforce a sale certificate issued after the execution of an award under the Multi‑State Co‑operative Societies Act, 1984. The respondents, borrowers, had defaulted on a loan and the property was sold after multiple failed …
Sasan Power Ltd entered into Agreement‑I with the American company NAC, which contained an arbitration clause governed by English law and seated in London. Two years later the parties executed Agreement‑II, a tripartite deed involving Sasan Power, NACC India (a subsidiary of NAC) and NAC, which …
The appellants and respondents are beneficiaries of a family trust created by a deed that contains clause 20, which purports to refer any disputes among beneficiaries to arbitration under the Indian Arbitration Act, 1996. The respondents filed an application under Section 11 of the Arbitration and …
The Supreme Court examined a petition by Etoile Creations seeking the appointment of a sole arbitrator under Sections 11(5) and 11(9) of the Arbitration and Conciliation Act, 1996, invoking the arbitration clause in a Buyers Agreement dated 18‑Oct‑2012 with SARL Danset Deco. The parties were in …
The dispute concerned a clause in a railway‑contractor agreement that required the contractor to give a written demand for arbitration, after which the Railways had 60 days to furnish a panel of more than three eligible railway officers. The contractor sent its demand on 12 June 2013 but filed an …
The parties entered into a construction contract containing an arbitration clause, and an award was rendered on 11 November 2010. The respondent later filed a Section 11 application in the High Court seeking appointment of an arbitrator, claiming the clause was invalid; the application was …
The appellant, a landowner of 15.53 acres, disputed a Memorandum of Understanding (MoU) dated 27‑05‑2013 that the respondents claimed required him to sell half the land. The respondents filed an arbitration application under Section 11 of the Arbitration and Conciliation Act, 1996, seeking …
Northern Coalfield Ltd., a government-owned corporation, entered into two contracts with Heavy Engineering Corp. Ltd. which contained an arbitration clause. Disputes were referred to the Government's "permanent machinery of arbitration" and awards were made, which Northern Coalfield challenged …
M/s Emm Enn Associates (contractor) completed a security‑fencing contract for the Government in July 2000 and received payment on 10 April 2001 for the undisputed portion of the final bill. The contract provided a two‑year defect‑liability period for the Government to recover any over‑payment, but …
The appellant, an unregistered partnership firm, entered into a construction contract with the respondent and later contested the respondent's claim in arbitration. The respondent argued that Section 69(3) of the Partnership Act, 1932 barred the firm from participating in arbitral proceedings …
Eitzen Bulk A/S and Ashapura Minechem Ltd entered into a charter party that contained an arbitration clause specifying London as the seat and English law as the governing law. A dispute arose and was arbitrated in London, resulting in an award against Ashapura. Ashapura sought to set aside the award …
M/s Gangotri Enterprises Ltd entered into two contracts with North Central Railway: a 2005 earth‑work contract that was later terminated, and a 2006 Anand Vihar works contract for which it furnished a performance bank guarantee. After completing the 2006 work, the contractor sought the return of the …
The case concerned whether an arbitrator could award pendente lite interest when the underlying contract expressly barred interest on delayed payments. The dispute arose from a construction contract between the Union of India and M/s. Ambica Construction, which had undergone multiple arbitrations …
Bharat Aluminium Company entered into a 1993 contract with Kaiser Aluminium Technical Services Inc. that contained an arbitration clause specifying that any disputes would be resolved under English arbitration law, while the contract itself was governed by Indian law. The arbitration was conducted …
Venkatesh Construction Company sued Karnataka Vidyuth Karkhane Ltd for Rs.30 lakh for extra work, stoppage of work, and loss of stocked material. The trial court awarded Rs.3,23,000 with 12% interest, finding that extra work was required and the respondent had directed a stoppage. The High Court …
The dispute involved the A.P. Power Coordination Committee and related entities (appellants) and M/s. LanCo Kondapalli Power Ltd. (respondent) over capacity‑charge bills and a claim for reimbursement of Minimum Alternate Tax (MAT) under their Power Purchase Agreement (PPA). The key questions were …
The appeal arose from a dispute where the parties, after settling most issues in a suit, referred two remaining differences to arbitration before a retired Supreme Court judge. The arbitrator resigned, and the respondent sought a substitute arbitrator. The High Court appointed a retired judge as a …
Sumer Builders Pvt. Ltd. entered into a development agreement and MoU with Narendra Goran for a land parcel in Indore. After disputes over payment and possession, the respondent terminated the agreements and invoked the arbitration clause. The developer applied to the Bombay High Court for interim …
The Union of India and Reliance Industries Ltd. entered into Production Sharing Contracts for the Tapti and Panna Mukta fields that contained an arbitration clause stipulating that disputes be resolved under UNCITRAL rules, with the seat in London and the arbitration agreement governed by English …
The Supreme Court examined a dispute arising from a 1999 technology‑transfer agreement between the government‑run research institute ARCI and private firm Nimra Cerglass. Nimra alleged that ARCI made false representations about having a perfected extruded ceramic honeycomb technology, leading it to …
The Union of India entered into a construction contract with M/s Bright Power Projects (I) Ltd that expressly barred any interest on amounts payable to the contractor. A dispute was referred to an arbitral tribunal, which awarded interest pendente lite from the date of reference to the date of award …
Essar Oil Ltd., a subcontractor of Hindustan Shipyard Ltd. (the respondent), performed work under a contract between Hindustan Shipyard and ONGC. Although ONGC sometimes paid Essar directly, the payment was made on behalf of Hindustan Shipyard and no contract existed between ONGC and Essar. A …
IRCON International, the main contractor, entered into two sub‑contracts (C1 and C2) with Vinay Heavy Equipments for road work. The subcontractor completed about 67% of the work and claimed an unpaid balance of Rs 61 lakhs, leading to arbitration (First Arbitration) in which the arbitrator awarded …
M.P. Steel Corporation imported a vessel and disputed the customs duty assessed on its light displacement tonnage. After paying duty, the corporation appealed the Collector's order before the Customs, Excise and Gold (Control) Appellate Tribunal (CEGAT), which allowed the appeal, but the Supreme …
Ashapura Mine‑Chem Ltd. and Gujarat Mineral Development Corporation (GMDC) entered into a Memorandum of Understanding (MoU) in 2007 to set up a joint venture for an alumina plant. The MoU contained arbitration clauses (Clauses 26 and 27) requiring bilateral settlement first and, failing that, …
Harmony Innovation Shipping Ltd. entered into a charter agreement with Gupta Coal India Ltd. that stipulated arbitration in London, governed by English law, and specified the arbitrators as members of the London Arbitration Association. The appellant sought interim relief under Section 9 of the …
Sundaram Finance Ltd. filed a suit for injunction to restrain the repossession of a vehicle financed to T. Thankam. The loan agreement contained an arbitration clause (clause 22) and a repossession clause (clause 14.6). The respondent filed the injunction suit in a civil court; the appellant moved …
M/s. Bhandari Udyog Ltd., a cotton ginning business in Raichur, Karnataka, sold 750 bales of cotton to Respondent No.2, a spinning mill in Latur, Maharashtra. A dispute over the unpaid balance was referred to arbitration under the Arbitration and Conciliation Act, 1996, and an award was made …
The Supreme Court examined whether the Board of Control for Cricket in India (BCCI) is a "State" under Article 12 and concluded that, although it is not, it performs public functions and is therefore amenable to writ jurisdiction under Article 226. The Court upheld the Probe Committee’s findings …
The parties were partners in a firm and a civil suit was filed concerning partnership property. The partnership deed contained an arbitration clause, but the civil court, after hearing the parties, held that it had jurisdiction to try the suit and declined to refer the matter to arbitration under …
International Amusement Ltd (operator of "Appu Ghar") held a licence from the India Trade Promotion Organisation (ITPO) to occupy land in Pragati Maidan. Clause 28 of the licence agreement provided that any dispute would be referred to arbitration by the Chairman of ITPO or his nominee. After the …
The appeal concerned a dispute between Govind Rubber Ltd. (appellant) and Louids Dreyfus Commodities Asia Pvt. Ltd. (respondent) over two sales contracts for natural rubber that contained an arbitration clause referring disputes to the Singapore Commodity Exchange. The appellant argued that no valid …
M/S MSP Infrastructure Ltd. and M.P. Road Development Corp. entered into a road development contract that was later referred to arbitration under the Arbitration and Conciliation Act, 1996. The arbitral tribunal awarded Rs. 6.90 crores to the appellant, after which the respondent filed a petition …
Genus Power Infrastructure Ltd., the insured, suffered fire damage and claimed under a fire policy issued by New India Assurance Ltd. The insurer assessed the loss and the parties executed a letter of subrogation on 11 March 2011, wherein the insured accepted Rs 5.96 crore as full and final …
Associate Builders entered into a construction contract with the Delhi Development Authority (DDA) for a housing project. After completing only part of the work, the contractor filed 15 claims for overheads, damages and price escalations, which were largely awarded by an arbitrator. The Single Judge …
The Supreme Court examined whether Section 31(7) of the Arbitration and Conciliation Act, 1996 permits an arbitral tribunal to include pre‑award interest in the "sum" for which an award is made and thereby allow interest on that interest for the post‑award period. The Court held that the word "sum" …
Swan Gold Mining Ltd, an Australian company, entered into a contract with Hindustan Copper Ltd for the operation of a mine, agreeing that the successful bidder would be liable for taxes as per the Notice Inviting Tender (NIT) and subsequent Work Order. After completing work, the appellant sought …
The Union of India entered into a construction contract with U.P. State Bridge Corp. Ltd. that contained an arbitration clause under the General Conditions of Contract 2001, Clause 64. An arbitral tribunal of Railway officers was constituted in 2007 but failed to complete the proceedings for four …
The State of West Bengal filed a Section 34 application to set aside an arbitral award before the District Court of Jalpaiguri, while the High Court of Calcutta had earlier entertained interim relief under Section 9 and appointed an arbitrator under Section 11. The High Court held that, under …
M/s Harsha Constructions entered into a contract with the Union of India for bridge construction, which contained Clause 39 governing extra work and Clause 63 listing "excepted matters" that were excluded from arbitration. A dispute arose over the rate payable for extra work, which the contractor …
The dispute arose from an arbitration under Clause 70 of a contract, where the arbitrator issued an award without recording any reasons, merely noting "sustained", "partly sustained" or "not sustained" in the column titled "findings". The Delhi High Court set aside the award, holding that the term …
The Oil & Natural Gas Corporation (ONGC) awarded a contract to Western Geco for modernising a seismic vessel, which was to be returned by 9 July 2001. The vessel was delayed until 6 May 2002 due to licensing issues for US‑origin hydrophones and subsequent substitution with Canadian ones, leading …
Bharat Heavy Electricals Ltd. (BHEL) engaged Tata Projects Ltd. as a sub‑contractor to erect, test and commission two 120 MW boilers. Disputes arose and an arbitral tribunal awarded Rs.69.22 lakh on various heads and Rs.25.39 lakh as interest. BHEL challenged the award under Section 34 of the …