Patna High Court

The Bihar State Food and Civil Supplies Corporation Ltd.versusPiyus Kumar

Decided
Disposal
DISPOSED

Holding

The High Court corrected the principal award amount, set aside the compensation and pre‑award interest, and upheld the post‑award interest, thereby partially allowing the appeal.

Summary

The Bihar State Food and Civil Supplies Corporation (appellant) entered a three‑year transport‑handling agreement with Piyush Kumar (respondent) for the Madhubani district. The contract was terminated and the respondent was black‑listed, leading to arbitration where the sole arbitrator awarded Rs 2,67,37,638.62, compensation of Rs 25 lakhs, and both pre‑award (10%) and post‑award (18%) interest. The appellant challenged the award under Sections 34 and 37 of the Arbitration Act, alleging computational errors, lack of supporting documents, breach of contract, and that the award violated the agreement’s prohibition on interest and detention charges. The High Court held that the award contained a clerical error in the principal sum, that the pre‑award interest and compensation were contrary to the contract and public policy, and that post‑award interest was permissible. Accordingly, the court corrected the principal amount to Rs 2,61,66,578.62, set aside the compensation and pre‑award interest, and upheld the post‑award interest, partially allowing the appeal.

Issues considered

  • The validity of the arbitral award under Section 34(2) and 34(2A) of the Arbitration Act, 1996
  • Whether the award contains a computational or typographical error requiring correction under Section 33(3)
  • Whether the arbitrator exceeded jurisdiction by awarding interest despite the contract’s express bar (Clause 14) and by awarding compensation under Section 54 of the Indian Contract Act
  • Whether the award violates public policy of India or is patently illegal
  • Whether the award properly considered the detention‑bill deductions under Clause 22 of the agreement

Legislation cited

Subjects

  • Arbitration
  • Section 34
  • Section 37
  • Award correction
  • Interest award
  • Compensation
  • Public policy
  • Patent illegality
  • Commercial dispute
  • Contract breach
  • Blacklisting

Judgment

         IN THE HIGH COURT OF JUDICATURE AT PATNA
                      COMMERCIAL APPEAL No.7 of 2025
     ======================================================
1.    The Bihar State Food and Civil Supplies Corporation Ltd. Sone Bhawan,
      Daroga Prasad Rai Path, R. Block, Road No 2, Patna 800001, through its
      Managing Director.
2.   The Managing Director, The Bihar State Food and Civil Supplies
     Corporation Ltd. Khadya Bhawan, R. Block, Rd. No. 2, Patna 800001.
3.    The District Manager, The Bihar State Food and Civil Supplies Corporation
      Ltd., Madhubani.
                                                                  ... ... Appellant/s
                                         Versus
     Piyus Kumar Son of Sanjeev Kumar Singh, Resident of Sinhma, P.S
     Matihani, District Begusarai.
                                                               ... ... Respondent/s
     ======================================================
                                          with
                      COMMERCIAL APPEAL No. 14 of 2025
     ======================================================
1.    The Bihar State Food and Civil Supplies Corporation Ltd. Khadya Bhawan,
      5th Floor, Birchand Patel Path, Patna, at present Khadya Bhawan, R. Block,
      Patna.
2.   The Managing Director, The Bihar State Food and Civil Supplies
     Corporation Ltd., Khadya Bhawan, Daroga Prasad Path, R. Block, Rd. No.-
     2, Patna- 800001.
3.    The District Manager, The Bihar State Food and Civil Supplies Corporation,
      Madhubani, District- Madhubani.
                                                                ... ... Appellant/s
                                       Versus
     Piyush Kumar Son of Sanjeev Kumar Singh Resident of Sihma, P.S.-
     Matihani, District- Begusarai.
                                                             ... ... Respondent/s
     ======================================================
     Appearance :
     (In COMMERCIAL APPEAL No. 7 of 2025)
     For the Appellant/s  :Mr.Shailendra Kumar Singh, Adv.
     For the Respondent/s :Mr. Prashant Kumar, Adv.
                           Mr. Manish Prakash, Adv.
                           Mr. Kumar Anjaneya Shanu, Adv.
                           Mr. Rohit Raj, Adv.
     (In COMMERCIAL APPEAL No. 14 of 2025)
     For the Appellant/s  :Mr.Shailendra Kumar Singh, Adv.
     For the Respondent/s :Mr. Prashant Kumar, Adv.
                           Mr. Manish Prakash, Adv.
                           Mr. Kumar Anjaneya Shanu, Adv.
                           Mr. Rohit Raj, Adv.
                           Mr. Ranvir Pratap Singh, Adv.
     ======================================================
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                        2/119




       CORAM: HONOURABLE MR. JUSTICE MOHIT KUMAR SHAH
               and
               HONOURABLE MR. JUSTICE ARUN KUMAR JHA
                           CAV JUDGMENT
       (Per: HONOURABLE MR. JUSTICE MOHIT KUMAR SHAH)


         Date : 23-05-2026

        COMMERCIAL APPEAL No. 7 of 2025

        1.      The present appeal has been filed under Section 13 (1A)

        of the Commercial Courts Act, 2015 (herein after referred to as

        the “Act, 2015”) read with Section 37 of the Arbitration and

        Conciliation Act, 1996 (herein after referred to as the “Act,

        1996”) against the Judgment dated 25.07.2025, passed by the

        Ld. Court of Principal District Judge, Patna (herein after

        referred to as the “learned PDJ, Patna”) in Miscellaneous

        (Arbitration) Case No. 158 of 2020.

        Facts of the Case:

        2.      The genesis of the present appeal lies in an agreement

        executed in between the appellants and the claimant-Respondent

        herein dated 24.10.2016, pursuant to issuance of notice inviting

        tender from eligible candidates, for being appointed as

        transporting-cum-handling agent for a period of three years for

        the revenue District-Madhubani and acceptance of the tender

        submitted by the Respondent herein. The claimant-Respondent

        was entrusted with the work of transportation of food-grains and
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                        3/119




        other commodities including edible oil to the destinated

        godown, as directed by or on behalf of the appellants and

        according to the route chart fixed for the said purpose. The

        period of contract was for three years pertaining to the District-

        Madhubani. The claimant-Respondent is stated to have executed

        the work of transporting-cum-handling agent under the

        agreement and had submitted several bills in between the years

        2017 to 2019.

        3.      It appears that disputes had erupted in between the

        parties, leading to claims and counter claims being asserted as

        also leading to issuance of several show cause notices to the

        claimant-Respondent by the appellants, which were duly replied

        to by the claimant-Respondent. Ultimately, the District

        Manager, Bihar State Food and Civil Supplies Corporation Ltd.

        (hereinafter referred to as “the BSFC”), Madhubani issued a

        show cause notice dated 13.5.2019 to the claimant-Respondent,

        as to why appropriate proceedings for cancellation of agreement

        and blacklisting for five years be not taken in terms of Clause

        4(f) of the agreement, which was replied to by the Respondent.

        Thereafter, the District Transport Committee, Madhubani, vide

        minutes of meeting dated 21.5.2019 decided to blacklist the

        Respondent for a period of five years, forfeit the security
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                        4/119




        deposit, terminate the agreement and invoke the Bank

        guarantee. This led to issuance of a reasoned order dated

        23.05.2019, by which the claimant-Respondent was blacklisted

        for five years, the security deposit was forfeited, the agreement

        was terminated and the Bank guarantee was invoked. The said

        order dated 23.5.2019 was challenged by the claimant-

        Respondent by filing a writ petition bearing CWJC No. 12554

        of 2019. A Ld. Single Judge of this Court by a judgment dated

        21.08.2019 passed in CWJC No. 12554 of 2019 had quashed the

        order of blacklisting of the claimant-Respondent, however

        liberty was granted to the claimant-Respondent to seek his

        remedy against the order of termination, forfeiture of security

        deposit and invocation of Bank guarantee in a duly constituted

        arbitration proceedings or as may be advised in accordance with

        law.

        4.      The claimant-Respondent had then sent a notice to the

        appellants on 29.05.2019 for appointing an arbitrator suggesting

        three names, however the appellants did not respond to the said

        notice as also failed to appoint any arbitrator within a reasonable

        time, leading to filing of a request case bearing Request Case

        No. 66 of 2019 under Section 11(6) of the Act, 1996 by the

        claimant-Respondent, inter alia praying therein for appointment
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                        5/119




        of an independent and impartial arbitrator, in view of Clause 21

        of the agreement dated 24.10.2016. The Hon’ble Chief Justice

        of this Court by an order dated 06.09.2019, passed in Request

        Case No. 66 of 2019 and other analogous cases, in exercise of

        the powers U/s. 11(6) of the Act, 1996 had appointed Hon’ble

        Mr. Justice Sadananad Mukherjee, a retired Judge of the Patna

        High Court as the sole Arbitrator to enter upon the disputes and

        render his award in terms of the provisions of the Act, 1996.

        5.      The claimant-Respondent had then approached the Ld.

        Sole Arbitrator on 13.09.2019 with a copy of the aforesaid order

        dated 06.09.2019, passed in Request Case No. 66 of 2019 and

        other analogous cases, leading to registration of Arbitration

        Case No. 08 of 2019, whereafter the claimant-Respondent had

        filed a detailed statement of claim on 11.10.2019, raising a

        claim of a sum of Rs. 4,32,23,044.57.

        6.      The appellants had then filed statement of defence on

        13.1.2020, inter alia stating therein that the claimant-

        Respondent has submitted calculation chart at Annexure C-63,

        page No. 137 of the claim petition without any supporting

        documents and the admitted outstanding bills have already been

        paid long back apart from the fact that as per Clause 22 of the

        agreement, the claimant-Respondent is not entitled to claim any
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                        6/119




        compensation for detention of trucks at the godown gates or by

        law enforcing agencies during transit or at any other place. It

        was also averred that the claimant-Respondent has engaged in

        breach of the terms and conditions of the contract and he has

        already received all the admissible outstanding amount against

        the bills submitted by him, hence the claims raised by him is not

        admissible in the eyes of law.

        7.      The Respondent-claimant had then filed a rejoinder to the

        statement of defence on 11.2.2020, stating therein that in

        support of the statement of claim annexed at Annexure C-63,

        photo copies of several bills have been annexed as Annexure C-

        2 to C-35 to the statement of claim wherein each and every fact

        as well as supporting documents have been furnished in detail.

        The claimant-Respondent had also filed a supplementary

        statement of claim on 14.6.2020 wherein a sum of Rs.

        21,00,000/- was claimed as compensation on account of

        premature termination of contract, resulting in the claimant-

        Respondent being prevented from transporting food-grains for

        about seven months during the validity period of agreement,

        apart from claiming a sum of Rs. 1,50,000/- as travelling

        expenses for attending arbitral proceedings at Patna and a sum

        of Rs. 1,60,000/- on the head of fees of the Ld. Advocate. It is a
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                        7/119




        matter of record that no rebuttal was filed by the appellants to

        the supplementary statement of claim.

        8.      The learned Sole Arbitrator had thereafter, framed the

        following issues for consideration:-

                 “(i) Whether there is any cause of action for the present
                 proceeding.

                 (ii)   Whether the claim is barred by limitation.

                 (iii) Whether the claimant has committed breach of
                 contract in violation of conditions of agreement/contract.

                 (iv) Whether the deductions from several bills of the
                 petitioner/claimant by the respondents are valid and
                 justified even without giving any opportunity to show
                 cause in this regard.

                 (v)    Whether the petitioner/claimant is entitled to the
                 claims as per statement of claims, including the claim of
                 18 % interest per year on pending bills.

                 (vi) What relief or relief the petitioner is entitled?”

        9.      The Ld. Sole Arbitrator had finally passed the arbitral

        award on 17.10.2020, holding that the claimant-Respondent

        shall be entitled to the following award:-

                 “1. The claimant petitioner shall be paid an amount of
                 Rs. 2,67,37,638.62 paise (Two crore sixty-seven lakhs
                 thirty-seven thousand six hundred and thirty eighty) only
                 towards the claimed amount inclusive of security
                 amount.
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                        8/119




                 2. The claimant petitioner shall be entitled to
                 compensation amount of Rs. 45,00,000/- (Forty-five
                 lakhs) only under Section 54 of the Indian Contract Act.

                 3. The claimant petitioner shall be entitled to simple
                 interest @10% p.a. from 13.09.2019 till the date of
                 award and further 18% interest over awarded sum from
                 the date of award till realization over the awarded
                 amount.

                 4. The claimant petitioner shall be entitled to cost
                 towards fees and expenses of the Arbitrator and Courts
                 and other legal expenses.

                 5. Since the Arbitrator's fees has not been paid by the
                 respondent, the same shall be treated as 'unpaid cost' of
                 the Award, under Section 39 of the Arbitration and
                 Conciliation Act, 1996, and accordingly Arbitrator shall
                 have lien over the award, the respondent shall be liable
                 for making payment of the fees of the Arbitrator before
                 pursuing the matter before the Court.”

        10.     The Ld. Sole arbitrator by the aforesaid award dated

        17.10.2020 has though denied the claim of detention

        charges/bills being contrary to Clause 22 of the agreement but

        has not only awarded the aforesaid claim of Rs. 2,67,37,638.62/-

        but also compensation amount to the tune of Rs. 45,00,000/- and

        interest in favor of the claimant-Respondent.

        11.     The Ld. Sole Arbitrator had then by an order dated

        13.11.2020 indicated that at page no. 17, paragraph no. 1 of the
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                        9/119




        award dated 17.10.2020, there has been typographical error,

        inasmuch as the compensation amount has been typed as Rs.

        45,00,000/- instead of Rs. 25,00,000/- and since Section 33(3)

        of the Act, 1996 postulates that the arbitral tribunal may correct

        any error of the type referred to in Clause (a) of Sub-Section (1)

        on its own initiation, within 30 days from the date of arbitral

        award, the award portion at para-1 at page no. 17 and at para-1

        at page no. 18, wherever compensation amount of Rs.

        45,00,000/- has been mentioned, shall stand corrected and be

        read as a sum of Rs. 25,00,000/-

        12.     The aforesaid award dated 17.10.2020, passed by the

        learned Sole Arbitrator was challenged by the appellants before

        the learned Court of Principal District Judge, Patna by filing a

        petition on 24.12.2020 under Section 34 (2) & (2A) of the Act,

        1996, which was numbered as Miscellaneous (Arbitration) Case

        No. 158 of 2020 (arising out of award dated 17.10.2020 passed

        in Arbitration Case No. 8 of 2019). The grounds which can be

        culled out from the petition of the said Miscellaneous Case No.

        158 of 2020 are enumerated herein below:-

                (i) The Sole Arbitrator has passed the award only on the
                basis of calculation chart produced by the claimant-
                respondent without any supporting documents.
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       10/119




                (ii) The appellants had filed statement of defence before
                the learned Sole Arbitrator and prayed for directing the
                claimant-respondent to produce supporting documents
                against his claims as also examine witnesses but the
                learned Sole Arbitrator neither followed the provisions
                contained in the Act, 1996 nor examined the records/
                witnesses.

                (iii) The learned Sole Arbitrator failed to consider that
                several claims raised by the claimants are de hors the
                agreement.

                (iv) The learned Sole Arbitrator has awarded two
                penalties against the appellants i.e. compensation amount
                and interest on belated payment of the outstanding
                amount although the admitted claims of the claimant-
                respondent have already been paid by the appellants well
                within time.

                (v) The learned Sole Arbitrator failed to consider that the
                claimant-respondent had failed to adhere to the terms of
                the agreement regarding installing truck with GPS Load-
                Cells at the time of lifting food grains, hence appropriate
                deductions were made from the bills. The learned Sole
                Arbitrator failed to consider that the appellants had
                passed the admitted amount of bills of the claimant-
                Respondent, which he had received without any
                objection.

                (vi) The impugned award is against the provisions of the
                Act, 1996.

                (vii) The learned Sole Arbitrator was though appointed to
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       11/119




                consider the disputes arising out of the agreement in
                question, however he has considered several claims based
                on different contracts and agreements.

        13.     The claimant-respondent had filed a reply on 23.12.2021

        to the aforesaid Misc. Case No.158 of 2020, inter alia stating

        therein that the said petition filed by the appellants is not

        maintainable in view of the observations of the learned Sole

        Arbitrator to the effect that since the arbitration fees has not

        been paid by the appellants, same shall be treated as unpaid cost

        of the award under Section 39 of the Act, 1996 and accordingly,

        Arbitrator shall have lien over the award and the appellants shall

        be liable to make payment of the fees of the Arbitrator before

        pursuing the matter before the Court. The claimant-respondent

        had also raised an objection regarding the aforesaid petition

        filed by the appellants being in violation of the mandatory

        provisions contained under Section 34 (5) of the Act, 1996, as

        no prior notice was issued to the claimant-Respondent before

        filing of the said petition. The claimant-respondent had also

        raised the issue of jurisdiction inasmuch as the award under

        challenge being in respect of commercial dispute as defined

        under Section 2(1)(c)(xviii) of the Commercial Courts,

        Commercial Division and Commercial Appellate Division of the

        High Courts Act, 2015, the appellants were required to invoke
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       12/119




        the provisions of the Act, 2015, which has not been invoked,

        thus the learned Court is not vested with the jurisdiction to

        decide the case in hand. The claimant-respondent had refuted

        the contentions made by the appellants in the aforesaid Misc.

        (Arbitration) Case No. 158 of 2020 and had stated that in

        pursuance to the agreement dated 24.10.2016 executed in

        between the claimant-respondent and the appellants, the

        claimant-respondent had diligently completed the assignment as

        a Transporting-cum-Handling Agent within the framework of

        the agreement dated 24.10.2016 and in fact the calculation chart

        produced by the claimant-respondent with his claim petition is

        supported by month-wise bills of transport and handling charges

        as well as other relevant documents which were brought on

        record before the learned Sole Arbitrator along with the

        statement of claim filed by the claimant-respondent.

        14.     It has also been stated by the claimant-respondent in his

        reply that proper opportunity was provided to the appellants by

        the learned Sole Arbitrator to file relevant documents, however

        no documents were filed by the appellants. It has also been

        stated that as per Clause 12 A of the agreement, the appellants

        were under contractual obligation to make payments of the bills

        of the claimant-respondent herein within a period of 15 days of
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       13/119




        submission of bills, however none of the bills were paid within

        time by the appellants. It has also been stated that the appellants

        never received the bills with any objection. Nonetheless, huge

        deductions were made by the appellants from the bills without

        assigning any reason. It has also been stated that the appellants

        did not file any affidavit of admission/denial of documents of

        the claimant-respondent before the learned Sole Arbitrator,

        hence all the documents filed by the claimant-respondent would

        be deemed to have been accepted. It has further been stated that

        the claims have only been raised with regard to the district

        Madhubani for which the claimant-respondent was appointed as

        a Transporting-cum-Handing Agent vide agreement dated

        24.10.2016. Thus, it has been stated that the allegations

        regarding award of such amount which were not pertaining to

        the contract in question and were in connection with other

        districts is baseless. Lastly, it has been stated in the reply filed

        by the claimant-respondent that it is a well settled law, as held

        by the Hon’ble Supreme Court in a catena of cases that any

        error on the face of the award or in case there is any patent

        illegality then the same can be examined by the learned Court

        under Section 34 of the Act, 1996, however the facts/evidence

        cannot be re-appreciated by the learned Court at the appellate
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       14/119




        stage.

        15.      It may be pertinent to mention here that in paragraph

        No.17 of the reply filed by the claimant-respondent in Misc.

        (Arbitration) Case No. 158 of 2020, it has been specifically

        stated that claims have been raised only in connection with one

        revenue district for which the claimant was appointed as

        Transporting-cum-Handling            Agent       vide   agreement   dt.

        24.10.2016, hence any allegation by the appellants to the effect

        that claims over and above the agreement in question pertaining

        to other districts have been raised by the claimant-respondent is

        denied. At this juncture, it would be apt to reproduce paragraph

        No. 5 (v) of the supplementary reply filed by the claimant-

        Respondent herein below:-

                 “(v) For that the Hon’ble Sole Arbitrator has decided the
                 dispute within the scope of the agreement as disputes with
                 respect to only one agreement was adjudicated by the
                 Hon’ble Sole Arbitrator for which the Sole Arbitrator
                 was appointed but the plaintiff is trying to mislead this
                 Learned Court merely on the basis of the statement
                 without substantiating any documents in support of their
                 contention.”

        16.      The claimant-respondent, in his supplementary reply

        dated 14.02.2022, filed in the said Misc. (Arbitration) Case No.

        158 of 2020, inter alia stating therein that the statement of claim
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       15/119




        filed by the claimant-respondent before the learned Sole

        Arbitrator is duly supported by relevant documents which had

        already been submitted before the concerned officials of the

        appellants from time to time in accordance with the terms and

        conditions of the agreement. It has also been stated that interest

        was claimed on the ground of delay and for the same notice

        under Section 3 of the Interest Act was sent to the appellants

        with regard to each and every outstanding amount of bills and

        the same were also produced before the learned Sole Arbitrator.

        It has further been stated that the calculation chart produced by

        the claimant-respondent is duly supported by month-wise bill of

        transport and handling charges as well as other documents

        which were brought on record of the arbitral proceedings along

        with the statement of claim filed by the claimant-respondent and

        the monthly bills are contained in Annexures C-2 to C-35 of the

        statement of claim, thus the contention of the appellants that no

        proof/documents were produce is denied.

        17.     The learned court of PDJ, Patna by a judgment dated

        25.07.2025, passed in Miscellaneous (Arbitration) Case No.158

        of 2020, has been pleased to dismiss the said case holding that

        no valid ground has been made out under Section (2) or (2A) of

        Section 34 of the Arbitration and Conciliation Act, 1996 so as to
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       16/119




        warrant interference with the impugned arbitral award or the

        findings of the learned Sole Arbitrator. At this juncture, it would

        be relevant to enumerate in brief, the findings recorded by the

        learned PDJ, Patna in the aforesaid judgement dated 25.07.2025,

        herein below:-

                (i) The learned PDJ, Patna has held that since the Ld. Sole
                Arbitrator in his award dated 17.10.2020 has recorded
                that no breach of contractual obligation was committed
                by the claimant-respondent, rendering the deductions
                from the bills not justified, the learned Sole Arbitrator has
                rightly      adjudicated        that     the   deduction   of
                Rs.2,67,37,638.62/- was improper and unlawful, thus has
                justifiably awarded the said amount in favor of the
                claimant-respondent.

                (ii) As regards compensation amount of Rs. 45 lakhs (sic
                Rs. 25 lakhs) awarded by the learned Sole Arbitrator,
                considering the provisions contained under Section 54 of
                the Indian Contract Act, the learned PDJ, Patna has come
                to a finding that since the claimant-respondent ought not
                to have been subjected to loss arising from the default
                committed by the appellants and on account of delayed
                payments causing wrongful loss, as is reflected from the
                arbitral award, the appellants failed to perform their part
                of the agreement, hence they cannot claim the
                performance of reciprocal promise from the claimant-
                respondent, thus in view of the undue hardship and
                financial loss suffered due to delayed payment and
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       17/119




                defaults on the part of the appellants, the learned Sole
                Arbitrator      has    rightly     and       justifiably   awarded
                compensation of Rs.45 lakhs (sic Rs. 25 lakhs) in favour
                of the claimant-respondent.

                (iii) The learned PDJ, Patna has further held that it is well
                settled established legal principal that a Court, while
                adjudicating a petition under Section 34 of the Act, 1996
                is empowered to set aside an arbitral award where it is
                found to be devoid of reasoning, or where its outcome is
                so unjust and irrational as to shock the judicial conscience
                and similarly an award may be invalidated if it is based
                on evidence and resulting conclusions which no prudent
                or reasonable person could reasonably reach. The learned
                PDJ, Patna has also held that the Arbitrator remains the
                ultimate master of the quality and quantity of evidence
                and unless the Arbitrator’s approach is demonstrably
                arbitrary or capricious, the Court shall refrain from
                revisiting or re-evaluating factual determinations already
                placed on record.

                (iv) The learned PDJ has come to a finding that none of
                the grounds enumerated under sub-Sections (2) or (2A) of
                Section 34 of the Act, 1996 have been substantiated in the
                challenge to the arbitral award. It has also been held that
                it is a settled law that the proceedings instituted under
                Section 34 of the Act, 1996 do not partake the nature of
                an appeal or revision and the jurisdiction conferred upon
                the Court is inherently limited as also the Court is neither
                empowered to re-evaluate the findings and conclusions
                recorded in the award nor substitute its own views or
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       18/119




                effect any modification thereof and furthermore, the
                Court is also not required to delve into or adjudicate the
                merits of the award in a petition filed U/s. 34 of the Act,
                1996.

                (v) The learned PDJ, Patna has thus held that the learned
                Sole Arbitrator has justifiably rendered the arbitral award
                dated 17.10.2020, having duly considered and evaluated
                the evidentiary material placed on record and delivered a
                well-reasoned and a legally sound award.

                (vi) In conclusion, the learned PDJ, Patna has held that
                considering the materials on record, it is manifest that the
                appellants have failed to establish any of the ground
                enumerated under sub-Sections (2) or (2A) of Section 34
                of the Act, 1996, hence the circumscribed jurisdiction
                conferred under Section 34 of the Act, 1996 has not been
                satisfied in the present case so as to warrant setting aside
                of the impugned arbitral award. The learned PDJ, Patna
                has also held that the Ld. Sole Arbitrator has adjudicated
                the disputes strictly within the confines of the agreement
                executed between the parties and the documents placed
                on record in that regard as also the findings are clear and
                the rationale adopted by the learned Sole Arbitrator in
                arriving at the conclusion is sound, coherent and well-
                reasoned, hence the award cannot be regarded as patently
                illegal, perverse or contrary to the public policy of India.

        18.     The aforesaid judgment dated 25.07.2025 passed by the

        learned PDJ, Patna has been challenged in the present appeal.

        Submissions of the Ld. Counsel for the Appellants:
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       19/119




        19.     The learned counsel for the appellants has submitted that

        the Ld. Sole Arbitrator has passed the award dated 17.10.2020

        only on the basis of the calculation chart produced by the

        claimant-Respondent without any supporting documents and the

        Ld. Principal District Judge, Patna has similarly erred by not

        considering the said aspect of the matter. It has been stated that

        the claimant-Respondent has failed to produce any supporting

        documents against his claims like truck challan, store issue

        order etc., apart from the fact that the claimant-Respondent did

        not examine any witnesses in support of his claim. Thus, it has

        been submitted that the impugned judgment dated 25.7.2025,

        passed by the Ld. PDJ, Patna as also the arbitral award dated

        17.10.2020, passed by the Ld. Sole Arbitrator, as far as award of

        claim of a sum of Rs. 2,67,37,638.62/- to the claimant-

        Respondent is concerned, is perverse, patently illegal and

        beyond the parameters of the agreement entered into between

        the parties. It is also submitted that the learned Ld. PDJ, Patna

        had neither called for the arbitral records nor had examined the

        records and in an arbitrary manner, has upheld the arbitral award

        dated 17.10.2020 by the impugned judgment dated 25.7.2025.

        In fact, the Ld. PDJ, Patna failed to consider that all the

        admitted outstanding amount of bills/claims have been paid to
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                         20/119




        the claimant-Respondent and part admitted outstanding dues to

        the tune of Rs. 1,31,08,638/- (including the security deposit of

        Rs. 10,00,000/-) has been paid on 10.5.2023, however the same

        has not been accounted for in the impugned Judgment dt.

        25.7.2025.

        20.     The learned counsel for the appellants has further

        submitted that the Ld. Sole Arbitrator as also the Ld. PDJ Judge,

        Patna in the impugned arbitral award and judgment dated

        17.10.2020 and 25.7.2025 respectively, have failed to consider

        that several claims raised by the claimant-Respondent are de

        hors the agreement, apart from the fact that though there is no

        provision for payment of interest and grant of compensation in

        the agreement entered into between the parties, however both

        the Ld. Sole Arbitrator as also the Ld. PDJ, Patna have, in utter

        disregard to the provisions of the agreement allowed the claim

        of the claimant-Respondent pertaining to grant of interest and

        compensation. It is further submitted that the Ld. Sole Arbitrator

        has though been appointed to consider the disputes arising out

        of the agreement dated 24.10.2016 for the district-Madhubani,

        however he has considered and allowed several claims based on

        different     contract     and     agreement.        Thus,   in   nutshell,

        it is the contention of the learned counsel for the appellants that
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       21/119




        the impugned judgment dated 25.7.2025, passed by the Ld.

        Court of PDJ, Patna is in teeth of the mandate of the provisions

        contained under Section 34(2)(a), (b) and (2)(A) of the Act,

        1996.

        21.     The learned counsel for the appellants has referred to a

        judgment rendered by the Hon’ble Apex Court in the case of

        Gayatri Balasamy vs. ISG Novasoft Technologies Limited,

        reported in (2025) 7 SCC 1 to submit that Section 34 Court can

        apply the doctrine of severability and modify a portion of the

        award while retaining the rest, however the same is subject to

        parts of the award being separable, legally and practically. In

        fact, the Courts are empowered to modify the arbitral award

        under Section 34 and 37 of the Act, 1996, nonetheless the same

        is limited and can be exercised when the award is severable, by

        severing the “invalid” portion from the “valid” portion of the

        award      by     correcting     any     clerical,   computational   or

        typographical errors, which appear erroneous on the face of the

        record and post-award interest can also be modified in some

        circumstances as mentioned in the said judgment. Reference has

        also been made to a judgment rendered by the Hon’ble Apex

        Court in the case of North Delhi Municipal Corporation vs.

        S.A. Builders Limited, reported in (2025) 7 SCC 132 to submit
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       22/119




        that the arbitral tribunal does not have the power to award

        interest upon interest or compound interest either for the pre-

        award period or the post-award period.

        22.     The learned counsel for the appellants has also referred to

        a judgment rendered by the Hon’ble Apex Court in the case of

        Union of India vs. Ambica Construction, reported in (2016) 6

        SCC 36 to submit that reference has been made in the said

        judgment to a Constitution Bench judgment of the Hon’ble

        Apex Court, rendered in the case of Secretary, Irrigation

        Department, Government of Orissa & Ors. vs. GC Roy,

        reported in (1992) 1 SCC 508, wherein it has been held that if

        the arbitration agreement or the contract itself provides for

        interest, the arbitrator would have the jurisdiction to award

        interest, however where the agreement expressly provides that

        no interest pendente lite shall be payable on the amount due, the

        arbitrator has no power to award pendente lite interest. It would

        be apt to reproduce paragraph nos. 12, 14 and 34 of the said

        judgment, rendered in the case of Ambica Construction (supra),

        herein below:-

                “12. A Constitution Bench of this Court in G.C. Roy
                [Irrigation Deptt., State of Orissa v. G.C. Roy, (1992) 1
                SCC 508] has considered the question of power of the
                arbitrator to award pendente lite interest and it has been
                laid down that if the arbitration agreement or the
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       23/119




                contract itself provides for interest, the arbitrator would
                have the jurisdiction to award the interest. Similarly,
                where the agreement expressly provides that no interest
                pendente lite shall be payable on the amount due, the
                arbitrator has no power to award pendente lite interest.
                In G.C. Roy [Irrigation Deptt., State of Orissa v. G.C.
                Roy, (1992) 1 SCC 508] this Court has held thus : (SCC
                p. 514, para 7)
                  “7. … If the arbitration agreement or the contract itself
                  provides for award of interest on the amount found due
                  from one party to the other, no question regarding the
                  absence of arbitrator's jurisdiction to award the
                  interest could arise as in that case the arbitrator has
                  power to award interest pendente lite as well. Similarly,
                  where the agreement expressly provides that no interest
                  pendente lite shall be payable on the amount due, the
                  arbitrator has no power to award pendente lite interest.
                  But where the agreement does not provide either for
                  grant or denial of interest on the amount found due, the
                  question arises whether in such an event the arbitrator
                  has power and authority to grant pendente lite interest.
                 14. Ultimately, in G.C. Roy [Irrigation Deptt., State of
                 Orissa v. G.C. Roy, (1992) 1 SCC 508] , this Court has
                 answered the question whether the arbitrator has the
                 power to award interest pendente lite. Their Lordships
                 have reiterated that they have dealt with the situation
                 where the agreement does not provide for grant of such
                 interest nor does it prohibit such grant when the
                 agreement is silent as to award of interest. This Court
                 has laid down various principles in paras 43-44 of the
                 Report thus : (SCC pp. 532-34)
                    “43. The question still remains whether arbitrator has
                    the power to award interest pendente lite, and if so, on
                    what principle. We must reiterate that we are dealing
                    with the situation where the agreement does not
                    provide for grant of such interest nor does it prohibit
                    such grant. In other words, we are dealing with a case
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       24/119




                    where the agreement is silent as to award of interest.
                    On a conspectus of the aforementioned decisions, the
                    following principles emerge:
                    (i) A person deprived of the use of money to which he
                    is legitimately entitled has a right to be compensated
                    for the deprivation, call it by any name. It may be
                    called interest, compensation or damages. This basic
                    consideration is as valid for the period the dispute is
                    pending before the arbitrator as it is for the period
                    prior to the arbitrator entering upon the reference.
                    This is the principle of Section 34 of the Civil
                    Procedure Code and there is no reason or principle to
                    hold otherwise in the case of arbitrator.
                    (ii) An arbitrator is an alternative form (sic forum) for
                    resolution of disputes arising between the parties. If
                    so, he must have the power to decide all the disputes
                    or differences arising between the parties. If the
                    arbitrator has no power to award interest pendente
                    lite, the party claiming it would have to approach the
                    court for that purpose, even though he may have
                    obtained satisfaction in respect of other claims from
                    the arbitrator. This would lead to multiplicity of
                    proceedings.
                    (iii) An arbitrator is the creature of an agreement. It is
                    open to the parties to confer upon him such powers
                    and prescribe such procedure for him to follow, as
                    they think fit, so long as they are not opposed to law.
                    (The proviso to Section 41 and Section 3 of the
                    Arbitration Act illustrate this point). All the same, the
                    agreement must be in conformity with law. The
                    arbitrator must also act and make his award in
                    accordance with the general law of the land and the
                    agreement.
                    (iv) Over the years, the English and Indian courts
                    have acted on the assumption that where the
                    agreement does not prohibit and a party to the
                    reference makes a claim for interest, the arbitrator
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       25/119




                    must have the power to award interest pendente lite.
                    Thawardas Pherumal v. Union of India [Thawardas
                    Pherumal v. Union of India, AIR 1955 SC 468] has not
                    been followed in the later decisions of this Court. It
                    has been explained and distinguished on the basis that
                    in that case there was no claim for interest but only a
                    claim for unliquidated damages. It has been said
                    repeatedly that observations in the said judgment were
                    not intended to lay down any such absolute or
                    universal rule as they appear to, on first impression.
                    Until Deptt. of Irrigation v. Abhaduta Jena [Deptt. of
                    Irrigation v. Abhaduta Jena, (1988) 1 SCC 418]
                    almost all the courts in the country had upheld the
                    power of the arbitrator to award interest pendente lite.
                    Continuity and certainty is a highly desirable feature
                    of law.
                    (v) Interest pendente lite is not a matter of substantive
                    law, like interest for the period anterior to reference
                    (pre-reference period). For doing complete justice
                    between the parties, such power has always been
                    inferred.
                    44. Having regard to the above consideration, we
                    think that the following is the correct principle which
                    should be followed in this behalf:
                  Where the agreement between the parties does not
                  prohibit grant of interest and where a party claims
                  interest and that dispute (along with the claim for
                  principal amount or independently) is referred to the
                  arbitrator, he shall have the power to award interest
                  pendente lite. This is for the reason that in such a case
                  it must be presumed that interest was an implied term
                  of the agreement between the parties and therefore
                  when the parties refer all their disputes—or refer the
                  dispute as to interest as such—to the arbitrator, he
                  shall have the power to award interest. This does not
                  mean that in every case the arbitrator should
                  necessarily award interest pendente lite. It is a matter
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       26/119




                  within his discretion to be exercised in the light of all
                  the facts and circumstances of the case, keeping the
                  ends of justice in view.”
                                                             (emphasis in original)
                 The Constitution Bench of this Court has laid down that
                 where the agreement between the parties does not
                 prohibit grant of interest and where the party claims
                 interest and that dispute is referred to the arbitrator, he
                 shall have the power to award interest pendente lite. The
                 law declared has been held applicable prospectively.
                 34. Thus, our answer to the reference is that if the
                 contract expressly bars the award of interest pendente
                 lite, the same cannot be awarded by the arbitrator. We
                 also make it clear that the bar to award interest on
                 delayed payment by itself will not be readily inferred as
                 express bar to award interest pendente lite by the
                 Arbitral Tribunal, as ouster of power of the arbitrator
                 has to be considered on various relevant aspects referred
                 to in the decisions of this Court, it would be for the
                 Division Bench to consider the case on merits.”
        23.     The learned counsel for the appellants has next referred to

        a judgment rendered by the Hon’ble Apex Court in the case of

        Oil & Natural Gas Corporation Ltd. vs. Saw Pipes Ltd.,

        reported in (2003) 5 SCC 705, paragraphs no. 13, 15 to 22 and

        31 whereof are reproduced herein below:-

               “13. The question, therefore, which requires
               consideration is — whether the award could be set aside,
               if the Arbitral Tribunal has not followed the mandatory
               procedure prescribed under Sections 24, 28 or 31(3),
               which affects the rights of the parties. Under sub-section
               (1)(a) of Section 28 there is a mandate to the Arbitral
               Tribunal to decide the dispute in accordance with the
               substantive law for the time being in force in India.
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       27/119




               Admittedly, substantive law would include the Indian
               Contract Act, the Transfer of Property Act and other such
               laws in force. Suppose, if the award is passed in violation
               of the provisions of the Transfer of Property Act or in
               violation of the Indian Contract Act, the question would
               be — whether such award could be set aside. Similarly,
               under sub-section (3), the Arbitral Tribunal is directed to
               decide the dispute in accordance with the terms of the
               contract and also after taking into account the usage of
               the trade applicable to the transaction. If the Arbitral
               Tribunal ignores the terms of the contract or usage of the
               trade applicable to the transaction, whether the said
               award could be interfered. Similarly, if the award is a
               non-speaking one and is in violation of Section 31(3), can
               such award be set aside? In our view, reading Section 34
               conjointly with other provisions of the Act, it appears that
               the legislative intent could not be that if the award is in
               contravention of the provisions of the Act, still however, it
               couldn't be set aside by the court. If it is held that such
               award could not be interfered, it would be contrary to the
               basic concept of justice. If the Arbitral Tribunal has not
               followed the mandatory procedure prescribed under the
               Act, it would mean that it has acted beyond its jurisdiction
               and thereby the award would be patently illegal which
               could be set aside under Section 34.
               15. The result is — if the award is contrary to the
               substantive provisions of law or the provisions of the Act
               or against the terms of the contract, it would be patently
               illegal, which could be interfered under Section 34.
               However, such failure of procedure should be patent
               affecting the rights of the parties.
               16. The next clause which requires interpretation is clause
               (ii) of sub-section (2)(b) of Section 34 which inter alia
               provides that the court may set aside the arbitral award if
               it is in conflict with the “public policy of India”. The
               phrase “public policy of India” is not defined under the
               Act. Hence, the said term is required to be given meaning
               in context and also considering the purpose of the section
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       28/119




               and scheme of the Act. It has been repeatedly stated by
               various authorities that the expression “public policy”
               does not admit of precise definition and may vary from
               generation to generation and from time to time. Hence,
               the concept “public policy” is considered to be vague,
               susceptible to narrow or wider meaning depending upon
               the context in which it is used. Lacking precedent, the
               court has to give its meaning in the light and principles
               underlying the Arbitration Act, Contract Act and
               constitutional provisions.
               17. For this purpose, we would refer to a few decisions
               referred to by the learned counsel for the parties. While
               dealing with the concept of public policy, this Court in
               Central Inland Water Transport Corpn. Ltd. v. Brojo Nath
               Ganguly [(1986) 3 SCC 156] has observed thus: (SCC
               pp. 217-19, paras 92-93)
                  “92. The Indian Contract Act does not define the
                  expression ‘public policy’ or ‘opposed to public policy’.
                  From the very nature of things, the expressions ‘public
                  policy’, ‘opposed to public policy’, or ‘contrary to
                  public policy’ are incapable of precise definition.
                  Public policy, however, is not the policy of a particular
                  Government. It connotes some matter which concerns
                  the public good and the public interest. The concept of
                  what is for the public good or in the public interest or
                  what would be injurious or harmful to the public good
                  or the public interest has varied from time to time. As
                  new concepts take the place of old, transactions which
                  were once considered against public policy are now
                  being upheld by the courts and similarly where there
                  has been a well-recognized head of public policy, the
                  courts have not shirked from extending it to new
                  transactions and changed circumstances and have at
                  times not even flinched from inventing a new head of
                  public policy. There are two schools of thought — ‘the
                  narrow view’ school and ‘the broad view’ school.
                  According to the former, courts cannot create new
                  heads of public policy whereas the latter countenances
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       29/119




                  judicial law-making in this area. The adherents of ‘the
                  narrow view’ school would not invalidate a contract on
                  the ground of public policy unless that particular
                  ground had been well established by authorities.
                  Hardly ever has the voice of the timorous spoken more
                  clearly and loudly than in these words of Lord Davey in
                  Janson v. Driefontein Consolidated Gold Mines Ltd.
                  [1902 AC 484, 500: (1900-03) All ER Rep 426 : 87 LT
                  372 (HL)]: ‘Public policy is always an unsafe and
                  treacherous ground for legal decision.’ That was in the
                  year 1902. Seventy-eight years earlier, Burrough, J., in
                  Richardson v. Mellish [(1824) 2 Bing 229, 252 : 130
                  ER 294] described public policy as ‘a very unruly
                  horse, and when once you get astride it you never know
                  where it will carry you’. The Master of the Rolls, Lord
                  Denning, however, was not a man to shy away from
                  unmanageable horses and in words which conjure up
                  before our eyes the picture of the young Alexander the
                  Great taming Bucephalus, he said in Enderby Town
                  Football Club Ltd. v. Football Assn. Ltd. [1971 Ch 591,
                  606] : ‘With a good man in the saddle, the unruly horse
                  can be kept in control. It can jump over obstacles’. Had
                  the timorous always held the field, not only the doctrine
                  of public policy but even the common law or the
                  principles of equity would never have evolved. Sir
                  William Holdsworth in his ‘History of English Law’,
                  Vol. III, p. 55, has said:
                  ‘In fact, a body of law like the common law, which has
                  grown up gradually with the growth of the nation,
                  necessarily acquires some fixed principles, and if it is
                  to maintain these principles it must be able, on the
                  ground of public policy or some other like ground, to
                  suppress practices which, under ever new disguises,
                  seek to weaken or negative them.’
                  It is thus clear that the principles governing public
                  policy must be and are capable, on proper occasion, of
                  expansion or modification. Practices which were
                  considered perfectly normal at one time have today
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       30/119




                  become obnoxious and oppressive to public conscience.
                  If there is no head of public policy which covers a case,
                  then the court must in consonance with public
                  conscience and in keeping with public good and public
                  interest declare such practice to be opposed to public
                  policy. Above all, in deciding any case which may not
                  be covered by authority our courts have before them
                  the beacon light of the preamble to the Constitution.
                  Lacking precedent, the court can always be guided by
                  that light and the principles underlying the
                  fundamental rights and the directive principles
                  enshrined in our Constitution.
                  93. The normal rule of common law has been that a
                  party who seeks to enforce an agreement which is
                  opposed to public policy will be non-suited. The case of
                  A. Schroeder Music Publishing Co. Ltd. v. Macaulay
                  [(1974) 1 WLR 1308 : (1974) 3 All ER 616 (HL)],
                  however, establishes that where a contract is vitiated as
                  being contrary to public policy, the party adversely
                  affected by it can sue to have it declared void. The case
                  may be different where the purpose of the contract is
                  illegal or immoral. In Kedar Nath Motani v. Prahlad
                  Rai [AIR 1960 SC 213 : (1960) 1 SCR 861], reversing
                  the High Court and restoring the decree passed by the
                  trial court declaring the appellants' title to the lands in
                  suit and directing the respondents who were the
                  appellants' benamidars to restore possession, this
                  Court, after discussing the English and Indian law on
                  the subject, said (at p. 873):
                  ‘The correct position in law, in our opinion, is that
                  what one has to see is whether the illegality goes so
                  much to the root of the matter that the plaintiff cannot
                  bring his action without relying upon the illegal
                  transaction into which he had entered. If the illegality
                  be trivial or venial, as stated by Williston and the
                  plaintiff is not required to rest his case upon that
                  illegality, then public policy demands that the
                  defendant should not be allowed to take advantage of
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       31/119




                  the position. A strict view, of course, must be taken of
                  the plaintiff's conduct, and he should not be allowed to
                  circumvent the illegality by resorting to some
                  subterfuge or by misstating the facts. If, however, the
                  matter is clear and the illegality is not required to be
                  pleaded or proved as part of the cause of action and
                  the plaintiff recanted before the illegal purpose was
                  achieved, then, unless it be of such a gross nature as to
                  outrage the conscience of the court, the plea of the
                  defendant should not prevail.’
                  The types of contracts to which the principle
                  formulated by us above applies are not contracts which
                  are tainted with illegality but are contracts which
                  contain terms which are so unfair and unreasonable
                  that they shock the conscience of the court. They are
                  opposed to public policy and require to be adjudged
                  void.”
                                                             (emphasis supplied)
               18. Further, in Renusagar Power Co. Ltd. v. General
               Electric Co. [1994 Supp (1) SCC 644] this Court
               considered Section 7(1) of the Arbitration (Protocol and
               Convention) Act, 1937 which inter alia provided that a
               foreign award may not be enforced under the said Act, if
               the court dealing with the case is satisfied that the
               enforcement of the award will be contrary to the public
               policy. After elaborate discussion, the Court arrived at the
               conclusion that public policy comprehended in Section
               7(1)(b)(ii) of the Foreign Awards (Recognition and
               Enforcement) Act, 1961 is the “public policy of India”
               and does not cover the public policy of any other country.
               For giving meaning to the term “public policy”, the
               Court observed thus: (SCC p. 682, para 66)
                  “66. Article V(2)(b) of the New York Convention of
                  1958 and Section 7(1)(b)(ii) of the Foreign Awards Act
                  do not postulate refusal of recognition and enforcement
                  of a foreign award on the ground that it is contrary to
                  the law of the country of enforcement and the ground of
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       32/119




                  challenge is confined to the recognition and
                  enforcement being contrary to the public policy of the
                  country in which the award is set to be enforced. There
                  is nothing to indicate that the expression ‘public policy’
                  in Article V(2)(b) of the New York Convention and
                  Section 7(1)(b)(ii) of the Foreign Awards Act is not
                  used in the same sense in which it was used in Article
                  I(c) of the Geneva Convention of 1927 and Section 7(1)
                  of the Protocol and Convention Act of 1937. This would
                  mean that ‘public policy’ in Section 7(1)(b)(ii) has been
                  used in a narrower sense and in order to attract the bar
                  of public policy the enforcement of the award must
                  invoke something more than the violation of the law of
                  India. Since the Foreign Awards Act is concerned with
                  recognition and enforcement of foreign awards which
                  are governed by the principles of private international
                  law, the expression ‘public policy’ in Section 7(1)(b)(ii)
                  of the Foreign Awards Act must necessarily be
                  construed in the sense the doctrine of public policy is
                  applied in the field of private international law.
                  Applying the said criteria it must be held that the
                  enforcement of a foreign award would be refused on the
                  ground that it is contrary to public policy if such
                  enforcement would be contrary to (i) fundamental
                  policy of Indian law; or (ii) the interests of India; or
                  (iii) justice or morality.”
                                                             (emphasis supplied)
                         The Court finally held that: (SCC p. 685, para 76)
                  “76. Keeping in view the aforesaid objects underlying
                  FERA and the principles governing enforcement of
                  exchange control laws followed in other countries, we
                  are of the view that the provisions contained in FERA
                  have been enacted to safeguard the economic interests
                  of India and any violation of the said provisions would
                  be contrary to the public policy of India as envisaged
                  in Section 7(1)(b)(ii) of the Act.”
               19. This Court in Murlidhar Aggarwal v. State of U.P.
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       33/119




               [(1974) 2 SCC 472] while dealing with the concept of
               “public policy” observed thus: (SCC pp. 482-83, paras
               31-32)
                  “31. Public policy does not remain static in any given
                  community. It may vary from generation to generation
                  and even in the same generation. Public policy would
                  be almost useless if it were to remain in fixed moulds
                  for all time.
                  32. … The difficulty of discovering what public policy
                  is at any given moment certainly does not absolve the
                  Judges from the duty of doing so. In conducting an
                  enquiry, as already stated, Judges are not hidebound by
                  precedent. The Judges must look beyond the narrow
                  field of past precedents, though this still leaves open
                  the question, in which direction they must cast their
                  gaze. The Judges are to base their decisions on the
                  opinions of men of the world, as distinguished from
                  opinions based on legal learning. In other words, the
                  Judges will have to look beyond the jurisprudence and
                  that in so doing, they must consult not their own
                  personal standards or predilections but those of the
                  dominant opinion at a given moment, or what has been
                  termed customary morality. The Judges must consider
                  the social consequences of the rule propounded,
                  especially in the light of the factual evidence available
                  as to its probable results. … The point is rather that
                  this power must be lodged somewhere and under our
                  Constitution and laws, it has been lodged in the Judges
                  and if they have to fulfil their function as Judges, it
                  could hardly be lodged elsewhere.”
                                                             (emphasis supplied)
               20. Mr Desai submitted that the narrow meaning given to
               the term “public policy” in Renusagar case [1994 Supp
               (1) SCC 644] is in context of the fact that the question
               involved in the said matter was with regard to the
               execution of the award which had attained finality. It was
               not a case where validity of the award is challenged
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       34/119




               before a forum prescribed under the Act. He submitted
               that the scheme of Section 34 which deals with setting
               aside the domestic arbitral award and Section 48 which
               deals with enforcement of foreign award are not identical.
               A foreign award by definition is subject to double
               exequatur. This is recognized inter alia by Section 48(1)
               and there is no parallel provision to this clause in Section
               34. For this, he referred to Lord Mustill & Stewart C.
               Boyd, Q.C.'s Commercial Arbitration 2001 wherein (at p.
               90) it is stated as under:
                  “Mutual recognition of awards is the glue which holds
                  the international arbitrating community together, and
                  this will only be strong if the enforcing court is willing
                  to trust, as the convention assumes that they will trust
                  the supervising authorities of the chosen venue. It
                  follows that if, and to the extent that the award has
                  been struck down in the local court it should as a
                  matter of theory and practice be treated when
                  enforcement is sought as if to the extent it did not
                  exist.”
               21. He further submitted that in foreign arbitration, the
               award would be subject to being set aside or suspended
               by the competent authority under the relevant law of that
               country whereas in the domestic arbitration the only
               recourse is to Section 34.
               22. The aforesaid submission of the learned Senior
               Counsel requires to be accepted. From the judgments
               discussed above, it can be held that the term “public
               policy of India” is required to be interpreted in the
               context of the jurisdiction of the court where the validity
               of award is challenged before it becomes final and
               executable. The concept of enforcement of the award after
               it becomes final is different and the jurisdiction of the
               court at that stage could be limited. Similar is the position
               with regard to the execution of a decree. It is settled law
               as well as it is provided under the Code of Civil
               Procedure that once the decree has attained finality, in an
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       35/119




               execution proceeding, it may be challenged only on
               limited grounds such as the decree being without
               jurisdiction or a nullity. But in a case where the judgment
               and decree is challenged before the appellate court or the
               court exercising revisional jurisdiction, the jurisdiction of
               such court would be wider. Therefore, in a case where the
               validity of award is challenged, there is no necessity of
               giving a narrower meaning to the term “public policy of
               India”. On the contrary, wider meaning is required to be
               given so that the “patently illegal award” passed by the
               Arbitral Tribunal could be set aside. If narrow meaning
               as contended by the learned Senior Counsel Mr Dave is
               given, some of the provisions of the Arbitration Act would
               become nugatory. Take for illustration a case wherein
               there is a specific provision in the contract that for
               delayed payment of the amount due and payable, no
               interest would be payable, still however, if the arbitrator
               has passed an award granting interest, it would be
               against the terms of the contract and thereby against the
               provision of Section 28(3) of the Act which specifically
               provides that “Arbitral Tribunal shall decide in
               accordance with the terms of the contract”. Further,
               where there is a specific usage of the trade that if the
               payment is made beyond a period of one month, then the
               party would be required to pay the said amount with
               interest at the rate of 15 per cent. Despite the evidence
               being produced on record for such usage, if the arbitrator
               refuses to grant such interest on the ground of equity, such
               award would also be in violation of sub-sections (2) and
               (3) of Section 28. Section 28(2) specifically provides that
               the arbitrator shall decide ex aequo et bono (according to
               what is just and good) only if the parties have expressly
               authorised him to do so. Similarly, if the award is patently
               against the statutory provisions of substantive law which
               is in force in India or is passed without giving an
               opportunity of hearing to the parties as provided under
               Section 24 or without giving any reason in a case where
               parties have not agreed that no reasons are to be
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       36/119




               recorded, it would be against the statutory provisions. In
               all such cases, the award is required to be set aside on the
               ground of “patent illegality”.
               31. Therefore, in our view, the phrase “public policy of
               India” used in Section 34 in context is required to be
               given a wider meaning. It can be stated that the concept
               of public policy connotes some matter which concerns
               public good and the public interest. What is for public
               good or in public interest or what would be injurious or
               harmful to the public good or public interest has varied
               from time to time. However, the award which is, on the
               face of it, patently in violation of statutory provisions
               cannot be said to be in public interest. Such
               award/judgment/decision is likely to adversely affect the
               administration of justice. Hence, in our view in addition
               to narrower meaning given to the term “public policy” in
               Renusagar case [1994 Supp (1) SCC 644] it is required to
               be held that the award could be set aside if it is patently
               illegal. The result would be — award could be set aside if
               it is contrary to:
                  (a) fundamental policy of Indian law; or
                  (b) the interest of India; or
                  (c) justice or morality, or
                  (d) in addition, if it is patently illegal.
               Illegality must go to the root of the matter and if the
               illegality is of trivial nature it cannot be held that award
               is against the public policy. Award could also be set aside
               if it is so unfair and unreasonable that it shocks the
               conscience of the court. Such award is opposed to public
               policy and is required to be adjudged void.”
        24.     Thus, it is submitted by the learned counsel for the

        appellants by relying on the aforesaid judgment rendered by the

        Hon’ble Apex Court in the case of Saw Pipes Ltd. (supra) that

        the arbitral award dated 17.10.2020, passed by the Ld. Sole
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       37/119




        Arbitrator is patently illegal, hence is fit to be set aside and this

        Court is fully empowered to do so by virtue of the provisions

        contained under Section 37 of the Act, 1996.

        25.     The Ld. counsel for the appellants has lastly submitted,

        by referring to Clause 22 of the agreement dated 24.10.2016 that

        the claimant-Respondent is not entitled to any compensation for

        detention of their trucks and in fact the Ld. Sole Arbitrator, in

        the arbitral award dated 17.10.2020, at internal page no. 15 has

        also held, while referring to the said Clause 22 of the agreement

        dated 24.10.2016 that the detention charges shall not be payable

        to the claimant and the detention bills shall stand deducted from

        various bills, nonetheless the amount awarded in favor of the

        claimant-Respondent to the tune of Rs. 2,67,37,638.62 also

        contain detention charges, which is an error apparent on the face

        of the records.

        Submissions of the Ld. Counsel for the claimant-
        Respondent:

        26.     Per contra, the Ld. counsel for the claimant-Respondent

        has submitted that it is wrong to say that no supporting

        documents were annexed by the claimant-Respondent in his

        claim petition filed before the Ld. Sole Arbitrator in support of

        his claims, inasmuch as the bills for various months have been
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       38/119




        annexed as Annexure C-2 to C-35, wherein each and every fact

        as well as supporting documents have been furnished in detail,

        duly supported by month wise bills of transport and handling

        charges as well as other relevant documents, however the

        appellants did not file any affidavit/annexures/denial of

        documents of the claimant-Respondent before the Ld. Sole

        Arbitrator, hence all the documents filed by the claimant-

        Respondent would be deemed to have been accepted. Thus, it is

        submitted that the claim of a sum of Rs. 2,67,37,638.62 awarded

        by the Ld. Sole Arbitrator, vide award dt. 17.10.2020 is not only

        supported by bills / documents but also justified, which have not

        been denied by the appellants, hence no interference is required.

        27.     The learned counsel for the claimant-Respondent has

        further submitted that all the claims have been awarded within

        the ambit of the agreement in question i.e. the one dated

        24.10.2016, pertaining to the district-Madhubani. It is also

        submitted that there is no bar under the agreement to award

        interest and compensation, hence the arbitral award dated

        17.10.2020 as upheld by the judgment dated 25.7.2025, passed

        by the Ld. Court of PDJ, Patna under Section 34 of the Act,

        1996 does not suffer from any infirmity.

        28.     The learned counsel for the claimant-Respondent has next
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       39/119




        submitted that Section 34 of the Act, 1996 provides for certain

        grounds on which the competent Court can interfere with the

        arbitral award, however no interference is permissible if the

        grounds urged for setting aside of arbitral award is not within

        the contours of Section 34 of the Act, 1996. Reference has also

        been made to Section 5 of the Act, 1996 to submit that an

        arbitration award, which is governed by Part-I of the Act, 1996

        can only be set aside on the grounds mentioned under Section

        34 (2) and (3) and not otherwise. The Ld. Counsel has referred

        to a judgment rendered by the Hon’ble Apex Court in the case

        of Associate Builders vs. Delhi Development Authority,

        reported in (2015) 3 SCC 49, paragraphs no. 33, 34, 52 and 56

        whereof are reproduced herein below:-

                 “33. It must clearly be understood that when a court is
                 applying the “public policy” test to an arbitration
                 award, it does not act as a court of appeal and
                 consequently errors of fact cannot be corrected. A
                 possible view by the arbitrator on facts has necessarily
                 to pass muster as the arbitrator is the ultimate master of
                 the quantity and quality of evidence to be relied upon
                 when he delivers his arbitral award. Thus an award
                 based on little evidence or on evidence which does not
                 measure up in quality to a trained legal mind would not
                 be held to be invalid on this score [Very often an
                 arbitrator is a lay person not necessarily trained in law.
                 Lord Mansfield, a famous English Judge, once advised a
                 high military officer in Jamaica who needed to act as a
                 Judge as follows:
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       40/119




                  “General, you have a sound head, and a good heart;
                  take courage and you will do very well, in your
                  occupation, in a court of equity. My advice is, to make
                  your decrees as your head and your heart dictate, to
                  hear both sides patiently, to decide with firmness in the
                  best manner you can; but be careful not to assign your
                  reasons, since your determination may be substantially
                  right, although your reasons may be very bad, or
                  essentially wrong”.
                 It is very important to bear this in mind when awards of
                 lay arbitrators are challenged.]. Once it is found that the
                 arbitrators approach is not arbitrary or capricious, then
                 he is the last word on facts. In P.R. Shah, Shares & Stock
                 Brokers (P) Ltd. v. B.H.H. Securities (P) Ltd. [(2012) 1
                 SCC 594], this Court held : (SCC pp. 601-02, para 21)
                  “21. A court does not sit in appeal over the award of an
                  Arbitral Tribunal by reassessing or reappreciating the
                  evidence. An award can be challenged only under the
                  grounds mentioned in Section 34(2) of the Act. The
                  Arbitral Tribunal has examined the facts and held that
                  both the second respondent and the appellant are
                  liable. The case as put forward by the first respondent
                  has been accepted. Even the minority view was that the
                  second respondent was liable as claimed by the first
                  respondent, but the appellant was not liable only on the
                  ground that the arbitrators appointed by the Stock
                  Exchange under Bye-law 248, in a claim against a non-
                  member, had no jurisdiction to decide a claim against
                  another member. The finding of the majority is that the
                  appellant did the transaction in the name of the second
                  respondent and is therefore, liable along with the
                  second respondent. Therefore, in the absence of any
                  ground under Section 34(2) of the Act, it is not possible
                  to re-examine the facts to find out whether a different
                  decision can be arrived at.”
                 34. It is with this very important caveat that the two
                 fundamental principles which form part of the
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       41/119




                 fundamental policy of Indian law (that the arbitrator
                 must have a judicial approach and that he must not act
                 perversely) are to be understood.
                 52. It is most unfortunate that the Division Bench did not
                 advert to this crucial document at all. This document
                 shows not only that the Division Bench was wholly
                 incorrect in its conclusion that the contractor has tried
                 to pull the wool over the eyes over the DDA but it should
                 also have realised that the DDA itself has stated that the
                 work has been carried out generally to its satisfaction
                 barring some extremely minor defects which are capable
                 of rectification. It is clear, therefore, that the Division
                 Bench obviously exceeded its jurisdiction in interfering
                 with a pure finding of fact forgetting that the arbitrator
                 is the sole Judge of the quantity and quality of evidence
                 before him and unnecessarily bringing in facts which
                 were neither pleaded nor proved and ignoring the vital
                 completion certificate granted by the DDA itself. The
                 Division Bench also went wrong in stating that as the
                 work completed was only to the extent of Rs 62,84,845,
                 Hudson's formula should have been applied taking this
                 figure into account and not the entire contract value of
                 Rs 87,66,678 into account.
                 56. Here again, the Division Bench has interfered
                 wrongly with the arbitral award on several counts. It had
                 no business to enter into a pure question of fact to set
                 aside the arbitrator for having applied a formula of 20
                 months instead of 25 months. Though this would inure in
                 favour of the appellant, it is clear that the appellant did
                 not file any cross-objection on this score. Also, it is
                 extremely curious that the Division Bench found that an
                 adjustment would have to be made with claims awarded
                 under Claims 2, 3 and 4 which are entirely separate and
                 independent claims and have nothing to do with Claims
                 12 and 13. The formula then applied by the Division
                 Bench was that it would itself do “rough and ready
                 justice”. We are at a complete loss to understand how
                 this can be done by any court under the jurisdiction
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       42/119




                 exercised under Section 34 of the Arbitration Act. As has
                 been held above, the expression “justice” when it comes
                 to setting aside an award under the public policy ground
                 can only mean that an award shocks the conscience of
                 the court. It cannot possibly include what the court
                 thinks is unjust on the facts of a case for which it then
                 seeks to substitute its view for the arbitrator's view and
                 does what it considers to be “justice”. With great respect
                 to the Division Bench, the whole approach to setting
                 aside arbitral awards is incorrect. The Division Bench
                 has lost sight of the fact that it is not a first appellate
                 court and cannot interfere with errors of fact.”
        29.     The learned counsel for the claimant-Respondent has

        further submitted that it is a settled position of law that the

        grounds for interference with the arbitral award under Section

        37 of the Act, 1996 is narrower than those under Section 34 of

        the Act, 1996, hence if an arbitral award has been upheld in

        challenge under Section 34 of the Act, 1996, then the same

        should not be disturbed by the Appellate Court. In this regard,

        reliance has been placed on a judgment, rendered by the

        Hon’ble Apex Court in the case of UHL Power Company Ltd.

        vs. State of Himachal Pradesh, reported in (2022) 4 SCC 116

        as also upon the one rendered by the Hon’ble Apex Court in the

        case of Reliance Infrastructure Ltd. vs. State of Goa, reported

        in (2024) 1 SCC 479, paragraphs no. 25 to 33 whereof are

        reproduced herein below:-

                “25. Having regard to the contentions urged and the
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       43/119




                issues raised, it shall also be apposite to take note of the
                principles enunciated by this Court in some of the
                relevant decisions cited by the parties on the scope of
                challenge to an arbitral award under Section 34 and the
                scope of appeal under Section 37 of the 1996 Act.
                26. In MMTC [MMTC Ltd. v. Vedanta Ltd., (2019) 4 SCC
                163], this Court took note of various decisions including
                that in Associate Builders [Associate Builders v. DDA,
                (2015) 3 SCC 49] and exposited on the limited scope of
                interference under Section 34 and further narrower scope
                of appeal under Section 37 of the 1996 Act, particularly
                when dealing with the concurrent findings (of the
                arbitrator and then of the Court). This Court, inter alia,
                held as under: [MMTC Ltd. v. Vedanta Ltd., (2019) 4
                SCC 163], SCC pp. 166-67, paras 11-14)
                  “11. As far as Section 34 is concerned, the position is
                  well-settled by now that the Court does not sit in
                  appeal over the arbitral award and may interfere on
                  merits on the limited ground provided under Section
                  34(2)(b)(ii) i.e. if the award is against the public policy
                  of India. As per the legal position clarified through
                  decisions of this Court prior to the amendments to the
                  1996 Act in 2015, a violation of Indian public policy, in
                  turn, includes a violation of the fundamental policy of
                  Indian law, a violation of the interest of India, conflict
                  with justice or morality, and the existence of patent
                  illegality in the arbitral award. Additionally, the
                  concept of the “fundamental policy of Indian law”
                  would cover compliance with statutes and judicial
                  precedents, adopting a judicial approach, compliance
                  with the principles of natural justice, and Wednesbury
                  [Associated Provincial Picture Houses v. Wednesbury
                  Corpn., (1948) 1 KB 223 (CA)] reasonableness.
                  Furthermore, “patent illegality” itself has been held to
                  mean contravention of the substantive law of India,
                  contravention of the 1996 Act, and contravention of the
                  terms of the contract.
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       44/119




                  12. It is only if one of these conditions is met that the
                  Court may interfere with an arbitral award in terms of
                  Section 34(2)(b)(ii), but such interference does not
                  entail a review of the merits of the dispute, and is
                  limited to situations where the findings of the arbitrator
                  are arbitrary, capricious or perverse, or when the
                  conscience of the Court is shocked, or when the
                  illegality is not trivial but goes to the root of the matter.
                  An arbitral award may not be interfered with if the
                  view taken by the arbitrator is a possible view based on
                  facts. (See Associate Builders v. DDA [Associate
                  Builders v. DDA, (2015) 3 SCC 49] Also see ONGC
                  Ltd. v. Saw Pipes Ltd. [ONGC Ltd. v. Saw Pipes Ltd.,
                  (2003) 5 SCC 705]; Hindustan Zinc Ltd. v. Friends
                  Coal Carbonisation [(2006) 4 SCC 445]; and
                  McDermott International Inc. v. Burn Standard Co.
                  Ltd. [(2006) 11 SCC 181])
                  13. It is relevant to note that after the 2015 Amendment
                  to Section 34, the above position stands somewhat
                  modified. Pursuant to the insertion of Explanation 1 to
                  Section 34(2), the scope of contravention of Indian
                  public policy has been modified to the extent that it
                  now means fraud or corruption in the making of the
                  award, violation of Section 75 or Section 81 of the Act,
                  contravention of the fundamental policy of Indian law,
                  and conflict with the most basic notions of justice or
                  morality. Additionally, sub-section (2-A) has been
                  inserted in Section 34, which provides that in case of
                  domestic arbitrations, violation of Indian public policy
                  also includes patent illegality appearing on the face of
                  the award. The proviso to the same states that an award
                  shall not be set aside merely on the ground of an
                  erroneous application of the law or by reappreciation
                  of evidence.
                  14. As far as interference with an order made under
                  Section 34, as per Section 37, is concerned, it cannot
                  be disputed that such interference under Section 37
                  cannot travel beyond the restrictions laid down under
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       45/119




                  Section 34. In other words, the Court cannot undertake
                  an independent assessment of the merits of the award,
                  and must only ascertain that the exercise of power by
                  the Court under Section 34 has not exceeded the scope
                  of the provision. Thus, it is evident that in case an
                  arbitral award has been confirmed by the Court under
                  Section 34 and by the Court in an appeal under Section
                  37, this Court must be extremely cautious and slow to
                  disturb such concurrent findings.”
                27. In Ssangyong Engg. [Ssangyong Engg. &
                Construction Co. Ltd. v. NHAI, (2019) 15 SCC 131], this
                Court has set out the scope of challenge under Section 34
                of the 1996 Act in further details in the following words :
                (SCC pp. 170-71, paras 37-41)
                  “37. Insofar as domestic awards made in India are
                  concerned, an additional ground is now available
                  under sub-section (2-A), added by the Amendment Act,
                  2015, to Section 34. Here, there must be patent
                  illegality appearing on the face of the award, which
                  refers to such illegality as goes to the root of the matter
                  but which does not amount to mere erroneous
                  application of the law. In short, what is not subsumed
                  within “the fundamental policy of Indian law”, namely,
                  the contravention of a statute not linked to public
                  policy or public interest, cannot be brought in by the
                  backdoor when it comes to setting aside an award on
                  the ground of patent illegality.
                  38. Secondly, it is also made clear that reappreciation
                  of evidence, which is what an appellate court is
                  permitted to do, cannot be permitted under the ground
                  of patent illegality appearing on the face of the award.
                  39. To elucidate, para 42.1 of Associate Builders
                  [Associate Builders v. DDA, (2015) 3 SCC 49], namely,
                  a mere contravention of the substantive law of India, by
                  itself, is no longer a ground available to set aside an
                  arbitral award. Para 42.2 of Associate Builders
                  [Associate Builders v. DDA, (2015) 3 SCC 49],
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       46/119




                  however, would remain, for if an arbitrator gives no
                  reasons for an award and contravenes Section 31(3) of
                  the 1996 Act, that would certainly amount to a patent
                  illegality on the face of the award.
                  40. The change made in Section 28(3) by the
                  Amendment Act really follows what is stated in paras
                  42.3 to 45 in Associate Builders [Associate Builders v.
                  DDA, (2015) 3 SCC 49], namely, that the construction
                  of the terms of a contract is primarily for an arbitrator
                  to decide, unless the arbitrator construes the contract
                  in a manner that no fair-minded or reasonable person
                  would; in short, that the arbitrator's view is not even a
                  possible view to take. Also, if the arbitrator wanders
                  outside the contract and deals with matters not allotted
                  to him, he commits an error of jurisdiction. This ground
                  of challenge will now fall within the new ground added
                  under Section 34(2-A).
                  41. What is important to note is that a decision which is
                  perverse, as understood in paras 31 and 32 of
                  Associate Builders [(2015) 3 SCC 49], while no longer
                  being a ground for challenge under “public policy of
                  India”, would certainly amount to a patent illegality
                  appearing on the face of the award. Thus, a finding
                  based on no evidence at all or an award which ignores
                  vital evidence in arriving at its decision would be
                  perverse and liable to be set aside on the ground of
                  patent illegality. Additionally, a finding based on
                  documents taken behind the back of the parties by the
                  arbitrator would also qualify as a decision based on no
                  evidence inasmuch as such decision is not based on
                  evidence led by the parties, and therefore, would also
                  have to be characterised as perverse.”
                28. The limited scope of challenge under Section 34 of
                the Act was once again highlighted by this Court in PSA
                Sical Terminals [PSA Sical Terminals (P) Ltd. v. V.O.
                Chidambranar Port Trust, (2023) 15 SCC 781] and this
                Court particularly explained the relevant tests as under :
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       47/119




                (SCC paras 40 to 42)
                  “40. It will thus appear to be a more than settled legal
                  position, that in an application under Section 34, the
                  Court is not expected to act as an appellate court and
                  reappreciate the evidence. The scope of interference
                  would be limited to grounds provided under Section 34
                  of the Arbitration Act. The interference would be so
                  warranted when the award is in violation of “public
                  policy of India”, which has been held to mean “the
                  fundamental policy of Indian law”. A judicial
                  intervention on account of interfering on the merits of
                  the award would not be permissible. However, the
                  principles of natural justice as contained in Sections 18
                  and 34(2)(a)(iii) of the Arbitration Act would continue
                  to be the grounds of challenge of an award. The ground
                  for interference on the basis that the award is in
                  conflict with justice or morality is now to be
                  understood as a conflict with the “most basic notions of
                  morality or justice”. It is only such arbitral awards that
                  shock the conscience of the Court, that can be set aside
                  on the said ground. An award would be set aside on the
                  ground of patent illegality appearing on the face of the
                  award and as such, which goes to the roots of the
                  matter. However, an illegality with regard to a mere
                  erroneous application of law would not be a ground for
                  interference. Equally, reappreciation of evidence would
                  not be permissible on the ground of patent illegality
                  appearing on the face of the award.
                  41. A decision which is perverse, though would not be
                  a ground for challenge under “public policy of India”,
                  would certainly amount to a patent illegality appearing
                  on the face of the award. However, a finding based on
                  no evidence at all or an award which ignores vital
                  evidence in arriving at its decision would be perverse
                  and liable to be set aside on the ground of patent
                  illegality.
                  42. To understand the test of perversity, it will also be
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       48/119




                  appropriate to refer to paras 31 and 32 from the
                  judgment of this Court in Associate Builders [Associate
                  Builders v. DDA, (2015) 3 SCC 49], which read thus:
                  (SCC pp. 75-76)
                    ‘31. The third juristic principle is that a decision
                    which is perverse or so irrational that no reasonable
                    person would have arrived at the same is important
                    and requires some degree of explanation. It is settled
                    law that where:
                    (i) a finding is based on no evidence, or
                    (ii) an Arbitral Tribunal takes into account something
                    irrelevant to the decision which it arrives at; or
                    (iii) ignores vital evidence in arriving at its decision,
                    such decision would necessarily be perverse.
                    32. A good working test of perversity is contained in
                    two judgments. In CCE & Sales v. Gopi Nath & Sons
                    [1992 Supp (2) SCC 312], it was held:
                       “7. … It is, no doubt, true that if a finding of fact is
                       arrived at by ignoring or excluding relevant
                       material or by taking into consideration irrelevant
                       material or if the finding so outrageously defies
                       logic as to suffer from the vice of irrationality
                       incurring the blame of being perverse, then, the
                       finding is rendered infirm in law.”
                29. In Delhi Airport Metro Express [Delhi Airport Metro
                Express (P) Ltd. v. DMRC, (2022) 1 SCC 131], this Court
                again surveyed the case law and explained the contours
                of the Courts' power to review the arbitral awards.
                Therein, this Court not only reaffirmed the principles
                aforesaid but also highlighted an area of serious concern
                while pointing out “a disturbing tendency” of the Courts
                in setting aside arbitral awards after dissecting and
                reassessing factual aspects. This Court also underscored
                the pertinent features and scope of the expression “patent
                illegality” while reiterating that the Courts do not sit in
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       49/119




                appeal over the arbitral award. The relevant and
                significant passages of this judgment could be usefully
                extracted as under: [Delhi Airport Metro Express (P)
                Ltd. v. DMRC, (2022) 1 SCC 131], SCC pp. 147-48, 150-
                51 & 155-56, paras 26, 28-30 & 42)
                  “26. A cumulative reading of the UNCITRAL Model Law
                  and Rules, the legislative intent with which the 1996
                  Act is made, Section 5 and Section 34 of the 1996 Act
                  would make it clear that judicial interference with the
                  arbitral awards is limited to the grounds in Section 34.
                  While deciding applications filed under Section 34 of
                  the Act, Courts are mandated to strictly act in
                  accordance with and within the confines of Section 34,
                  refraining from appreciation or reappreciation of
                  matters of fact as well as law. (See Uttarakhand Purv
                  Sainik Kalyan Nigam Ltd. v. Northern Coal Field Ltd.
                  [(2020) 2 SCC 455], Bhaven Construction v. Sardar
                  Sarovar Narmada Nigam Ltd. [(2022) 1 SCC 75] &
                  Rashtriya Ispat Nigam Ltd. v. Dewan Chand Ram
                  Saran [(2012) 5 SCC 306].)
                                                ***
                  28. This Court has in several other judgments
                  interpreted Section 34 of the 1996 Act to stress on the
                  restraint to be shown by Courts while examining the
                  validity of the arbitral awards. The limited grounds
                  available to Courts for annulment of arbitral awards
                  are well known to legally trained minds. However, the
                  difficulty arises in applying the well-established
                  principles for interference to the facts of each case that
                  come up before the Courts. There is a disturbing
                  tendency of Courts setting aside arbitral awards, after
                  dissecting and reassessing factual aspects of the cases
                  to come to a conclusion that the award needs
                  intervention and thereafter, dubbing the award to be
                  vitiated by either perversity or patent illegality, apart
                  from the other grounds available for annulment of the
                  award. This approach would lead to corrosion of the
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       50/119




                  object of the 1996 Act and the endeavours made to
                  preserve this object, which is minimal judicial
                  interference with arbitral awards. That apart, several
                  judicial pronouncements of this Court would become a
                  dead letter if arbitral awards are set aside by
                  categorising them as perverse or patently illegal
                  without appreciating the contours of the said
                  expressions.
                  29. Patent illegality should be illegality which goes to
                  the root of the matter. In other words, every error of
                  law committed by the Arbitral Tribunal would not fall
                  within the expression “patent illegality”. Likewise,
                  erroneous application of law cannot be categorised as
                  patent illegality. In addition, contravention of law not
                  linked to public policy or public interest is beyond the
                  scope of the expression “patent illegality”. What is
                  prohibited is for Courts to reappreciate evidence to
                  conclude that the award suffers from patent illegality
                  appearing on the face of the award, as Courts do not sit
                  in appeal against the arbitral award. The permissible
                  grounds for interference with a domestic award under
                  Section 34(2-A) on the ground of patent illegality is
                  when the arbitrator takes a view which is not even a
                  possible one, or interprets a clause in the contract in
                  such a manner which no fair-minded or reasonable
                  person would, or if the arbitrator commits an error of
                  jurisdiction by wandering outside the contract and
                  dealing with matters not allotted to them. An arbitral
                  award stating no reasons for its findings would make
                  itself susceptible to challenge on this account. The
                  conclusions of the arbitrator which are based on no
                  evidence or have been arrived at by ignoring vital
                  evidence are perverse and can be set aside on the
                  ground of patent illegality. Also, consideration of
                  documents which are not supplied to the other party is
                  a facet of perversity falling within the expression
                  “patent illegality”.
                  30. Section 34(2)(b) refers to the other grounds on
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       51/119




                  which a court can set aside an arbitral award. If a
                  dispute which is not capable of settlement by
                  arbitration is the subject-matter of the award or if the
                  award is in conflict with public policy of India, the
                  award is liable to be set aside. Explanation (1),
                  amended by the 2015 Amendment Act, clarified the
                  expression “public policy of India” and its
                  connotations for the purposes of reviewing arbitral
                  awards. It has been made clear that an award would be
                  in conflict with public policy of India only when it is
                  induced or affected by fraud or corruption or is in
                  violation of Section 75 or Section 81 of the 1996 Act, if
                  it is in contravention with the fundamental policy of
                  Indian law or if it is in conflict with the most basic
                  notions of morality or justice.
                                                ***
                  42. The Division Bench referred to various factors
                  leading to the termination notice, to conclude that the
                  award shocks the conscience of the Court. The
                  discussion in SCC OnLine Del para 103 of the
                  impugned judgment [DMRC v. Delhi Airport Metro
                  Express (P) Ltd., 2019 SCC OnLine Del 6562] amounts
                  to appreciation or reappreciation of the facts which is
                  not permissible under Section 34 of the 1996 Act. The
                  Division Bench further held that the fact of AMEL
                  being operated without any adverse event for a period
                  of more than four years since the date of issuance of
                  the CMRS certificate, was not given due importance by
                  the Arbitral Tribunal. As the arbitrator is the sole
                  Judge of the quality as well as the quantity of the
                  evidence, the task of being a Judge on the evidence
                  before the Tribunal does not fall upon the Court in
                  exercise of its jurisdiction U/s. 34. [State of Rajasthan
                  v. Puri Constr. Co. Ltd., (1994) 6 SCC 485] On the
                  basis of the issues submitted by the parties, the Arbitral
                  Tribunal framed issues for consideration and answered
                  the said issues. Subsequent events need not be taken
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       52/119




                  into account.”
                                                             (emphasis supplied)
                30. In Haryana Tourism [Haryana Tourism Ltd. v.
                Kandhari Beverages Ltd., (2022) 3 SCC 237 : (2022) 2
                SCC (Civ) 87] , this Court yet again pointed out the
                limited scope of interference under Sections 34 and 37 of
                the Act; and disapproved interference by the High Court
                under Section 37 of the Act while entering into merits of
                the claim in the following words : (SCC p. 240, paras 8-
                9)
                  “8. So far as the impugned judgment and order
                  [Kandhari Beverages Ltd. v. Haryana Tourism Ltd.,
                  2018 SCC OnLine P&H 3233] passed by the High
                  Court quashing and setting aside the award and the
                  order passed by the Additional District Judge under
                  Section 34 of the Arbitration Act are concerned, it is
                  required to be noted that in an appeal under Section 37
                  of the Arbitration Act, the High Court has entered into
                  the merits of the claim, which is not permissible in
                  exercise of powers U/s. 37 of the Arbitration Act.
                  9. As per settled position of law laid down by this Court
                  in a catena of decisions, an award can be set aside only
                  if the award is against the public policy of India. The
                  award can be set aside under Sections 34/37 of the
                  Arbitration Act, if the award is found to be contrary to:
                  (a) fundamental policy of Indian Law; or (b) the
                  interest of India; or (c) justice or morality; or (d) if it is
                  patently illegal. None of the aforesaid exceptions shall
                  be applicable to the facts of the case on hand. The High
                  Court has entered into the merits of the claim and has
                  decided the appeal under Section 37 of the Arbitration
                  Act as if the High Court was deciding the appeal
                  against the judgment and decree passed by the learned
                  trial court. Thus, the High Court has exercised the
                  jurisdiction not vested in it under Section 37 of the
                  Arbitration Act. The impugned judgment and order
                  [Kandhari Beverages Ltd. v. Haryana Tourism Ltd.,
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       53/119




                  2018 SCC OnLine P&H 3233] passed by the High
                  Court is hence not sustainable.”
                31. As regards the limited scope of interference under
                Sections 34/37 of the Act, we may also usefully refer to
                the following observations of a three-Judge Bench of this
                Court in UHL Power Co. Ltd. v. State of H.P. [(2022) 4
                SCC 116]: (SCC p. 124, paras 15-16)
                  “15. This Court also accepts as correct, the view
                  expressed by the appellate court that the learned Single
                  Judge committed a gross error in reappreciating the
                  findings returned by the Arbitral Tribunal and taking
                  an entirely different view in respect of the interpretation
                  of the relevant clauses of the implementation agreement
                  governing the parties inasmuch as it was not open to
                  the said court to do so in proceedings U/s. 34 of the
                  Arbitration Act, by virtually acting as a court of
                  appeal.
                  16. As it is, the jurisdiction conferred on courts under
                  Section 34 of the Arbitration Act is fairly narrow, when
                  it comes to the scope of an appeal under Section 37 of
                  the Arbitration Act, the jurisdiction of an appellate
                  court in examining an order, setting aside or refusing to
                  set aside an award, is all the more circumscribed.”
                32. The learned Attorney General has referred to another
                three-Judge Bench decision of this Court in SAL Udyog
                [State of Chhattisgarh v. SAL Udyog (P) Ltd., (2022) 2
                SCC 275], wherein this Court indeed interfered with the
                award in question when the same was found suffering
                from non-consideration of a relevant contractual clause.
                In the said decision too, the principles aforesaid in Delhi
                Airport Metro Express [(2022) 1 SCC 131], Ssangyong
                Engg. [(2019) 15 SCC 131] and other cases were
                referred to and thereafter, this Court applied the
                principles to the facts of that case. We shall refer to the
                said decision later at an appropriate juncture.
                33. Keeping in view the aforementioned principles
                enunciated by this Court with regard to the limited scope
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       54/119




                of interference in an arbitral award by a Court in the
                exercise of its jurisdiction U/s. 34 of the Act, which is all
                the more circumscribed in an appeal under Section 37,
                we may examine the rival submissions of the parties in
                relation to the matters dealt with by the High Court.”
        30.     Thus, it is submitted by the learned counsel for the

        claimant-Respondent that the law is now well-settled, inasmuch

        as an arbitral award can be set aside only on the ground of

        patent illegality, i.e. where illegalities go to the root of the

        matter but re-appreciation of facts and evidence cannot be

        permitted under the ground of patent illegality and the

        jurisdiction conferred on Courts under Section 34/37 of the Act

        is fairly narrow. It is equally a well-settled law that power of

        Court under Section 37 of the Act, 1996 is not same as the

        power of the Appellate Court under Code of Civil Procedure,

        inasmuch as the learned Appellate Court can re-appreciate both

        factual and legal position whereas the jurisdiction of the Court

        under Section 37 is confined only to see that the power under

        Section 34 has been rightly exercised. In fact, neither the Court

        exercising jurisdiction under Section 34 nor under Section 37 of

        the Act, 1996 can go into finding of facts recorded by the

        arbitral Tribunal. Reference has been made to a judgment

        rendered by the Hon’ble Apex Court in the case Bombay Slum

        Redevelopment Corporation Ltd. vs. Samir Narain Bhojwani,
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       55/119




        reported in (2024) 7 SCC 218 as also to the one rendered in the

        case     of   Somdat       Builders-NCC-NEC(JV)      vs.   National

        Highways Authority of India & Others, reported in (2025) 6

        SCC 757 and the one rendered in the case of Jan De Nul

        Dredging India Private Ltd. vs. Tuticorin Port Trust, reported

        in (2026) SCC Online SC 33.

        Determination:

        31.     We have heard the learned counsel for the parties at

        length and perused the voluminous records, including the

        records of the arbitral proceedings, copies of Misc. (Arbitration)

        Case No.158 of 2020 and the reply/supplementary reply filed

        therein as also the arbitral award dated 17.10.2020 and the

        impugned judgement passed by the learned PDJ, Patna dated

        25.07.2025.

        32.     Shorn of unnecessary details, the facts of the present case

        are that an agreement dated 24.10.2016 was entered into

        between the parties for three years, whereby the claimant-

        respondent was required to execute the work of Transporting-

        cum-Handling Agent for the District Madhubani and he was

        entrusted with the work of transportation of food-grains and

        other commodities including edible oil to the destinated

        godown, as directed by or on behalf of the appellants and
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       56/119




        according to the route chart fixed for the said purpose. The

        period of agreement was from 24.10.2016 to 23.10.2019,

        however it appears that on account of one of the trucks of the

        claimant-respondent, which was loaded with 550 bags of rice,

        having been looted, an FIR bearing Khutaina P.S. Case No. 133

        of 2018 dated 23.12.2018 was registered under Sections 379,

        411, 409 and 120 B of the Indian Penal Code read with Section

        7 of the Essential Commodities Act, 1955 and Section 37 (6) of

        the Bihar Prohibition and Excise Act, 2016 against six persons

        including the driver of the said truck. The said occurrence

        resulted in the District Manager, BSFC, Madhubani issuing a

        show cause dated 13.05.2019 to the claimant-respondent, as to

        why in terms of Clause 4(f) of the Agreement, appropriate

        proceedings for cancellation of agreement and blacklisting the

        claimant-respondent for five years be not initiated, to which the

        claimant-respondent had filed his reply dated 18.05.2019,

        however the District Transport Committee, Madhubani vide

        minutes of meeting dated 21.05.2019 decided to blacklist the

        claimant-respondent for a period of five years, forfeit the

        security deposit, terminate the agreement and invoke the bank

        guarantee. This was followed by a reasoned order dated

        23.05.2019 by which the claimant-respondent was blacklisted
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       57/119




        for five years, the security deposit was forfeited, the agreement

        was terminated and the bank guarantee was invoked. The said

        order dated 23.05.2019 was though assailed by the claimant-

        respondent before the learned Single Judge of this Court in

        CWJC No. 12554 of 2019, however the learned Single Judge of

        this Court vide order dated 21.08.2019 had though quashed the

        order of blacklisting, however liberty was granted to the

        claimant-respondent to seek his remedy against the order of

        termination, forfeiture of security deposit and invocation of

        bank guarantee in a duly constituted arbitration proceedings or

        as may be advised in accordance with law.

        33.     The claimant-respondent had then sent a notice to the

        appellants on 29.05.2019 for appointing an arbitrator suggesting

        three names, however the appellants did not respond to the said

        notice as also failed to appoint any arbitrator within a reasonable

        time leading to the respondent filing a request case before this

        Court bearing Request Case No. 66 of 2019, under Section 11(6)

        of the Act, 1996 for appointment of an independent and

        impartial arbitrator in lieu of the provisions in the agreement in

        question, whereupon the Learned Chief Justice of this Court by

        an order dated 06.09.2019 passed in Request Case No. 66 of

        2019 and other analogous cases, had appointed Hon’ble Mr.
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       58/119




        Justice Sadanand Mukherjee, a retired judge of the Patna High

        Court as the Sole Arbitrator to enter upon the disputes and

        render his award in terms of the provision of the Act, 1996.

        34.     The claimant-respondent had then filed a detailed

        statement of claim before the learned Arbitrator on 11.10.2019,

        being aggrieved with the order dated 23.05.2019, terminating

        the agreement in question, forfeiting the security deposit and

        invoking the bank guarantee and further raising claims on the

        head of non-payment/short payment of the bills pertaining to

        transportation and handling charges. The claimant-respondent

        had prayed for the following reliefs in the statement of claim

        filed before the learned Arbitrator:-

                 “(i) It be held and declared that the Termination of
                 agreement, Forfeiture of Security and Invocation of Bank
                 Guarantee in the Minutes of Meeting dated 21.05.2019
                 (contained in Annexure- C-48 to the Statement of
                 Claims) of the District Transport Committee, Madhubani
                 and reasoned order contained in Memo No. 681 dated
                 23.05.2019 issued under the signature of Managing
                 Director of the Corporation (contained in Annexure- C-
                 49 to the Statement of Claims) is inoperative, illegal,
                 unjustified and contrary to the terms of the agreement
                 and not binding on the claimant/petitioner.
                 (ii) By an interim order the operation of the reasoned
                 order contained in (contained in Annexure-C-49 to the
                 Statement of Claims) be stayed till the disposal and final
                 award in the present arbitral proceeding.
                 (iii) Respondents jointly and severely be directed to make
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       59/119




                 payment of the claims of the claimant amounting to Rs.
                 4,32,23,044.57 (four crore thirty two lakh twenty three
                 thousand forty four rupees and fifty seven paisa) towards
                 dues (Illegal deduction and withholding of bills of the
                 claimant/petitioner) with interest thereon @ 18% till
                 31.10.2019 as noted in Annexure C-63 to the statement
                 of claims, with further interest thereon at the rate of 18%
                 per annum from 01.11.2019 up to date of actual receipt
                 of the awarded amount with interest thereon by the
                 claimant.
                 (iv) The respondents jointly and severely be directed to
                 pay the cost of arbitration to the claimant.
                 (v) The Hon'ble Tribunal may grant any other relief or
                 reliefs which is deemed fit and proper in the ends of
                 justice to the claimant.”
        35.     The appellants had then filed statement of defence on

        13.01.2020, whereafter the claimant-respondent had filed a

        rejoinder dated 11.02.2020 as also a supplementary statement of

        claim on 14.06.2020. The learned Sole Arbitrator had then

        framed issues for consideration.

        36.     The learned Sole Arbitrator vide arbitral award dated

        17.10.2020 has allowed the claim of the claimant-respondent on

        the head of outstanding bills amount to the tune of Rs.

        2,67,37,638.62, compensation to the tune of Rs. 25 lakhs,

        simple interest @ 10% for the pendente lite period and further

        18% interest over the awarded sum from the date of award till

        realization of the awarded amount, cost towards fees and

        expenses of the arbitrator and courts and other legal expenses
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       60/119




        apart from treating the arbitrator’s fees not paid by the

        appellants as unpaid cost of the award under Section 39 of the

        Act, 1996. We have already reproduced the entitlements of the

        claimant-respondent, as awarded by the learned Sole Arbitrator

        by the arbitral award dt. 17.10.2020, hereinabove in paragraph

        No. 9. The said award dated 17.10.2020 was challenged by the

        appellants before the learned Court of PDJ, Patna by filing

        Misc. (Arbitration) Case No.158 of 2020 under Section 34 (2) &

        (2A) of the Act, 1996, to which the claimant had filed a reply as

        also a supplementary reply dt. 23.12.2021 & 14.2.2022,

        respectively.

        37.     The learned PDJ, Patna by the impugned judgment dated

        25.07.2025 has been pleased to dismiss the said Misc.

        (Arbitration) Case No. 158 of 2020 holding that no valid ground

        has been made out under Section (2) or (2A) of Section 34 of

        the Act, 1996 so as to warrant interference with the impugned

        arbitral award or findings of the learned Sole Arbitrator. The

        findings recorded by the learned PDJ, Patna in the aforesaid

        judgement dated 25.07.2025 has already been detailed

        hereinabove in paragraph No. 17.

        38.     At the outset, it would be apt to reproduce the relevant

        Clauses of the Agreement dt. 24.10.2016 entered into between
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       61/119




        the parties for the District of Madhubani, herein below:-

                 “12. The First Pary shall be liable to pay the second
                 Party remuneration for the undertaking in this
                 agreement at the rates specified below against each item.
                 No other charges shall be admissible to the second party
                 for the due performance to this agreement. These rates
                 are also subject to revision at any time at the discretion
                 of the First Party. If the Second Party agree to such
                 revisions either by express consent or by implied action
                 such rates would automatically be binding to the second
                 Party.
                 (Application of rate of Particular slab will be only upto
                 the maximum distance fixed for the beginning form Zero)
                 13. No separate handling and stacking charges is
                 payable in respect of handling work taking place at
                 F.C.I. depot or rail head/Godown. Schedule of approved
                 rates for transport and handling is indicated above in
                 this agreement.
                 14. The District Manager, Bihar state Food & Civil
                 Supplies Corporation Ltd. shall on completion of each
                 month, calculate the amount of remuneration for which
                 the Second Party is entitled to as aforesaid and pay the
                 same by Account Payee cheque within a reasonable
                 period after such accounting. However, after the
                 submission of bills by the Second Party and subject to
                 the completion of such other formalities as required by
                 the First party, the payment against bill submitted by the
                 Second-Party will be made by the first party in the
                 manner specified in the Head office Circular No. Audit-
                 IX 13/96-799 dated 07.02.2001. The First Party reserves
                 the right to amend the procedure of payment as and
                 when such is required. No interest shall be payable to the
                 Second Party for unavoidable delay in the payment. In
                 special circumstances, the payment may be made even
                 within the quarter at discretion of the District Manager
                 with prior approval of the Managing Director while
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       62/119




                 making the payment the damage like shortage officially,
                 accident, theft etc. payable by the Second Party will be
                 deducted and if damage is claimed but not finally
                 determined, payment to that extent will be withheld till
                 final determination which is to be done at the shortest
                 possible time.
                 18. The agreement shall remain in operation for the
                 period of three years from the date of publication of
                 Tender notice by the contractor has been appointed and
                 it can be terminated any time by issuing 15 days prior
                 notice. This may be terminated earlier than the period
                 mentioned above on behalf of the First Party in case of
                 non-lifting of grains, sugar, edible oil etc. During the
                 specified period if there is any breach of any of the terms
                 of the agreement by the second party, the agreement may
                 be terminated and blacklisted as well as debarred for
                 next five years from future transportation work, security
                 deposits will be forfeited and Bank guarantee of 20 lacs
                 (twenty lac only) will be utilized and encashed at once by
                 the First Party. The responsibility of the second party
                 shall not cease with the termination of the agreement
                 unless he has redelivered the grains, sugar, edible oils
                 and etc., entrusted to him and rendered complete
                 accounts thereof to the satisfaction of the First Party.
                 21. All disputes arising under or in pursuance of this
                 agreement between the parties, except matters decision
                 of which herein expressly is otherwise provided, shall be
                 referred to sole arbitration of the C.M.D/Managing
                 Director of the Bihar State Food & Civil Supplies
                 Corporation Ltd. Patna or a person nominated by the
                 C.M.D/ Managing Director decision of such arbitrator
                 shall be final and binding on both the parties. The
                 provisions of the arbitration and conciliation Act, 1996
                 and rules framed there under and statuary modifications
                 thereof shall apply to the proceedings of arbitration and
                 all such disputes shall be subject to the jurisdiction of
                 courts at Patna.
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       63/119




                 22. The second party would not be entitled to claim any
                 compensation for detention of their trucks at the godown
                 gates or detention by law enforcing agencies during
                 transit any other authorized places of the corporation
                 from where the delivery of any consignment is to be
                 obtained or where any delivery is to be given.”
        39.     At this juncture, we would like to delve upon the scope of

        Sections 34 and 37 of the Act, 1996, as has been considered and

        settled in a catena of cases by the Hon’ble Apex Court. In this

        regard, we would first refer to the judgment rendered by the

        Hon’ble Apex Court in the case of SEPCO Electric Power

        Construction Corporation vs. GMR Kamalanga Energy

        Limited reported in (2026) 2 SCC 542, paragraph Nos. 68, 114

        to 116 whereof are reproduced herein below:-

                 “68. Furthermore, in the process of discussing the
                 jurisdiction and powers of courts under Sections 34 and
                 37 of the 1996 Act, a 3-Judge Bench of this Court, in
                 UHL Power Co. [UHL Power Co. Ltd. v. State of H.P.,
                 (2022) 4 SCC 116] while holding that the learned Single
                 Judge of the High Court concerned had exceeded his
                 jurisdiction through interference with the arbitral award,
                 explicated the reasons of such narrow scope of powers of
                 a court under Section 34 of the 1996 Act. Referencing
                 extensively on other decisions of this Court, namely,
                 MMTC [MMTC Ltd. v. Vedanta Ltd., (2019) 4 SCC 163],
                 K. Sugumar v. Hindustan Petroleum Corpn. Ltd. [(2020)
                 12 SCC 539] , Dyna Technologies [(2019) 20 SCC 1] ,
                 and Parsa Kente Collieries [(2019) 7 SCC 236], it laid
                 down that the courts do not sit in appeal over arbitral
                 awards, therefore, the jurisdiction of the courts
                 concerned is confined to specific grounds as laid down
                 under Section 34 of the 1996 Act, for instance, violation
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       64/119




                 of public policy, patent illegality, or misconduct.
                 Furthermore, it is based on the principle of party
                 autonomy and the need to uphold the finality of an
                 arbitral award. Concluding, it iterated that when the
                 parties have, through conscious decision-making, opted
                 for arbitration as an alternative means of dispute
                 mechanism, the courts ought to refrain from
                 reappreciation of evidence or substitution of
                 interpretation(s), unless the award is perverse,
                 unreasonable, or contrary to the mandate of the statute
                 or decisions of court.
                 114. Summarising the principles as aforesaid, it is
                 undoubtful that the interference under jurisprudence laid
                 down under Sections 34 and 37 of the 1996 Act is
                 narrow, while aforementioned decisions do acknowledge
                 that, SEPCO has vehemently pushed so in an attempt to
                 persuade us to hold the Division Bench in error.
                 However, the jurisprudence, as also identified in the
                 aforesaid issues, clarifies that the principles of natural
                 justice, and the public policy of India are paramount and
                 cannot be ignored or sidelined in an attempt not to
                 frustrate the patent or latent commercial wisdom of the
                 parties to seek an alternative means of dispute
                 resolution. Such issues attack the root of the Indian legal
                 system and the courts cannot be made a mere spectator
                 to such gross violations.
                 115. The scope under Section 37, as rightly argued by
                 SEPCO, is slimmer than that under Section 34, but, in
                 the instant case, the Section 34 judgment had failed to
                 appreciate the gross violations of the basic principles of
                 adjudication of a dispute. While one may argue some of
                 those may be latent and not a prima facie violation,
                 thereby not mandating any interference, direct omission
                 of the mandate of Section 18 and Section 28 sub-section
                 (3) of the 1996 Act are clearly patent through a
                 skimming of arbitral award. No contentions appear on
                 behalf of SEPCO vis-à-vis waiver through the
                 circumstances arising in March 2012, and despite such a
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       65/119




                 want, the Arbitral Tribunal exceeded the mandate to
                 deem a waiver on the part of GMRKE Limited for
                 contractual notices, without any explicit intent.
                 Thereafter, it patently discriminates against GMRKE
                 Limited to deny their claims for want of contractual
                 notice(s).
                 116. An attack on the fundamental policy of Indian law
                 allows for reappreciation and thereby, the impugned
                 judgment cannot be faulted with on the ground of having
                 exceeded its jurisdiction under Section 37 of the 1996
                 Act. The Division Bench was correct in this regard, as to
                 open up the necessary floodgates of reappreciation of the
                 arbitral award.”
        40.     Yet another judgment on the aforesaid issue is the one

        rendered by the Hon’ble Apex Court in the case of UHL Power

        Company Limited vs. State of Himachal Pradesh, reported in

        (2022) 4 SCC 116, paragraph Nos. 16 to 19 and 21 whereof are

        reproduced herein below:-

                 “16. As it is, the jurisdiction conferred on courts under
                 Section 34 of the Arbitration Act is fairly narrow, when it
                 comes to the scope of an appeal under Section 37 of the
                 Arbitration Act, the jurisdiction of an appellate court in
                 examining an order, setting aside or refusing to set aside
                 an award, is all the more circumscribed. In MMTC Ltd.
                 v. Vedanta Ltd. [(2019) 4 SCC 163], the reasons for
                 vesting such a limited jurisdiction on the High Court in
                 exercise of powers under Section 34 of the Arbitration
                 Act have been explained in the following words:
                  “11. As far as Section 34 is concerned, the position is
                  well-settled by now that the Court does not sit in
                  appeal over the arbitral award and may interfere on
                  merits on the limited ground provided under Section
                  34(2)(b)(ii) i.e. if the award is against the public policy
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       66/119




                  of India. As per the legal position clarified through
                  decisions of this Court prior to the amendments to the
                  1996 Act in 2015, a violation of Indian public policy, in
                  turn, includes a violation of the fundamental policy of
                  Indian law, a violation of the interest of India, conflict
                  with justice or morality, and the existence of patent
                  illegality in the arbitral award. Additionally, the
                  concept of the “fundamental policy of Indian law”
                  would cover compliance with statutes and judicial
                  precedents, adopting a judicial approach, compliance
                  with the principles of natural justice, and Wednesbury
                  [Associated Provincial Picture Houses Ltd. v.
                  Wednesbury Corpn., (1948) 1 KB 223 (CA)]
                  reasonableness. Furthermore, “patent illegality” itself
                  has been held to mean contravention of the substantive
                  law of India, contravention of the 1996 Act, and
                  contravention of the terms of the contract.”
                 17. A similar view, as stated above, has been taken by
                 this Court in K. Sugumar v. Hindustan Petroleum Corpn.
                 Ltd. [(2020) 12 SCC 539], wherein it has been observed
                 as follows : (SCC p. 540, para 2)
                  “2. The contours of the power of the Court under
                  Section 34 of the Act are too well established to require
                  any reiteration. Even a bare reading of Section 34 of
                  the Act indicates the highly constricted power of the
                  civil court to interfere with an arbitral award. The
                  reason for this is obvious. When parties have chosen to
                  avail an alternate mechanism for dispute resolution,
                  they must be left to reconcile themselves to the wisdom
                  of the decision of the arbitrator and the role of the
                  court should be restricted to the bare minimum.
                  Interference will be justified only in cases of
                  commission of misconduct by the arbitrator which can
                  find manifestation in different forms including exercise
                  of legal perversity by the arbitrator.”
                 18. It has also been held time and again by this Court
                 that if there are two plausible interpretations of the terms
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       67/119




                 and conditions of the contract, then no fault can be
                 found, if the learned arbitrator proceeds to accept one
                 interpretation as against the other. In Dyna Technologies
                 (P) Ltd. v. Crompton Greaves Ltd. [(2019) 20 SCC 1],
                 the limitations on the Court while exercising powers
                 under Section 34 of the Arbitration Act has been
                 highlighted thus : (SCC p. 12, para 24)
                  “24. There is no dispute that Section 34 of the
                  Arbitration Act limits a challenge to an award only on
                  the grounds provided therein or as interpreted by
                  various Courts. We need to be cognizant of the fact that
                  arbitral awards should not be interfered with in a
                  casual and cavalier manner, unless the Court comes to
                  a conclusion that the perversity of the award goes to
                  the root of the matter without there being a possibility
                  of alternative interpretation which may sustain the
                  arbitral award. Section 34 is different in its approach
                  and cannot be equated with a normal appellate
                  jurisdiction. The mandate under Section 34 is to
                  respect the finality of the arbitral award and the party
                  autonomy to get their dispute adjudicated by an
                  alternative forum as provided under the law. If the
                  Courts were to interfere with the arbitral award in the
                  usual course on factual aspects, then the commercial
                  wisdom behind opting for alternate dispute resolution
                  would stand frustrated.”
                 19. In Parsa Kente Collieries Ltd. v. Rajasthan Rajya
                 Vidyut Utpadan Nigam Ltd. [(2019) 7 SCC 236],
                 adverting to the previous decisions of this Court in
                 McDermott International Inc. v. Burn Standard Co. Ltd.
                 [(2006) 11 SCC 181] and Rashtriya Ispat Nigam Ltd. v.
                 Dewan Chand Ram Saran [(2012) 5 SCC 306], wherein
                 it has been observed that an Arbitral Tribunal must
                 decide in accordance with the terms of the contract, but
                 if a term of the contract has been construed in a
                 reasonable manner, then the award ought not to be set
                 aside on this ground, it has been held thus:
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       68/119




                  “9.1. …It is further observed and held that
                  construction of the terms of a contract is primarily for
                  an arbitrator to decide unless the arbitrator construes
                  the contract in such a way that it could be said to be
                  something that no fair-minded or reasonable person
                  could do. It is further observed by this Court in the
                  aforesaid decision in para 33 that when a court is
                  applying the “public policy” test to an arbitration
                  award, it does not act as a court of appeal and
                  consequently errors of fact cannot be corrected. A
                  possible view by the arbitrator on facts has necessarily
                  to pass muster as the arbitrator is the ultimate master
                  of the quantity and quality of evidence to be relied upon
                  when he delivers his arbitral award. It is further
                  observed that thus an award based on little evidence or
                  on evidence which does not measure up in quality to a
                  trained legal mind would not be held to be invalid on
                  this score.
                  9.2. Similar is the view taken by this Court in NHAI v.
                  ITD Cementation India Ltd. [(2015) 14 SCC 21], SCC
                  para 25 and SAIL v. Gupta Brother Steel Tubes Ltd.
                  [(2009) 10 SCC 63], SCC para 29.”
                 21. An identical line of reasoning has been adopted in
                 South East Asia Marine Engg. & Constructions Ltd.
                 (Seamec Ltd.) v. Oil India Ltd. [(2020) 5 SCC 164] and
                 it has been held as follows:
                  “12. It is a settled position that a court can set aside
                  the award only on the grounds as provided in the
                  Arbitration Act as interpreted by the courts. Recently,
                  this Court in Dyna Technologies (P) Ltd. v. Crompton
                  Greaves Ltd. [(2019) 20 SCC 1] laid down the scope of
                  such interference. This Court observed as follows:
                    ‘24. There is no dispute that Section 34 of the
                    Arbitration Act limits a challenge to an award only on
                    the grounds provided therein or as interpreted by
                    various Courts. We need to be cognizant of the fact
                    that arbitral awards should not be interfered with in a
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       69/119




                    casual and cavalier manner, unless the Court comes
                    to a conclusion that the perversity of the award goes
                    to the root of the matter without there being a
                    possibility of alternative interpretation which may
                    sustain the arbitral award. Section 34 is different in
                    its approach and cannot be equated with a normal
                    appellate jurisdiction. The mandate under Section 34
                    is to respect the finality of the arbitral award and the
                    party autonomy to get their dispute adjudicated by an
                    alternative forum as provided under the law. If the
                    Courts were to interfere with the arbitral award in the
                    usual course on factual aspects, then the commercial
                    wisdom behind opting for alternate dispute resolution
                    would stand frustrated.’
                  13. It is also settled law that where two views are
                  possible, the Court cannot interfere in the plausible
                  view taken by the arbitrator supported by reasoning.
                  This Court in Dyna Technologies [(2019) 20 SCC 1]
                  observed as under :
                    ‘25. Moreover, umpteen number of judgments of this
                    Court have categorically held that the Court should
                    not interfere with an award merely because an
                    alternative view on facts and interpretation of
                    contract exists. The Courts need to be cautious and
                    should defer to the view taken by the Arbitral
                    Tribunal even if the reasoning provided in the award
                    is implied unless such award portrays perversity
                    unpardonable under Section 34 of the Arbitration
                    Act.”
        41.     We may also refer to the judgement rendered in the case

        of Jan De Nul Dredging India Private Limited vs. Tuticorin

        Port Trust reported in 2026 SCC OnLine SC 33, paragraph

        Nos. 36, 37 whereof are reproduced herein below:-

                 “36. In other words, the scope of interference of the
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       70/119




                 court with the arbitral matters is virtually prohibited, if
                 not absolutely barred. The powers of the appellate court
                 are even more restricted than the powers conferred by
                 Section 34 of the Act. The appellate power under Section
                 37 of the Act is exercisable only to find out if the court
                 exercising power under Section 34 of the Act, has acted
                 within its limits as prescribed thereunder or has
                 exceeded or failed to exercise the power so conferred.
                 The appellate court exercising powers under Section 37
                 of the Act has no authority of law to consider the matter
                 in dispute before the Arbitral Tribunal on merits so as to
                 hold as to whether the award of the Arbitral Tribunal is
                 right or wrong. The appellate court in exercise of such
                 power cannot sit as an ordinary court of appeal and
                 reappraise the evidence to record a contrary finding. The
                 award of the Arbitral Tribunal cannot be touched by the
                 court unless it is contrary to the substantive provision of
                 law or any provision of the Act or the terms of the
                 agreement.
                 37. Undoubtedly, in the case at hand, the award of the
                 Arbitral Tribunal is not contrary to any substantive
                 provision of law or any provision of the Act. Yet, it has
                 been disturbed by the appellate court, apparently by
                 giving a different interpretation of the clauses of the
                 licence agreement which jurisdiction was not vested in it.
                 Ordinarily, the interpretation given by the Arbitral
                 Tribunal, as affirmed by the court in exercise of powers
                 under Section 34 of the Act ought to have been
                 accepted.”
        42.     We have already referred to the judgments rendered in the

        cases of Saw Pipes Limited (supra), Associate Builders

        (supra), Reliance Infrastructure Limited (supra), Bombay

        Slum Re-development Corporation Limited (supra), Somdat

        Builders-NCC-NEC (JV) (supra) and host of other judgments
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       71/119




        referred to in the said judgements on the scope of interference

        under Sections 34 and 37 of the Act, 1996. We find from the law

        propounded in the aforesaid judgments, referred to hereinabove

        that broadly as far as Sections 34 and 37 of the Act, 1996 are

        concerned, the Court is not required to sit in appeal over the

        arbitral award and reappreciate the evidence, however

        interference would be permissible in the following situations:-

                 (i) When the award is in violation of Public Policy of
                 India i.e. the Fundamental Policy of Indian Law.

                 (ii) In case of violation of the Principles of Natural
                 Justice as envisaged under Sections 18 and 34 (2)(a)(iii)
                 of the Act, 1996.

                 (iii) If the award is in conflict with justice or morality i.e.
                 in conflict with the most basic notions of morality and
                 justice.

                 (iv) If the arbitral award shocks the conscience of the
                 Court.

                 (v) An arbitral award can also be set aside on the ground
                 of patent illegality appearing on the face of the award
                 which goes to the root of the matter.

        43.     Thus, in nutshell we find that an award can be challenged

        on the grounds provided for under Section 34 (2) and (2A) of

        the Act, 1996. It is a well settled law that where a finding is

        based on no evidence or an arbitral tribunal takes into account
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       72/119




        something irrelevant to the decision which it arrives at or

        ignores vital evidence in arriving at its decision, such decision

        would necessarily be perverse and liable to be set aside on the

        ground of patent illegality. A conspectus of the aforesaid

        judgement rendered by the Hon’ble Apex Court would

        demonstrate that award can be set aside under Sections 34 and

        37 of the Act, 1996, if the award is found to be contrary to:-

                (a) Fundamental policy of Indian Law; or
                (b) The Interest of India; or
                (c) Justice or morality and
                (d) It is patently illegal.
        44.     Yet another issue which arises for consideration is

        whether the powers of the Court under Sections 34 and 37 of the

        Act, 1996 will include the power to modify an arbitral award

        and if the power to modify the award is available, whether such

        power can be exercised only where the award is severable and a

        part thereof can be modified. The said issues have been

        answered in a constitution bench judgment rendered by the

        Hon’ble Apex Court in the case of Gayatri Balasamy vs. ISG

        Novasoft Technologies Limited, reported in (2025) 7 SCC 1, to

        the effect that the Court has a limited power under Sections 34

        and 37 of the Act, 1996 to modify the arbitral award which may

        be exercised under the following circumstances:-
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       73/119




                 (i) When the award is severable, by severing the
                 “invalid” portion from the “valid” portion of the award;

                 (ii) By correcting any clerical, computational or
                 typographical errors which appear erroneous on the face
                 of the record.

                 (iii) By modifying post-award interest in some
                 circumstances;

        45.     It would be apropos to reproduce paragraph Nos. 32 to

        34, 38, 39, 41 to 45, 49, 63, 65 and 87 of the judgment rendered

        by the Hon’ble Apex in the case of Gayatri Balasamy (supra),

        herein below:-

                 “II. Severability of awards
                 32. In the present controversy, the proviso to Section
                 34(2)(a)(iv) is particularly relevant. It states that if the
                 decisions on matters submitted to arbitration can be
                 separated from those not submitted, only that part of the
                 arbitral award which contains decisions on matters non-
                 submitted may be set aside. The proviso, therefore,
                 permits courts to sever the non-arbitrable portions of an
                 award from arbitrable ones. This serves a twofold
                 purpose. First, it aligns with Section 16 of the 1996 Act,
                 which affirms the principle of kompetenz-kompetenz, that
                 is, the arbitrators' competence to determine their own
                 jurisdiction. Secondly, it enables the Court to sever and
                 preserve the “valid” part(s) of the award while setting
                 aside the “invalid” ones. [ The “validity” and
                 “invalidity”, as used here, does not refer to legal validity
                 or merits examination, but validity in terms of the
                 proviso to Section 34(2)(a)(iv) of the 1996 Act.] Indeed,
                 before us, none of the parties have argued that the Court
                 is not empowered to undertake such a segregation.
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       74/119




                 33. We hold that the power conferred under the proviso
                 to Section 34(2)(a)(iv) is clarificatory in nature. The
                 authority to sever the “invalid” portion of an arbitral
                 award from the “valid” portion, while remaining within
                 the narrow confines of Section 34, is inherent in the
                 Court's jurisdiction when setting aside an award.
                 34. To this extent, the doctrine of omne majus continet in
                 se minus—the greater power includes the lesser—applies
                 squarely. The authority to set aside an arbitral award
                 necessarily encompasses the power to set it aside in part,
                 rather than in its entirety. This interpretation is practical
                 and pragmatic. It would be incongruous to hold that
                 power to set aside would only mean power to set aside
                 the award in its entirety and not in part. A contrary
                 interpretation would not only be inconsistent with the
                 statutory framework but may also result in valid
                 determinations being unnecessarily nullified.
                 III. Difference between setting aside and modification
                 38. This distinction lies at the heart of many arguments
                 canvassed before us. The parties opposing the
                 recognition of a power of modification of the courts have
                 strenuously contended that modification and setting
                 aside are distinct and sui generis powers. While
                 modification involves altering specific parts of an award,
                 setting aside does not alter the award but results in its
                 annulment. Their primary concern is that recognising a
                 power of modification may invite judicial interference
                 with the merits of the dispute—something arguably
                 inconsistent with the framework of the 1996 Act.
                 39. We agree with this argument, but only to a limited
                 extent. It is true that modification and setting aside have
                 different consequences: the former alters the award,
                 while the latter annuls it. [ The words used in the statute
                 must be interpreted contextually, taking into account the
                 purpose, scope, and background of the provision. Many
                 words and expressions have both narrow and broad
                 meanings and thereby open to multiple interpretations.
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       75/119




                 Legal interpretation should align with the object and
                 purpose of the legislation. Therefore, we may not strictly
                 apply a semantic differentiation while interpreting the
                 words “modification” or “setting aside”. Instead, a
                 holistic and purposive interpretation of these words will
                 be consistent with the intent behind the provision and the
                 1996 Act. Linguistically and even jurisprudentially, a
                 distinction can be drawn between the expressions —
                 “modification”, “partial setting aside”, and “setting
                 aside” of an arbitral award in its entirety. However, we
                 must note that the practical effect of partially setting
                 aside an award is the modification of the award.]
                 However, we do not concur with the view that
                 recognising any modification power will inevitably lead
                 to an examination of the merits of the dispute. It will
                 completely depend on the extent of the modification
                 powers recognised by us. In the following part of our
                 Analysis, we outline the contours of this limited power
                 and explain why, in our view, recognising it will
                 ultimately yield more just outcomes.
                 41. To deny courts the authority to modify an award—
                 particularly when such a denial would impose significant
                 hardships, escalate costs, and lead to unnecessary delays
                 —would defeat the raison d'être of arbitration. This
                 concern is particularly pronounced in India, where
                 applications under Section 34 and appeals under Section
                 37 often take years to resolve.
                 42. Given this background, if we were to decide that
                 courts can only set aside and not modify awards, then
                 the parties would be compelled to undergo an extra
                 round of arbitration, adding to the previous four stages:
                 the initial arbitration, Section 34 (setting aside
                 proceedings), Section 37 (appeal proceedings), and
                 Article 136 (SLP proceedings). In effect, this
                 interpretation would force the parties into a new
                 arbitration process merely to affirm a decision that could
                 easily be arrived at by the Court. This would render the
                 arbitration process more cumbersome than even
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       76/119




                 traditional litigation.
                 43. Equally, Section 34 limits recourse to courts to an
                 application for setting aside the award. However, Section
                 34 does not restrict the range of reliefs that the Court
                 can grant, while remaining within the contours of the
                 statute. A different relief can be fashioned as long as it
                 does not violate the guardrails of the power provided
                 under Section 34. In other words, the power cannot
                 contradict the essence or language of Section 34. The
                 Court would not exercise appellate power, as envisaged
                 by Order 41 of the Code of Civil Procedure, 1908
                 (hereinafter referred to as “the Code”).
                 44. We are of the opinion that modification represents a
                 more limited, nuanced power in comparison to the
                 annulment of an award, as the latter entails a more
                 severe consequence of the award being voided in toto.
                 Read in this manner, the limited and restricted power of
                 severing an award implies a power of the Court to vary
                 or modify the award. It will be wrong to argue that
                 silence in the 1996 Act, as projected, should be read as a
                 complete prohibition.
                 45. We are thus of the opinion that the Section 34 Court
                 can apply the doctrine of severability and modify a
                 portion of the award while retaining the rest. This is
                 subject to parts of the award being separable, legally
                 and practically, as stipulated in Part II of our Analysis.
                 49. Notwithstanding Section 33, we affirm that a Court
                 reviewing an award under Section 34 possesses the
                 authority to rectify computational, clerical, or
                 typographical errors, as well as other manifest errors,
                 provided that such modification does not necessitate a
                 merits-based evaluation. There are certain powers
                 inherent to the Court, even when not explicitly granted
                 by the legislature. The scope of these inherent powers
                 depends on the nature of the provision, whether it
                 pertains to appellate, reference, or limited jurisdiction as
                 in the case of Section 34. The powers are intrinsically
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       77/119




                 connected as they are part and parcel of the jurisdiction
                 exercised by the Court.
                 63. We are unable to accept the view taken in Kinnari
                 Mullick [Kinnari Mullick v. Ghanshyam Das Damani,
                 (2018) 11 SCC 328 : (2018) 5 SCC (Civ) 106] , which
                 insists that an application or request under Section 34(4)
                 must be made by a party in writing. The request may be
                 oral. Nevertheless, there should be a request which is
                 recorded by the Court. We are also unable to agree that
                 the request must be exercised before the application
                 under Section 34(1) is decided. Section 37 (Annexure A)
                 permits an appeal against any order setting aside or
                 refusing to set aside an arbitral award under Section 34.
                 To this extent, the appellate jurisdiction under Section 37
                 is coterminous with, and as broad as, the jurisdiction of
                 the Court deciding objections under Section 34. Hence,
                 the contention that the Tribunal becomes functus officio
                 after the award is set aside is misplaced. The Section 37
                 Court still possesses the power of remand stipulated in
                 Section 34(4). Of course, the appellate court, while
                 exercising power under Section 37, should be mindful
                 when the award has been upheld by the Section 34
                 Court. But the Section 37 Court still possesses the
                 jurisdiction to remand the matter to the Arbitral
                 Tribunal.
                 65. In Dyna Technologies (P) Ltd. v. Crompton Greaves
                 Ltd. [Dyna Technologies (P) Ltd. v. Crompton Greaves
                 Ltd., (2019) 20 SCC 1] , this Court emphasised that the
                 issuance of a reasoned award is not a mere formality
                 under the 1996 Act. For an award to be termed
                 “reasoned”, it must meet three essential yardsticks: it
                 must be proper, intelligible, and adequate. The purpose
                 behind Section 34(4) is clear: it allows for an award to
                 become enforceable after granting the Tribunal an
                 opportunity to cure any defects. This power is
                 exercisable when the Arbitral Tribunal has failed to give
                 any reasoning or the award exhibits gaps in reasoning
                 and these defects can be cured, thereby preventing
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       78/119




                 unnecessary challenges. The underlying intent is to
                 provide an effective, expeditious forum for addressing
                 curable defects, which Section 34(4) facilitates.
                 Conclusions
                 87. Accordingly, the questions of law referred to by
                 Gayatri Balasamy [Gayatri Balasamy v. ISG Novasoft
                 Technologies Ltd., 2024 SCC OnLine SC 1681] are
                 answered by stating that the Court has a limited power
                 under Sections 34 and 37 of the 1996 Act to modify the
                 arbitral award. This limited power may be exercised
                 under the following circumstances:
                 87.1. When the award is severable, by severing the
                 “invalid” portion from the “valid” portion of the award,
                 as held in Part II of our Analysis;
                 87.2. By correcting any clerical, computational or
                 typographical errors which appear erroneous on the face
                 of the record, as held in Parts IV and V of our Analysis;
                 87.3. Post-award interest may be modified in some
                 circumstances as held in Part IX of our Analysis; and/or
                 87.4. Article 142 of the Constitution applies, albeit, the
                 power must be exercised with great care and caution and
                 within the limits of the constitutional power as outlined
                 in Part XII of our Analysis.”
        46.     Now coming back to the facts of the present case, we find

        that the Ld. sole Arbitrator has by his award dated 17.10.2020

        held that the claimant-respondent shall be paid a sum of

        Rs.2,67,37,638.62/-, including the security amount to the tune of

        Rs.10 lakhs. In this regard, it would be relevant to point out here

        that the learned Arbitrator has come to a finding at internal page

        No.13 of the award dated 17.10.2020 that the claimant-

        respondent has not committed any breach of contract so as to be
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       79/119




        rendered liable under Section 4(f) of the agreement, hence he

        cannot be saddled with any liability for any deduction of the

        amount on account of theft and institution of FIR, however the

        claimant-respondent has raised a claim of Rs.4,32,23,044.57

        towards dues comprising of alleged illegal deduction and

        withholding of bills of claimant-respondent and damages for

        retention of trucks as noted in the tabular content of the

        statement of claim filed by the claimant-respondent. The learned

        Arbitrator, at internal page No.15 of the award dated 17.10.2020

        has further come to a finding that from a perusal of the bills

        submitted by the claimant-respondent it appears that a

        substantial number of retention (sic detention) bills have been

        added along with the amount fallen due, however under Clause

        22 of the Contract, there is clear indication that no charges on

        deduction arising out of detention of the trucks shall be payable,

        thus all such amount are not fit to be reimbursed, hence the

        detention bill shall stand deducted from various bills and such

        amount shall not be payable. Thereafter, the learned Arbitrator at

        internal page No. 16 of the award dated 17.10.2020 has come to

        a finding that on computation of payable bills, a sum of Rs.

        2,57,37,738.62 along with a sum of Rs. 10 lakhs on the head of

        security money is payable to the claimant.
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       80/119




                The only issue which arises for consideration is as to

        whether the learned Arbitrator has committed computational

        error while deducting the detention bills. The records would

        bear it out that the amount claimed by the claimant-respondent

        on the head of “balance payment due” (Column 8 of the Chart

        annexed at running page Nos.223 and 224) is a sum of Rs.

        3,10,21,638.62 but claim to extent of a sum of Rs.

        2,57,37,738.62 has been allowed, meaning thereby that a sum of

        Rs.52,83,900/- has been deducted on the head of detention bills,

        however if the amount of detention bills annexed as Annexures-

        C-6, C-8, C-10, C-12, C-13, C-14, C-15, C-16, C-17, C-21, C-

        23 and C-24 at running page Nos. 125, 127, 129, 131, 132, 133,

        134, 135, 136, 140, 142 and 143 of the brief are totaled-up, the

        amount of detention bills would add up to a sum of Rs.

        58,55,100/-, hence the Ld. Sole Arbitrator ought to have

        awarded a sum of Rs. 2,51,66,538.62 instead of sum of Rs.

        2,57,37,738.62 apart from a sum of Rs. 10 lakhs on the head of

        security deposit totaling to a sum of Rs.2,61,66,538.62/-, which

        in any view of the matter is a computational error, erroneous on

        the face of the record, hence we direct that the amount awarded

        in favor of the claimant-Respondent by the Ld. Sole Arbitrator

        vide award dated 17.10.2020, pertaining to item No.1 at internal
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       81/119




        page No.17 of the said award would stand corrected as follows:-

                 “(i) The claimant-respondent shall be paid an amount of
                 Rs. 2,61,66,578.62 towards the claimed amount inclusive
                 of security amount.”

        47.     It is a well-settled law that an Appellate Court cannot re-

        appreciate the evidence. In the present case the bills submitted

        by the claimant before the Ld. Sole Arbitrator along with the

        statement of claim have been marked as Annexure-C-2 to C-35,

        however the same have not been refuted by the appellants,

        inasmuch as they did not file any affidavit of admission / denial

        of documents of the claimant-Respondent before the Ld. Sole

        Arbitrator, hence all the bills filed by the claimant before the Ld.

        Sole Arbitrator would be deemed to have been accepted by the

        appellants to be correct except to the extent of deduction of

        detention bill from various bills, as aforesaid.

        48.     At this stage, we may hasten to add that an Arbitrator has

        to act within the ambit of the contract, as has been held in the

        case of Jayesh H. Pandya vs. Subhtex (India) Ltd. & Others,

        reported in (2020) 17 SCC 383. In yet another judgement

        rendered by the Hon’ble Apex Court in the case of SEPCO

        Electric Power Construction Corporation (supra), it has been

        held that the Arbitrator lacks the power to deviate from or to re-
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       82/119




        interpret the terms of the contract while making an award, the

        award must be within the parameters of the agreement entered

        into between the parties and the arbitrator is restricted to the

        terms of the contract and cannot go outside its scope.

        49.      In one another judgment rendered by the Hon’ble Apex

        Court in the case of State of Rajasthan vs. Nav Bharat

        Construction Co., reported in (2006) 1 SCC 86, it has been held

        that an Arbitrator cannot go beyond the terms of the contract

        and when an agreement has been filed in the Court and order of

        reference has been made then the claim has to be limited to that

        relief and the Arbitrator cannot enlarge the scope of reference.

        50.     The other issue which arises for consideration in the

        present case is regarding award of compensation to the tune of

        Rs. 25 lakhs under Section 54 of the Indian Contract Act. The

        findings of the learned Arbitrator in this regard can be found at

        internal page No.17 of the award dated 17.10.2020, which is

        reproduced herein below:-

                 “Since the contract between the parties consists of
                 reciprocal promises, in the circumstances of the case, in
                 view of the delayed payments causing wrongful loss to
                 the claimant-petitioner, the claimant-petitioner shall be
                 paid compensation amount of Rs. 45 lakhs (modified to
                 Rs. 25 lakhs vide order dated 13.11.2020) only as per
                 Section 54 of the Indian Contract Act.”
        51.     A bare perusal of the entire award rendered by the learned
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       83/119




        Sole Arbitrator dated 17.10.2020 would show that the prayer of

        the claimant-respondent to declare the termination of agreement,

        forfeiture of security deposit and invocation of bank guarantee

        vide order dated 23.05.2019, issued by the Managing Director,

        BSFC, Patna to be inoperative, illegal, unjustified and contrary

        to the terms of the agreement, has not been allowed by the

        learned Arbitrator and the only finding arrived at by the learned

        Arbitrator is that the claimant cannot be saddled with any

        liability for any deduction of the amount on account of theft and

        institution of FIR and after deduction of the detention bills, the

        outstanding claim of the claimant-respondent on the head of

        outstanding bills has been allowed.

        52.     Now, it would be apt to refer to the pleadings made by the

        claimant-respondent in the statement of claims filed before the

        learned Arbitrator on the aforesaid aspect of the matter, which is

        contained in paragraph Nos. 18 and 19 thereof and the same is

        being reproduced herein below:-

                 “18. That the termination of agreement vide order
                 contained in Memo No. 681 dated 23.05.2019 issued
                 under the signature of Managing Director of the
                 Corporation (contained in Annexure C-49) is illegal,
                 unjustified and contrary to the terms of the agreement.
                 19. That due to premature termination of the contract by
                 the respondent contained in Annexure-C-49 the claimant/
                 petitioner has suffered a loss of Rs. 21,00,000/- (Rupees
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       84/119




                 twenty one lakh) as the claimant/petitioner was
                 prevented from transporting the food grains for about
                 seven (07) months during the validity period of
                 agreement. The claimant/petitioner has to incur losses
                 due to unjustifiable reasons of the detention of trucks at
                 the time of unloading for which bills have been
                 submitted. Idling charges has been calculated at the rate
                 of Rs. 1,000/ per day for 6 wheels truck, Rs. 1,500/- per
                 day for 10 wheels truck, Rs. 2,000/- per day as idling
                 charges per truck for 12 wheels truck besides GPS Load
                 Cell rent.”
        53.     In the supplementary statement of claim, while the

        aforesaid claim of loss of Rs. 21 lakhs has been reiterated, it has

        been further stated that the trucks hired by the claimant-

        respondent had remained idle, leading to him having paid

        charges to the respective truck owners for ideal period of total

        seven months i.e. May, 2019 to November, 2019, apart from the

        claimant having incurred a sum of Rs.1,50,000/- on the head of

        travelling expenses for travelling to Patna to attend the arbitral

        proceedings and a sum of Rs.1,60,000/- on the head of the fees

        of his learned Advocate. The law with regard to claim of loss of

        profit and award of compensation is no longer res integra. In

        this regard, we would first refer to a judgement rendered by the

        Hon’ble Apex Court in the case of Unibros vs. All India Radio,

        reported in 2023 SCC Online SC 1366, paragraph Nos. 15 to

        21 whereof are reproduced herein below:-

                 “15. Considering the aforesaid reasons, even though
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       85/119




                 little else remains to be decided, we would like to briefly
                 address the appellant's claim of loss of profit. In Bharat
                 Cooking Coal (supra), this Court reaffirmed the
                 principle that a claim for such loss of profit will only be
                 considered when supported by adequate evidence. It was
                 observed:
                  “24. … It is not unusual for the contractors to claim
                  loss of profit arising out of diminution in turnover on
                  account of delay in the matter of completion of the
                  work. What he should establish in such a situation is
                  that had he received the amount due under the
                  contract, he could have utilised the same for some
                  other business in which he could have earned profit.
                  Unless such a plea is raised and established, claim for
                  loss of profits could not have been granted. In this case,
                  no such material is available on record. In the absence
                  of any evidence, the arbitrator could not have awarded
                  the same.”
                                                             (emphasis ours)

                 16. To support a claim for loss of profit arising from a
                 delayed contract or missed opportunities from other
                 available contracts that the appellant could have earned
                 elsewhere by taking up any, it becomes imperative for the
                 claimant to substantiate the presence of a viable
                 opportunity through compelling evidence. This evidence
                 should convincingly demonstrate that had the contract
                 been executed promptly, the contractor could have
                 secured supplementary profits utilizing its existing
                 resources elsewhere.
                 17. One might ask, what would be the nature and quality
                 of such evidence? In our opinion, it will be contingent
                 upon the facts and circumstances of each case. However,
                 it may generally include independent contemporaneous
                 evidence such as other potential projects that the
                 contractor had in the pipeline that could have been
                 undertaken if not for the delays, the total number of
                 tendering opportunities that the contractor received and
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       86/119




                 declined owing to the prolongation of the contract,
                 financial statements, or any clauses in the contract
                 related to delays, extensions of time, and compensation
                 for loss of profit. While this list is not exhaustive and
                 may include any other piece of evidence that the court
                 may find relevant, what is cut and dried is that in
                 adjudging a claim towards loss of profits, the court may
                 not make a guess in the dark; the credibility of the
                 evidence, therefore, is the evidence of the credibility of
                 such claim.
                 18. Hudson's formula, while attained acceptability and is
                 well understood in trade, does not, however, apply in a
                 vacuum. Hudson's formula, as well as other methods
                 used to calculate claims for loss of off-site overheads
                 and profit, do not directly measure the contractor's exact
                 costs. Instead, they provide an estimate of the losses the
                 contractor may have suffered. While these formulae are
                 helpful when needed, they alone cannot prove the
                 contractor's loss of profit. They are useful in assessing
                 losses, but only if the contractor has shown with
                 evidence the loss of profits and opportunities it suffered
                 owing to the prolongation.
                 19. The law, as it should stand thus, is that for claims
                 related to loss of profit, profitability or opportunities to
                 succeed, one would be required to establish the following
                 conditions : first, there was a delay in the completion of
                 the contract; second, such delay is not attributable to the
                 claimant; third, the claimant's status as an established
                 contractor, handling substantial projects; and fourth,
                 credible evidence to substantiate the claim of loss of
                 profitability. On perusal of the records, we are satisfied
                 that the fourth condition, namely, the evidence to
                 substantiate the claim of loss of profitability remains
                 unfulfilled in the present case.
                 20. The First Award was interfered with by the High
                 Court for the reasons noted above. The Arbitrator, in
                 view of such previous determination made by the High
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       87/119




                 Court, could have granted damages to the appellant
                 based on the evidence on record. There was, so to say,
                 none which on proof could have translated into an award
                 for damages towards loss of profit. A claim for damages,
                 whether general or special, cannot as a matter of course
                 result in an award without proof of the claimant having
                 suffered injury. The arbitral award in question, in our
                 opinion, is patently illegal in that it is based on no
                 evidence and is, thus, outrightly perverse; therefore,
                 again, it is in conflict with the “public policy of India”
                 as contemplated by section 34(2)(b) of the Act.
                 21. For the reasons aforesaid, we find no merit in this
                 appeal. The same stands dismissed. However, cost
                 awarded by the learned Single Judge is made easy.”
        54.     Yet another judgment on the aforesaid issue is the one

        rendered by the Hon’ble High Court of Bombay in the case of

        Hindustan Petroleum Corporation Ltd., Mumbai vs. Batliboi

        Environmental Engineers Ltd, Mumbai and Another, reported

        in (2007) SCC OnLine BOM 1016, paragraph Nos. 14, 21, 22,

        26, 27, 28 and 29 whereof are reproduced herein below:-

                 “14. Arbitrator is creation of the contract between the
                 parties and he gets jurisdiction under the terms of
                 contract. He is expected to interpret and apply
                 provisions of the contract and pass an award
                 accordingly. While passing the award he has to bear in
                 mind the provisions of section 28 of the Act, which
                 clearly provides that in case of domestic arbitration in
                 India, the Arbitral Tribunal shall decide the dispute in
                 accordance with substantive law for the time in force in
                 India. If the Arbitrator ignores the substantive law in
                 force in India and passes an award, it is bound to cause
                 injustice and is liable to be set aside. For example law
                 requires that the claim should be within limitation. If the
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       88/119




                 award is passed on a claim, which is clearly barred by
                 the limitation, that will be against the provisions of law
                 and the award cannot be sustained. In the present case,
                 it is the contention of the petitioner that the learned
                 Arbitrator ignored the terms of the contract, relevant
                 documents as well as the provisions of section 55 of the
                 Contract Act and, therefore, the award is liable to be set
                 aside. It will be necessary to examine the record to find
                 out in the light of this contention.
                 21. Section 55 of the Contract Act reads as follows:
                   “55. Effect of failure to perform at fixed time, in
                   contract in which time is essential.—
                   When a party to a contract promises to do a certain
                   thing at or before a specified time, or certain things at
                   or before specified times, and fails to do any such thing
                   at or before the specified time, the contract, or so much
                   of it as has not been performed, becomes voidable at
                   the option of the promisee, if the intention of the
                   parties was that time should be of the essence of the
                   contract.”
                   Effect of such failure when time is not essential.
                   If it was not the intention of the parties that time
                   should be of the essence of the contract, the contract
                   does not become voidable by the failure to do such
                   thing at or before the specified time; but the promisee
                   is entitled to compensation from the promisor for any
                   loss occasioned to him by such failure.
                   Effect of acceptance of performance at time other than
                   that agreed upon. If, in case of a contract voidable on
                   account of the promisor's failure to perform his
                   promise at the time agreed, the promisee accepts
                   performance of such promise at any time other than
                   that agreed, the promisee cannot claim compensation
                   for any loss occasioned by the non-performance of the
                   promise at the time agreed, unless at the time of such
                   acceptance he gives notice to the promisor of his
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       89/119




                   intention to do so.”
                 22. From this it is clear that if the promisor had accepted
                 the performance of the contract beyond the expiry of the
                 time fixed for the same, he cannot claim compensation
                 for any loss occasioned by the non-performance of the
                 terms at the time agreed unless at the time of such
                 acceptance, he gives notice to the promisor of his
                 intention to claim compensation for the delay.
                 26. It is material to note that total cost of the work was
                 Rs. 474 lakhs and 80% of the work was admittedly
                 completed for which the payment was also made. Thus,
                 when the work was stopped or abandoned by the
                 contractor, only 20% of the work was remaining and the
                 cost of the 20% work was only Rs. 114.80 lakhs. If the
                 contractor would have completed the work, he would be
                 entitled to receive Rs. 114.80 lakhs and according to his
                 own contention and as per the assessment made by the
                 arbitrator, he would be getting 10% on account of
                 overheads and 10% on account of profits. Thus, the gain
                 of the contractor would be 20% of the said amount,
                 which would be only Rs. 22.96 lakhs. Against this the
                 Arbitrator awarded Rs. 1,57,37,666/- which is much
                 more than 20% of even the total contract money and,
                 therefore, it can be said that compensation awarded by
                 the arbitrator was infact arbitrary against the terms of
                 the contract and perverse and, therefore, it may be held
                 that he acted beyond his jurisdiction. It cannot be termed
                 as a mere error within jurisdiction.
                 27. The arbitrator also awarded amount of Rs. 12 lakhs
                 towards compensation for idle machinery and equipment
                 for a period of 24 months at the rate of Rs. 50,000/- per
                 month. According to the Arbitrator it is based on the
                 inspection visit to the site. The petitioner has rightly
                 pointed out that no such site inspection report is
                 available on record nor it is made available to the
                 parties. There is no valid reason for grant of this award.
                 28. The learned Arbitrator also awarded compensation
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       90/119




                 of Rs. 1,95,000/- for extra work. In fact, there is no
                 record to show that the contractor had issued any notice
                 to the petitioner about any such extra work, nor there is
                 any oral or documentary evidence to support this claim.
                 29. Taking into consideration the terms of the contract,
                 legal provisions and the award passed by the learned
                 Arbitrator, it is clear that the award is clearly against the
                 terms of the contract, provisions of law and infact, it is
                 perverse and cannot stand judicial scrutiny. In our
                 considered opinion, the award is liable to be set aside. At
                 the same time, we may also note that the petitioner is
                 also not entitled to any counter-claim on account of any
                 delays on the part of the contractor as the petitioner had
                 extended time on request of the contractor and that too
                 without indicating that the petitioner would claim any
                 compensation as required under section 55 of the
                 Contract Act. Though there was provision in terms of the
                 contract for liquidated damages, in fact as pointed out
                 above, the petitioner also could not establish that delay
                 was only on account of the contractor. In view of the
                 above, the appeal deserves to be allowed & the
                 impugned judgment and the award are liable to be set
                 aside.
        55.     The aforesaid judgement rendered in the case of Batliboi

        Environmental Engineers Ltd. (supra) by the Hon’ble High

        Court of Bombay has been upheld by a judgment rendered by

        the Hon’ble Apex Court in the case of Batliboi Environmental

        Engineers Limited vs. Hindustan Petroleum Corporation

        Limited and Another, reported in (2024) 2 SCC 375, paragraph

        Nos. 23, 44, 45 and 47 whereof are reproduced herein below:-

                 “23. Ordinarily, when the completion of a contract is
                 delayed and the contractor claims that s/he has suffered
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       91/119




                 a loss arising from depletion of her/his income from the
                 job and hence turnover of her/his business, and also for
                 the overheads in the form of workforce expenses which
                 could have been deployed in other contracts, the claims
                 to bear any persuasion before the arbitrator or a court of
                 law, the builder/contractor has to prove that there was
                 other work available that he would have secured if not
                 for the delay, by producing invitations to tender which
                 was declined due to insufficient capacity to undertake
                 other work. The same may also be proven from the books
                 of accounts to demonstrate a drop in turnover and
                 establish that this result is from the particular delay
                 rather than from extraneous causes. If loss of turnover
                 resulting from delay is not established, it is merely a
                 delay in receipt of money, and as such, the builder/
                 contractor is only entitled to interest on the capital
                 employed and not the profit, which should be paid.
                 44. The decision of this Court in Associate Builders
                 [(2015) 3 SCC 49] elaborately examined the question of
                 public policy in the context of Section 34 of the A&C Act,
                 specifically under the head “fundamental policy of
                 Indian law”. It was firstly held that the principle of
                 judicial approach demands a decision to be fair,
                 reasonable and objective. On the obverse side, anything
                 arbitrary and whimsical would not satisfy the said
                 requirement.
                 45. Referring to the third principle in Western Geco
                 [ONGC Ltd. v. Western Geco International Ltd., (2014) 9
                 SCC 263], it was explained that the decision would be
                 irrational and perverse if (a) it is based on no evidence;
                 (b) if the Arbitral Tribunal takes into account something
                 irrelevant to the decision which it arrives at; or (c)
                 ignores vital evidence in arriving at its decision. The
                 standards prescribed in State of Haryana v. Gopi Nath &
                 Sons [1992 Supp (2) SCC 312] (for short Gopi Nath &
                 Sons) and Kuldeep Singh v. Delhi Police [(1999) 2 SCC
                 10] should be applied and relied upon, as good working
                 tests of perversity. In Gopi Nath & Sons [1992 Supp (2)
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       92/119




                 SCC 312] it has been held that apart from the cases
                 where a finding of fact is arrived at by ignoring or
                 excluding relevant materials or taking into consideration
                 irrelevant material, the finding is perverse and infirm in
                 law when it outrageously defies logic as to suffer from
                 vice of irrationality. Kuldeep Singh [Kuldeep Singh v.
                 Delhi Police, (1999) 2 SCC 10] clarifies that a finding is
                 perverse when it is based on no evidence or evidence
                 which is thoroughly unreliable and no reasonable person
                 would act upon it. If there is some evidence which can be
                 acted and can be relied upon, however compendious it
                 may be, the conclusion should not be treated as perverse.
                 This Court in Associate Builders [(2015) 3 SCC 49]
                 emphasised that the public policy test to an arbitral
                 award does not give jurisdiction to the court to act as a
                 court of appeal and consequently errors of fact cannot
                 be corrected. Arbitral Tribunal is the ultimate master of
                 quality and quantity of evidence. An award based on
                 little evidence or no evidence, which does not measure
                 up in quality to a trained legal mind would not be held to
                 be invalid on this score. Every arbitrator need not
                 necessarily be a person trained in law as a Judge. At
                 times, decisions are taken acting on equity and such
                 decisions can be just and fair should not be overturned
                 under Section 34 of the A&C Act on the ground that the
                 arbitrator's approach was arbitrary or capricious.
                 Referring to the third ground of public policy, justice or
                 morality, it is observed that these are two different
                 concepts. An award is against justice when it shocks the
                 conscience of the court, as in an example where the
                 claimant has restricted his claim but the Arbitral
                 Tribunal has awarded a higher amount without any
                 reasonable ground of justification. Morality would
                 necessarily cover agreements that are illegal and also
                 those which cannot be enforced given the prevailing
                 mores of the day. Here again interference would be only
                 if something shocks the court's conscience. Further,
                 “patent illegality” refers to three sub-heads: (a)
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       93/119




                 contravention of substantive law of India, which must be
                 restricted and limited such that the illegality must go to
                 the root of the matter and should not be of a trivial
                 nature. Reference in this regard was made to clause (a)
                 to Section 28(1) of the A&C Act, which states that the
                 dispute submitted to arbitration under Part I shall be in
                 accordance with the substantive law for the time being in
                 force. The second sub-head would be when the arbitrator
                 gives no reasons in the award in contravention with
                 Section 31(3) of the A&C Act. The third sub-head deals
                 with contravention of Section 28(3) of the A&C Act
                 which states that the Arbitral Tribunal shall decide all
                 cases in accordance with the terms of the contract and
                 shall take into account the usage of the trade applicable
                 to the transaction. This last sub-head should be
                 understood with a caveat that the arbitrator has the right
                 to construe and interpret the terms of the contract in a
                 reasonable manner. Such interpretation should not be a
                 ground to set aside the award, as the construction of the
                 terms of the contract is finally for the arbitrator to
                 decide. The award can be only set aside under this sub-
                 head if the arbitrator construes the award in a way that
                 no fair-minded or reasonable person would do.
                 47. We have extensively analysed the award, its patent
                 flaws and illegalities which emanate from it, like the
                 manifest lack of reasoning in arriving at the conclusions
                 and the calculation of amounts awarded, which, in fact,
                 amount to double or part-double payments, besides
                 being contradictory, etc. In view of our aforesaid
                 reasoning, the award has been rightly held [Hindustan
                 Petroleum Corpn. Ltd. v. Batliboi Environmental
                 Engineers Ltd., 2007 SCC OnLine Bom 1016] to be
                 unsustainable and set aside by the Division Bench of the
                 High Court exercising power and jurisdiction under
                 Section 37 read with Section 34 of the A&C Act.”
        56.     We may, at this juncture also quote Section 54 of the

        Indian Contracts Act, 1872 herein below:-
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       94/119




                 “54. Effect of default as to that promise which should
                 be first performed, in contract consisting of reciprocal
                 promises—When a contract consists of reciprocal
                 promises, such that one of them cannot be performed, or
                 that its performance cannot be claimed till the other has
                 been performed, and the promisor of the promise last
                 mentioned fails to perform it, such promisor cannot
                 claim the performance of the reciprocal promise, and
                 must make compensation to the other party to the
                 contract for any loss which such other party may sustain
                 by the non-performance of the contract.”
        57.     Now coming back to the facts of the present case, we find

        that the claimant-respondent has claimed a sum of Rs.21 lakhs

        by way of compensation on the ground that he has suffered a

        loss to the said extent since he was prevented from transporting

        the food grains for about seven months during the validity

        period of agreement on account of premature termination of the

        contract/agreement by the appellants as well as on account of

        detention of trucks. In this context, we find that first of all the

        learned Arbitrator has not granted any relief to the petitioner as

        far as the order dated 23.05.2019, issued by the Managing

        Director, BSFC, Patna terminating the agreement in question is

        concerned, hence unless and until the premature termination of

        the contract/agreement by the appellants is set aside, the

        claimant-respondent is not entitled to claim any compensation

        on account of the loss suffered due to premature termination of

        the contract.
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       95/119




        58.     It is yet another aspect of the matter that the claimant-

        respondent has failed to bring on record credible evidence to

        substantiate the claim of loss of profitability and has in an ad

        hoc manner averred in the statement of claim that a loss of Rs.

        21 lakhs has been incurred on account of idling/detention of

        trucks which in any view of the matter is barred under Clause 22

        of the Agreement dated 24.10.2016, as has already been held by

        the learned Arbitrator, which has been referred to hereinabove in

        the preceding paragraphs. Thus, there is no proof much less any

        evidence whatsoever, on the records of the arbitral proceedings

        regarding the claimant-respondent having suffered any loss or

        injury, hence the award of compensation to the tune of Rs.25

        lakhs is based on no evidence, thus is outrightly perverse, hence

        is set aside. This aspect of the matter stands fully covered by the

        judgement rendered by the Hon’ble Apex Court in the case of

        Unibors (supra).

        59.     The other issue, which arises for consideration is the

        award of interest by the Ld. Sole Arbitrator vide arbitral award

        dated 17.10.2020 in the following manner:-

                 “The claimant-petitioner shall be entitled to simple
                 interest at the rate of 10 per cent per annum from
                 13.9.2019 till the date of award and further 18 per cent
                 interest over awarded sum from the date of award till
                 realization over the awarded amount.”
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       96/119




        60.     The findings of the Ld. Sole Arbitrator with regard to the

        aforesaid aspect of the matter is as follows:-

                 “The claimant petitioner has claimed interest @ 18%
                 per annum upto the date of actual receipt of awarded
                 amount. Section 3 of the Interest Act does not provide
                 grant of interest @18% per annum.
                       The Arbitrator shall follow the provision of Section
                 31(7) (a) of the Arbitration and Conciliation Act 1996 as
                 amended in granting interest. It may be stated that
                 interest upon the interest is not payable. The Arbitrator
                 does not consider it proper to grant 18% interest on the
                 interim bills as made out in the tabular statement
                 (Annex-C-63). The Arbitrator shall grant interest on the
                 awarded amount during the pendency of the proceeding
                 and upon making the award.”
        61.     Thus, we find that the Ld. Sole Arbitrator vide arbitral

        award dated 17.10.2020 has awarded interest pendente lite as

        also interest from the date of award till realization of the

        awarded amount. The law in this regard is no longer res integra,

        inasmuch as the Hon’ble Apex Court has repeatedly held that if

        the arbitration agreement or the contract itself provides for

        interest, the Arbitrator would have the jurisdiction to award

        interest, however when the agreement expressly provides that

        no interest pendente lite shall be payable on the amount due, the

        Arbitrator has no power to award pendente lite interest.

        Reference in this connection be had to the judgments rendered

        by the Hon’ble Apex Court in the case of Ambica Construction
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       97/119




        (supra) and the one rendered in the case of GC Roy (supra). In

        this regard, we would also refer to a judgment rendered by the

        Hon’ble Apex Court in the case of Union of India & Ors. vs.

        Larsen & Tubro Limited (L&T), reported in 2026 SCC Online

        SC 327, para nos. 29, 31, 34, 36, 38, 40, 43, 45, 46, 47, 48, 52,

        53, 55, 56, 59, 61 and 62 whereof are reproduced herein below:-

                 “29. We have heard learned counsel for the parties and
                 perused the material placed on record. The following
                 issues are raised for our consideration:—
                  A. Whether the AT is justified in awarding pre-
                  award/pendente lite interest, by way of compensation,
                  while passing the award in favour of the respondent-
                  claimant, and more particularly in view of Clause
                  16(3) and Clause 64(5) of GCC.
                  B. Whether the AT is justified in awarding post award
                  interest in favour of the respondent-claimant.
                  C. Whether the Courts below committed any error
                  while dealing with Issue (A) and Issue (B) referred
                  hereinabove while exercising the powers under Section
                  34 and Section 37 of the Act.
                 31. Clause 16(3) of the GCC reads as under:
                  “no interest will be payable upon the Earnest Money
                  and Security Deposit or amounts payable to the
                  Contractor under the Contract, but Government
                  Securities deposited in terms of Sub-Clause (1) of this
                  clause will be payable with interest accrued thereon”.
                 34. Section 31(7)(a) and 31(7)(b) further clarifies that
                 the power of the arbitral tribunal to award interest,
                 which reads as under:—
                  “31. Form and contents of arbitral award.—
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       98/119




                  ………….
                  (7) (a) Unless otherwise agreed by the parties, where
                  and in so far as an arbitral award is for the payment of
                  money, the arbitral tribunal may include in the sum for
                  which the award is made interest, at such rate as it
                  deems reasonable, on the whole or any part of the
                  money, for the whole or any part of the period between
                  the date on which the cause of action arose and the
                  date on which the award is made.”
                  (b) A sum directed to be paid by an arbitral award
                  shall, unless the award otherwise directs, carry interest
                  at the rate of two per cent. higher than the current rate
                  of interest prevalent on the date of award, from the date
                  of award to the date of payment.
                  Explanation.—The expression “current rate of
                  interest” shall have the same meaning as assigned to it
                  under clause (b) of section 2 of the Interest Act, 1978
                  (14 of 1978).”
                 36. In the present case, Clause 16(3) of the GCC, as
                 referred hereinabove, expressly stipulates that no interest
                 will be payable upon earnest money and security
                 deposits or amounts payable to the contractor under the
                 contract.
                 38. This Court in the decision rendered in the case of
                 Manraj Enterprises (supra) has considered a similar
                 submission canvassed on behalf of the party concerned
                 and thereafter observed and held in para 12.1 as under:
                  “12.1. It is required to be noted that Clause 16(1) is
                  with respect to earnest money/security deposit.
                  However, Clause 16(2) is specifically with respect to
                  interest payable upon the earnest money or the security
                  deposit or amounts payable to the contractor under the
                  contract. The words used in Clause 16(2) is “or”.
                  Therefore, the expression “amounts payable to the
                  contractor under the contract” cannot be read in
                  conjunction with “earnest money deposit” or “security
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       99/119




                  deposit” by applying the principle of ejusdem generis.
                  The expression “amounts payable to the contractor
                  under the contract” has to be read independently and
                  disjunctively to earnest money deposit and security
                  deposit as the word used is “or” and not “and”
                  between “earnest money deposit”, “security deposit”
                  and “amounts payable to the contractor under the
                  contract”. Therefore, the principle of ejusdem generis
                  is not applicable in the present case.”
                 40. At this stage, we would also like to refer to the
                 decision rendered by a three-judge bench of this Court in
                 Bright Power Projects (India) (P) Ltd. (supra), wherein
                 in para 10, 11 and 13, it was held as under:
                  “10. Thus, it had been specifically understood between
                  the parties that no interest was to be paid on the
                  earnest money, security deposit and the amount
                  payable to the contractor under the contract. So far as
                  payment of interest on government securities, which
                  had been deposited by the respondent contractor with
                  the appellant is concerned, it was specifically stated
                  that the said amount was to be returned to the
                  contractor along with interest accrued thereon, but so
                  far as payment of interest on the amount payable to the
                  contractor under the contract was concerned, there
                  was a specific term that no interest was to be paid
                  thereon.
                  11. When parties to the contract had agreed to the fact
                  that interest would not be awarded on the amount
                  payable to the contractor under the contract, in our
                  opinion, they were bound by their understanding.
                  Having once agreed that the contractor would not
                  claim any interest on the amount to be paid under the
                  contract, he could not have claimed interest either
                  before a civil court or before an Arbitral Tribunal.
                  ………….
                  13. Section 31(7) of the Act, by using the words “unless
                  otherwise agreed by the parties”, categorically
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       100/119




                  specifies that the arbitrator is bound by the terms of the
                  contract so far as award of interest from the date of
                  cause of action to date of the award is concerned.
                  Therefore, where the parties had agreed that no interest
                  shall be payable, the Arbitral Tribunal cannot award
                  interest.”
                 43. Now, at this stage, it is pertinent to observe that this
                 Court, thereafter, in the case of Manraj Enterprises
                 (supra) had an occasion to consider similar issues
                 involved in the present matter and had considered all the
                 aforementioned decisions, including the decisions
                 rendered in the cases of Bright Power Projects (India)
                 (P) Ltd. (supra), Raveechee and Company (supra) and
                 Ambica Construction v. Union of India, (2017) 14 SCC
                 323 (a three-judge bench judgment of this Court). After
                 considering the aforesaid decisions as well as several
                 other decisions referred on the issue, this Court has
                 observed in para 8 and 11 as under:
                  “8. After considering various decisions on award of
                  interest pendente lite and the future interest by the
                  arbitrator and after discussing the decisions of this
                  Court in Ambica Construction v. Union of India
                  [Ambica Construction v. Union of India, (2017) 14
                  SCC 323 : (2018) 1 SCC (Civ) 257] and Raveechee &
                  Co. [Raveechee & Co. v. Union of India, (2018) 7 SCC
                  664 : (2018) 3 SCC (Civ) 711] and other decisions on
                  the point, this Court has observed in paras 9 to 18 as
                  under: (Garg Builders [Garg Builders v. BHEL, (2022)
                  11 SCC 697], SCC paras 9-19)
                  “9. On the other hand, Mr. Pallav Kumar, learned
                  counsel for the respondent, submitted that Section
                  31(7)(a) of the 1996 Act gives paramount importance
                  to the contract entered into between the parties and
                  categorically restricts the power of an arbitrator to
                  award pre-reference and pendente lite interest when the
                  parties themselves have agreed to the contrary. He
                  argued that if the contract itself contains a specific
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       101/119




                  clause which expressly bars the payment of interest,
                  then it is not open for the arbitrator to grant pendente
                  lite interest. It was further argued that Ambica
                  Construction [Ambica Construction v. Union of India,
                  (2017) 14 SCC 323 : (2018) 1 SCC (Civ) 257] is not
                  applicable to the instant case because it was decided
                  under the Arbitration Act, 1940 whereas the instant
                  case falls under the 1996 Act. It was further argued
                  that Section 3 of the Interest Act confers power on the
                  court to allow interest in the proceedings for recovery
                  of any debt or damages or in proceedings in which a
                  claim for interest in respect of any debt or damages
                  already paid. However, Section 3(3) of the Interest Act
                  carves out an exception and recognises the right of the
                  parties to contract out of the payment of interest
                  arising out of any debt or damages and sanctifies
                  contracts which bars the payment of interest arising out
                  of debt or damages. Therefore, Clause 17 of the
                  contract is not violative of any the provisions of the
                  Contract Act, 1872. In light of the arguments advanced,
                  the learned counsel prays for dismissal of the appeal.
                  10. We have carefully considered the submissions of the
                  learned counsel for both the parties made at the Bar.
                  The law relating to award of pendente lite interest by
                  arbitrator under the 1996 Act is no longer res integra.
                  The provisions of the 1996 Act give paramount
                  importance to the contract entered into between the
                  parties and categorically restricts the power of an
                  arbitrator to award pre-reference and pendente lite
                  interest when the parties themselves have agreed to the
                  contrary.
                  11. Section 31(7)(a) of the 1996 Act which deals with
                  the payment of interest is as under:
                  ‘31.(7)(a) Unless otherwise agreed by the parties,
                  where and insofar as an arbitral award is for the
                  payment of money, the Arbitral Tribunal may include in
                  the sum for which the award is made interest, at such
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       102/119




                  rate as it deems reasonable, on the whole or any part of
                  the money, for the whole or any part of the period
                  between the date on which the cause of action arose
                  and the date on which the award is made.’
                  12. It is clear from the above provision that if the
                  contract prohibits pre-reference and pendente lite
                  interest, the arbitrator cannot award interest for the
                  said period. In the present case, clause barring interest
                  is very clear and categorical. It uses the expression
                  “any moneys due to the contractor” by the employer
                  which includes the amount awarded by the arbitrator.
                  13. In Sayeed Ahmed & Co. v. State of U.P. [Sayeed
                  Ahmed & Co. v. State of U.P., (2009) 12 SCC 26 :
                  (2009) 4 SCC (Civ) 629], this Court has held that a
                  provision has been made under Section 31(7)(a) of the
                  1996 Act in relation to the power of the arbitrator to
                  award interest. As per this section, if the contract bars
                  payment of interest, the arbitrator cannot award
                  interest from the date of cause of action till the date of
                  award.
                  14. In Sree Kamatchi Amman Constructions v.
                  Railways [Sree Kamatchi Amman Constructions v.
                  Railways, (2010) 8 SCC 767 : (2010) 3 SCC (Civ)
                  575], it was held by this Court that where the parties
                  had agreed that the interest shall not be payable, the
                  Arbitral Tribunal cannot award interest between the
                  date on which the cause of action arose to the date of
                  the award.
                  15. BHEL v. Globe Hi-Fabs Ltd. [(2015) 5 SCC 718],
                  is an identical case where this Court has held as
                  under : (SCC p. 723, para 16)
                  ‘16. In the present case we noticed that the clause
                  barring interest is very widely worded. It uses the
                  words “any amount due to the contractor by the
                  employer”. In our opinion, these words cannot be read
                  as ejusdem generis along with the earlier words
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       103/119




                  “earnest money” or “security deposit”.’
                  16. In Chittaranjan Maity v. Union of India [ (2017) 9
                  SCC 611], it was categorically held that if a contract
                  prohibits award of interest for pre-award period, the
                  arbitrator cannot award interest for the said period.
                  17. Therefore, if the contract contains a specific clause
                  which expressly bars payment of interest, then it is not
                  open for the arbitrator to grant pendente lite interest.
                  The judgment on which reliance was placed by the
                  learned counsel for the appellant in Ambica
                  Construction [Ambica Construction v. Union of India,
                  (2017) 14 SCC 323 : (2018) 1 SCC (Civ) 257] has no
                  application to the instant case because Ambica
                  Construction [Ambica Construction v. Union of India,
                  (2017) 14 SCC 323 : (2018) 1 SCC (Civ) 257] was
                  decided under the Arbitration Act, 1940 whereas the
                  instant case falls under the 1996 Act. This has been
                  clarified in Chittaranjan Maity [Chittaranjan Maity v.
                  Union of India, (2017) 9 SCC 611 : (2017) 4 SCC (Civ)
                  693] as under: (SCC p. 616, para 16)
                  ‘16. Relying on a decision of this Court in Ambica
                  Construction v. Union of India [Ambica Construction v.
                  Union of India, (2017) 14 SCC 323 : (2018) 1 SCC
                  (Civ) 257], the learned Senior Counsel for the
                  appellant submits that mere bar to award interest on
                  the amounts payable under the contract would not be
                  sufficient to deny payment on pendente lite interest.
                  Therefore, the arbitrator was justified in awarding the
                  pendente lite interest. However, it is not clear from
                  Ambica Construction [(2017) 14 SCC 323] as to
                  whether it was decided under the Arbitration Act, 1940
                  (for short “the 1940 Act”) or under the 1996 Act. It has
                  relied on a judgment of Constitution Bench in
                  Irrigation Deptt., State of Orissa v. G. C. Roy [(1992) 1
                  SCC 508]. This judgment was with reference to the
                  1940 Act. In the 1940 Act, there was no provision
                  which prohibited the arbitrator from awarding interest
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       104/119




                  for the pre-reference, pendente lite or post-award
                  period, whereas the 1996 Act contains a specific
                  provision which says that if the agreement prohibits
                  award of interest for the pre-award period, the
                  arbitrator cannot award interest for the said period.
                  Therefore, the decision in Ambica Construction cannot
                  be made applicable to the instant case.’
                  18. The decision in Raveechee & Co. [Raveechee &
                  Co. v. Union of India, (2018) 7 SCC 664] relied on by
                  the learned counsel for the appellant is again under the
                  Arbitration Act, 1940 which has no application to the
                  facts of the present case.
                  19. Having regard to the above, we are of the view that
                  the High Court [Garg Builders v. BHEL, 2017 SCC
                  OnLine Del 12871] was justified in rejecting the claim
                  of the appellant seeking pendente lite interest on the
                  award amount.”
                  ……………
                  11. In the said decision in Bright Power Projects
                  [Union of India v. Bright Power Projects (India) (P)
                  Ltd., (2015) 9 SCC 695 : (2015) 4 SCC (Civ) 702], this
                  Court also considered Section 31(7)(a) of the 1996 Act.
                  It is specifically observed and held that Section 31(7) of
                  the 1996 Act, by using the words “unless otherwise
                  agreed by the parties” categorically specifies that the
                  arbitrator is bound by the terms of the contract insofar
                  as award of interest from the date of cause of action to
                  date of the award is concerned. It is further observed
                  and held that where the parties had agreed that no
                  interest shall be payable, the Arbitral Tribunal cannot
                  award interest. Thus, the aforesaid decision of a three-
                  Judge Bench of this Court is the answer to the
                  submission made on behalf of the respondent that
                  despite the bar under Clause 16(2) which is applicable
                  to the parties, the Arbitral Tribunal is not bound by the
                  same. Therefore, the contention raised on behalf of the
                  respondent that dehors the bar under Clause 16(2), the
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       105/119




                  Arbitral Tribunal independently and on equitable
                  ground and/or to do justice can award interest
                  pendente lite or future interest has no substance and
                  cannot be accepted. Once the contractor agrees that he
                  shall not be entitled to interest on the amounts payable
                  under the contract, including the interest upon the
                  earnest money and the security deposit as mentioned in
                  Clause 16(2) of the agreement/contract between the
                  parties herein, the arbitrator in the arbitration
                  proceedings being the creature of the contract has no
                  power to award interest, contrary to the terms of the
                  agreement/contract between the parties and contrary to
                  Clause 16(2) of the agreement/contract in question in
                  this case.”
                 45. The provisions of the Act of 1996, including
                 provisions contained in Section 31(7)(a) give paramount
                 importance to the contract entered into between the
                 parties and categorically restrict the power of an
                 arbitrator to award pre-award/pendente lite interest
                 when the parties have themselves agreed to the contrary.
                 Thus, the AT cannot award pre-award/pendente lite
                 interest, even in the form of compensation, in view of
                 specific Cl. 16(3) of GCC read with Cl. 64(5) of GCC.
                 46. At this stage, it is also relevant to observe that the AT
                 itself acknowledged this prohibition by rejecting Claim
                 No. 7 seeking pendente lite interest. The relevant
                 paragraph of the Arbitral Award reads as under:—
                  “The Interest so claimed is therefore not admissible as
                  per Section 31(7)(a) of the Act read with Clause 64(5)
                  of the GCC & Clause 7.35 of SCC of the contract
                  agreement signed between the two parties. Tribunal did
                  not therefore consider to award any interest on the
                  award sum as claimed by the Claimant. Therefore,
                  Arbitral Tribunal declare Nil Award against this
                  claim.”
                 47. With regard to the post-award interest, Section 31(7)
                 (b) of the Act provides that unless the award otherwise
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       106/119




                 directs, the sum awarded shall carry interest from the
                 date of the award till payment. The legislative intent
                 underlying this provision is twofold: first, to compensate
                 the successful party for delayed realization of the award,
                 and second, to ensure prompt compliance with the award
                 by the judgment-debtor.
                 48. Recently, this Court in the case of R.P. Garg (supra),
                 has observed and held in para 9, 11 and 12 as under:
                  “9. We are of the opinion that the judgment of High
                  Court is clearly erroneous. Firstly, the interest granted
                  by the First Appellate Court only related to post award
                  period, and therefore, for this period, the agreement
                  between the parties has no bearing. Section 31(7)(b)
                  deals with grant of interest for post award period i.e.,
                  from the date of the award till its realization. The
                  statutory scheme relating to grant of interest provided
                  in Section 31(7) creates a distinction between interest
                  payable before and after the award. So far as the
                  interest before the passing of the award is concerned, it
                  is regulated by Section 31(7)(a) of the Act which
                  provides that the grant of interest shall be subject to the
                  agreement between the parties. This is evident from the
                  specific expression at the commencement of the sub-
                  section which says “unless otherwise agreed by the
                  parties”.
                  …………..
                  11. So far as the entitlement of the post-award interest
                  is concerned, sub-Section (b) of Section 31(7) provides
                  that the sum directed to be paid by the Arbitral
                  Tribunal shall carry interest. The rate of interest can be
                  provided by the Arbitrator and in default the statutory
                  prescription will apply. Clause (b) of Section 31(7) is
                  therefore in contrast with clause (a) and is not subject
                  to party autonomy. In other words, clause (b) does not
                  give the parties the right to “contract out” interest for
                  the post-award period. The expression ‘unless the
                  award otherwise directs’ in Section 31(7)(b) relates to
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       107/119




                  rate of interest and not entitlement of interest. The only
                  distinction made by Section 31(7)(b) is that the rate of
                  interest granted under the Award is to be given
                  precedence over the statutorily prescribed rate. The
                  assumption of the High Court that payment of the
                  interest for the post award period is subject to the
                  contract is a clear error.
                 12. The clear position of law that granting post-award
                 interest is not subject to the contract between the parties
                 was recently affirmed in the decision of this Court in
                 Morgan Securities & Credits (P) Ltd. v. Videocon
                 Industries Ltd.,6 wherein the court observed as follows:
                  “24. The issue before us is whether the phrase “unless
                  the award otherwise directs” in Section 31(7)(b) of the
                  Act only provides the arbitrator the discretion to
                  determine the rate of interest or both the rate of interest
                  and the “sum” it must be paid against. At this juncture,
                  it is crucial to note that both clauses (a) and (b) are
                  qualified. While, clause (a) is qualified by the
                  arbitration agreement, clause (b) is qualified by the
                  arbitration award. However, the placement of the
                  phrases is crucial to their interpretation. The words,
                  “unless otherwise agreed by the parties” occur at the
                  beginning of clause (a) qualifying the entire provision.
                  However, in clause (b), the words, “unless the award
                  otherwise directs” occur after the words “a sum
                  directed to be paid by an arbitral award shall” and
                  before the words “carry interest at the rate of eighteen
                  per cent”. Thereby, those words only qualify the rate of
                  post-award interest.
                  25. Section 31(7)(a) confers a wide discretion upon the
                  arbitrator in regard to the grant of pre-award interest.
                  The arbitrator has the discretion to determine the rate
                  of reasonable interest, the sum on which the interest is
                  to be paid, that is whether on the whole or any part of
                  the principal amount, and the period for which
                  payment of interest is to be made — whether it should
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       108/119




                  be for the whole or any part of the period between the
                  date on which the cause of action arose and the date of
                  the award. When a discretion has been conferred on the
                  arbitrator in regard to the grant of pre-award interest,
                  it would be against the grain of statutory interpretation
                  to presuppose that the legislative intent was to reduce
                  the discretionary power of the arbitrator for the grant
                  of post-award interest under clause (b). Clause (b) only
                  contemplates a situation where the arbitration award is
                  silent on post-award interest, in which event the award-
                  holder is entitled to a post-award interest of eighteen
                  per cent.”
                 52. We are of the view that the AT has committed serious
                 error by awarding pre-award/pendente lite interest qua
                 Claim Nos. 1, 3 & 6, though AT has observed that the
                 said amount are awarded by way of compensation,
                 however, in view of the peculiar clause of GCC as well
                 as provisions contained in Section 31(7)(a) of the Act of
                 1996 and the decisions rendered by this Court, the AT
                 could not have awarded the pre-award/pendente lite
                 interest.
                 53. For the above stated reasons, the Commercial Court
                 and the High Court failed to appreciate that the AT had
                 awarded pendente lite interest in violation of an express
                 contractual bar and such failure attracts interference
                 even within the limited scope of Sections 34 and 37 of the
                 Act. 55. There is no provision in the GCC which
                 expressly bars the grant of post-award interest. In the
                 absence of such an express exclusion, the statutory
                 mandate under Section 31(7)(b) of the Act must prevail.
                 56. In RP Garg (supra), in paragraph 11, this Court
                 reiterated that post-award interest flows as a matter of
                 law under Section 31(7)(b), unless the parties have
                 unequivocally agreed to exclude it.
                 59. In this context, the decision of this Court in Gayatri
                 Balasamy v. ISG Novasoft Technologies Limited, (2025)
                 7 SCC 1, is significant. In paragraphs 74 to 78, this
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       109/119




                 Court has categorically held that courts retain the power
                 to modify post-award interest under Section 31(7)(b) of
                 the Act where the facts justify such modification. It has
                 been clarified that Section 31(7)(b) is a distinct
                 legislative creation which prescribes a statutory
                 standard to guide the determination of post-award
                 interest and since such interest is inherently future-
                 oriented, the courts may increase or decrease the rate of
                 post-award interest where compelling reasons exist. The
                 Court further observed that when the statute itself
                 benchmarks a standard, such benchmark must weigh in
                 the consideration of the rate awarded and that the power
                 of modification is necessary to avoid unnecessary setting
                 aside of the entire award merely on the question of
                 interest.
                 61. Accordingly, the answer to the issues framed in the
                 present matter is that:
                  A. The AT is not justified in awarding pre-
                  award/pendente lite interest, by way of compensation,
                  while passing the award in favour of the respondent-
                  claimant, and more particularly in view of Clause
                  16(3) and Clause 64(5) of the GCC. The award of such
                  interest is not in accordance with the agreement, and
                  liable to be set aside.
                  B. The AT is justified in awarding post award interest
                  in favour of the respondent-claimant, however, the rate
                  of post-award interest is modified from 12% per annum
                  to 8% per annum from the date of award till
                  realization.
                  C. The Courts below committed a serious error while
                  dealing with Issue (A) and Issue (B) referred
                  hereinabove while exercising the powers under Section
                  34 and Section 37 of the Act.
                 62. In view of the aforesaid discussion, the impugned
                 judgment dated 25.05.2023 passed by the High Court of
                 Judicature at Allahabad, the order dated 15.09.2022
                 passed by the Commercial Court, Jhansi, and the
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       110/119




                 Arbitral Award dated 25.12.2018, are set aside, to the
                 extent of the grant of pre-award/pendente lite interest or
                 amounts in the nature of interest, qua Claim No. 1, 3 and
                 6. The Arbitral Award dated 25.12.2018 is further
                 modified to the extent of the rate of the post-award
                 interest from 12% per annum to 8% per annum from the
                 date of award till realization.”
        62.     It would be apposite to reproduce paragraphs no. 73 and

        74 of the Constitution Bench judgment rendered by the Hon’ble

        Apex Court in the case of Gayatri Balasamy vs. ISG Novasoft

        Technologies Ltd., reported in (2025) 7 SCC 1 herein below:-

                 “73. The next question that arises is: Do courts possess
                 the power to declare or modify interest, especially post-
                 award interest? In respect of pendente lite interest,
                 Section 31(7)(a)(Annexure A), states that unless
                 otherwise agreed by the parties, the Arbitral Tribunal
                 may include in its sum for the award, interest, at such
                 rate it deems reasonable on whole or part of the money
                 for whole or part of the period on which the cause of
                 action arose and the date on which the award is made. In
                 respect of post-award interest, Section 31(7)(b)
                 (Annexure A) states that unless an award provides for
                 interest on a sum directed to be paid by it, the sum will
                 carry an interest at a 2% higher rate than the current
                 rate of interest prevalent on the date of the award, from
                 the date of the award till the date of payment. The
                 Explanation defines the expression “current rate of
                 interest”.
                 74. There can be instances of violation of Section 31(7)
                 (a), and the pendente lite interest awarded may be
                 contrary to the contractual provision. We are of the
                 opinion that, in such cases, the Court while examining
                 objections under Section 34 of the 1996 Act will have
                 two options. First is to set aside the rate of interest or
                 second, recourse may be had to the powers of remand
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       111/119




                 under Section 34(4).”
        63.     It would also be gainful to refer to a judgment rendered

        by the Hon’ble Apex Court in the case of PAM Developments

        Private Ltd. vs. State of West Bengal & Anr., reported in (2024)

        10 SCC 715, paragraphs no. 23, 23.1 to 23.6 whereof are

        reproduced herein below:-

                 “23. The power of the arbitrator to grant pre-reference
                 interest, pendente lite interest, and post-award interest
                 under Section 31(7) of the Act is fairly well-settled. The
                 judicial determinations also highlight the difference in
                 the position of law under the Arbitration Act, 1940. The
                 following propositions can be summarised from a survey
                 of these cases:
                  23.1. Under the Arbitration Act, 1940, there was no
                  specific provision that empowered an arbitrator to
                  grant      interest.   However,       through     judicial
                  pronouncements, this Court has affirmed the power of
                  the arbitrator to grant pre-reference, pendente lite, and
                  post-award interest on the rationale that a person who
                  has been deprived of the use of money to which he is
                  legitimately entitled has a right to be compensated for
                  the same. [State of Orissa v. G.C. Roy, (1992) 1 SCC
                  508, para 43(i). Also see State of Orissa v. N.C.
                  Budharaj, (2001) 2 SCC 721; Union of India v.
                  Krafters Engg. & Leasing (P) Ltd., (2011) 7 SCC 279 :
                  (2011) 3 SCC (Civ) 533] When the agreement does not
                  prohibit the grant of interest and a party claims
                  interest, it is presumed that interest is an implied term
                  of the agreement, and therefore, the arbitrator has the
                  power to decide the same. [State of Orissa v. G.C. Roy,
                  (1992) 1 SCC 508, paras 43 (iv) & 44]
                  23.2. Under the 1940 Act, this Court has adopted a
                  strict construction of contractual clauses that prohibit
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       112/119




                  the grant of interest and has held that the arbitrator
                  has the power to award interest unless there is an
                  express, specific provision that excludes the jurisdiction
                  of the arbitrator [Port of Calcutta v. Engineers-De-
                  Space-Age, (1996) 1 SCC 516, paras 4 and 5; Madnani
                  Construction Corpn. (P) Ltd. v. Union of India, (2010)
                  1 SCC 549 : (2010) 1 SCC (Civ) 168; Tehri Hydro
                  Development Corpn. Ltd. v. Jai Prakash Associates
                  Ltd., (2012) 12 SCC 10 : (2013) 2 SCC (Civ) 122,
                  paras 18-20; Union of India v. Ambica Construction,
                  (2016) 6 SCC 36 : (2016) 3 SCC (Civ) 36 (First
                  Ambica Construction Case); Ambica Construction v.
                  Union of India, (2017) 14 SCC 323 : (2018) 1 SCC
                  (Civ) 257 (Second Ambica Construction Case);
                  Raveechee & Co. v. Union of India, (2018) 7 SCC 664 :
                  (2018) 3 SCC (Civ) 711; Reliance Cellulose Products
                  Ltd. v. ONGC Ltd., (2018) 9 SCC 266 : (2018) 4 SCC
                  (Civ) 351] from awarding interest for the dispute in
                  question [State of U.P. v. Harish Chandra, (1999) 1
                  SCC 63].
                  23.3. Under the 1996 Act, the power of the arbitrator to
                  grant interest is governed by the statutory provision in
                  Section 31(7). This provision has two parts. Under
                  clause (a), the arbitrator can award interest for the
                  period between the date of cause of action to the date
                  of the award, unless otherwise agreed by the parties.
                  Clause (b) provides that unless the award directs
                  otherwise, the sum directed to be paid by an arbitral
                  award shall carry interest @ 2% higher than the
                  current rate of interest, from the date of the award to
                  the date of payment.
                  23.4. The wording of Section 31(7)(a) marks a
                  departure from the Arbitration Act, 1940 in two ways :
                  first, it does not make an explicit distinction between
                  pre-reference and pendente lite interest as both of them
                  are provided for under this sub-section; second, it
                  sanctifies party autonomy and restricts the power to
                  grant pre-reference and pendente lite interest the
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       113/119




                  moment the agreement bars payment of interest, even if
                  it is not a specific bar against the arbitrator. [Sayeed
                  Ahmed & Co. v. State of U.P., (2009) 12 SCC 26, paras
                  14, 23, 24 : (2009) 4 SCC (Civ) 629; Union of India v.
                  Saraswat Trading Agency, (2009) 16 SCC 504 : (2011)
                  3 SCC (Civ) 499; Sree Kamatchi Amman Constructions
                  v. Railways, (2010) 8 SCC 767, para 19 : (2010) 3 SCC
                  (Civ) 575; Union of India v. Bright Power Projects
                  (India) (P) Ltd., (2015) 9 SCC 695, para 13 : (2015) 4
                  SCC (Civ) 702; Reliance Cellulose Products Ltd. v.
                  ONGC Ltd., (2018) 9 SCC 266, para 24 : (2018) 4 SCC
                  (Civ) 351; Jaiprakash Associates Ltd. v. Tehri Hydro
                  Development Corpn. (India) Ltd., (2019) 17 SCC 786,
                  paras 13-15 : (2020) 3 SCC (Civ) 605; Delhi Airport
                  Metro Express (P) Ltd. v. DMRC, (2022) 9 SCC 286,
                  paras 16-20, 24 : (2022) 4 SCC (Civ) 623]
                  23.5. The power of the arbitrator to award pre-
                  reference and pendente lite interest is not restricted
                  when the agreement is silent on whether interest can be
                  awarded [Jaiprakash Associates Ltd. v. Tehri Hydro
                  Development Corpn. (India) Ltd., (2019) 17 SCC 786,
                  para 13.2] or does not contain a specific term that
                  prohibits the same [Oriental Structural Engineers (P)
                  Ltd. v. State of Kerala, (2021) 6 SCC 150, paras 15-18:
                  23.6. While pendente lite interest is a matter of
                  procedural law, pre-reference interest is governed by
                  substantive law. [Central Bank of India v. Ravindra,
                  (2002) 1 SCC 367, para 39 following State of Orissa v.
                  G.C. Roy, (1992) 1 SCC 508, para 43(v)] Therefore, the
                  grant of pre-reference interest cannot be sourced solely
                  in Section 31(7)(a) (which is a procedural law), but
                  must be based on an agreement between the parties
                  (express or implied), statutory provision (such as
                  Section 3 of the Interest Act, 1978), or proof of
                  mercantile usage [Central Bank of India v. Ravindra,
                  (2002) 1 SCC 367, para 39; Central Coop. Bank Ltd. v.
                  S. Kamalaveni Sundaram, (2011) 1 SCC 790, para 13 :
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       114/119




                  (2011) 1 SCC (Civ) 331] .
        64.     Thus, we find from the law laid down by the Hon’ble

        Apex Court in the aforesaid judgments that the provisions of the

        Act, 1996 including the provisions contained in Section 31(7)(a)

        of the Act, 1996 gives paramount importance to the contract

        entered into between the parties and categorically restricts the

        power of an Arbitrator to pre-award / pendente lite interest when

        the parties have themselves agreed to the contrary, hence an

        Arbitral Tribunal cannot award pre-award or pendente lite

        interest, even under the guise of compensation, where contract

        expressly prohibits payment of interest on amounts payable

        under the contract, however post-award interest is governed by

        Section 31(7)(b) of the Act, 1996 and can be granted unless

        expressly barred.

        65.     Now coming back to the present case, we find that Clause

        14 of the agreement dated 24.10.2016 stipulates- “no interest

        shall be payable to the second party for unavoidable delay in the

        payment”. Therefore, it is amply clear that the agreement dated

        24.10.2016 entered into between the parties expressly prohibits

        payment of interest on amounts payable under the contract /

        agreement, hence applying the principles laid down by the

        Hon’ble Apex Court in the aforesaid cases, we hold that the Ld.
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       115/119




        Sole Arbitrator was not justified in awarding interest pendente

        lite @ 10 % per annum from the date of start of the arbitral

        proceedings i.e. 13.09.2019 till the date of award, hence is liable

        to be set aside. Moreover, neither any pleading has been made

        by the claimant-Respondent nor any evidence has been brought

        on record to demonstrate the factum regarding unavoidable/

        avoidable delay in the payments. However, award of interest @

        18 % over the awarded sum from the date of award till

        realization of the awarded amount being covered by the

        provision contained in Section 31(7)(b) of the Act, 1996 does

        not require any interference.

        66.     Having regard to the facts and circumstances of the case

        discussed hereinabove in the preceding paragraphs and for the

        foregoing reasons, the arbitral award dated 17.10.2020, passed

        by the Ld. Sole Arbitrator as also the impugned judgment dated

        25.7.2025, passed by the Ld. Principal District Judge, Patna is

        corrected/modified/set aside in terms of this judgment as

        follows:-

                 “(i) The amount of Rs. 2,67,37,638.62, awarded in favor
                 of the claimant-Respondent by the Ld. Sole Arbitrator,
                 pertaining to item No.1 at internal page No.17 of the
                 award dated 17.10.2020 shall stand corrected / modified
                 to a sum of Rs. 2,61,66,578.62 towards the claimed
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       116/119




                 amount inclusive of security amount. Accordingly, the
                 finding of the Ld. Principal District Judge, Patna in the
                 impugned judgment dated 25.7.2025 to the said effect
                 shall also stands corrected / modified.

                (ii). The award of the Ld. Sole Arbitrator at serial no. 2 at
                internal page No.18 of the award dated 17.10.2020,
                holding       the      claimant-Respondent     entitled    to
                compensation of Rs. 25,00,000/- is set aside. Accordingly,
                the impugned judgment dated 25.7.2025, passed by the
                Ld. Principal District Judge, Patna, upholding this portion
                of the award is also set aside.

                (iii). The award of the Ld. Sole Arbitrator at serial no. 3 at
                internal page No.18 of the award dated 17.10.2020
                regarding grant of simple interest @ 10 % per annum
                from 13.9.2019 till the date of award is set aside, however
                award of interest @ 18 % over the awarded amount from
                the date of award till realization of the awarded amount is
                upheld. Accordingly, the impugned judgment dated
                25.7.2025, passed by the Ld. Principal District Judge,
                Patna, upholding this part of the award to the extent of
                grant of simple interest @ 10 % per annum from
                13.9.2019 till the date of award is also set aside.

        67.     In view of the aforesaid discussion, the award dated

        17.10.2020, passed by the Ld. Sole Arbitrator and the impugned

        judgment dated 25.7.2025, passed by the Ld. Court of Principal

        District Judge, Patna are corrected/modified/set aside to the

        above extent.
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       117/119




        68.     Accordingly, the present appeal is partly allowed to the

        aforesaid extent.

        COMMERCIAL APPEAL No. 14 of 2025

        69.     The present appeal has been filed by the appellants under

        Section 13 (1A) of the Act, 2015 read with Section 37 of the

        Act, 1996 against the order dated 31.07.2025, passed by the

        learned Principal District Judge, Patna (hereinafter referred to as

        the “learned PDJ, Patna”) in Execution Case No.108 of 2021.

        70.     Shorn of the unnecessary details, it would suffice to state

        here that the claimant-respondent had instituted execution

        proceedings by filing the aforesaid Execution Case No.108 of

        2021 under Section 36 of the Act, 1996 for execution of Arbitral

        award dated 17.10.2020 read with order dated 13.11.2020,

        passed by the learned Sole Arbitrator, Patna in Arbitration Case

        No.8 of 2019. The appellants had filed rejoinder to the said

        execution petition raising various objections and stating therein

        that the aforesaid award passed by the learned Sole Arbitrator

        has been challenged under Section 34 of the Act, 1996 by filing

        Miscellaneous (Arbitration) Case No.158 of 2020, hence the

        Execution Case be listed after disposal of the said miscellaneous

        case filed by the appellants.

        71.     It appears that the learned PDJ, Patna by the impugned
Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                       118/119




        order dated 31.07.2025, passed in Execution Case No.108 of

        2021, had on a petition filed by the claimant-respondent supported

        by an affidavit dated 06.05.2025, attached the bank accounts of the

        appellants and had directed the Office to issue warrant of attachment

        in respect of the bank accounts mentioned in the said order dated

        31.07.2025, in accordance with due process of law.

        72.     The Ld. Counsel for the claimant-respondent has further

        pointed out that subsequently, the learned PDJ, Patna has passed

        an order dated 26.11.2025 in Execution Case No.108 of 2021

        whereby and whereunder the petition filed by the claimant-

        respondent herein on 26.11.2025 has been allowed and the

        authorities of the ICICI Bank, Frazer Road Branch, Patna have

        been directed to effect transfer of amount of Rs.4,79,70,693/-

        from the bank account standing in the name of the award debtor,

        maintained at the said branch to the bank account of the

        claimant-respondent maintained at State Bank of India,

        Nagarpalika Chowk, Market Branch, Begusarai, whereafter the

        matter had been directed to be listed on 11.12.2025.

        73.     Thus, it is submitted by the Ld. Counsel for the claimant-

        respondent that the present petition has been rendered

        infructuous on account of passing of the subsequent order dated

        26.11.2025 by the learned PDJ, Patna in Execution Case No.108
             Patna High Court COMMERCIAL APP No.7 of 2025 dt.23-05-2026
                                                    119/119




                     of 2021, which has not yet been challenged by the appellants.

                     74.     Having regard to the facts and circumstances of the case

                     and without going into the merits of the present appeal, we find

                     that since the award dated 17.10.2020 passed by the learned

                     Arbitrator (as modified vide order dated 13.11.2020), in

                     Arbitration Case No.8 of 2019 as also the judgment dated

                     25.07.2025 passed by the learned PDJ, Patna in Misc.

                     (Arbitration) Case No.158 of 2020, under Section 34 of the Act,

                     1996, dismissing the appeal filed by the appellants have now

                     been corrected/modified/set aside by the aforesaid judgment

                     being passed today in the connected Commercial Appeal No.7

                     of 2025, we are of the view that the present appeal has been

                     rendered infructuous, as such the parties would be well advised

                     to approach the Execution Court, especially in view of the fact

                     that the execution proceedings are still pending.

                     75.     Accordingly, the present appeal stands disposed of.


                                                         (Mohit Kumar Shah, J)
I agree.
Arun Kumar Jha, J:
                                                          (Arun Kumar Jha, J)
Ajay/Gaurav
AFR/NAFR               AFR
CAV DATE               15.05.2026
Uploading Date         23.05.2026
Transmission Date      NA


Continue reading with your account

Sign in to read the full judgment. It’s free.

Sign in to read

Checking your session…

Lawyer court records for this case

Associated through the court’s case reference.

For a signed copy suitable for filing, refer to the court's website.