Bombay High Court

ARUNA CHUNILAL SATRA AND ORS.versusMUMBAI MUNICIPAL CORPORATION AND ORS THR COMMISSIONER

Decided
Disposal
Disposed Off

Holding

The appellate court dismissed the appeal, affirming that the structure is not a tolerated structure and must be demolished, and that the trial court's refusal of the injunction was proper.

Summary

The appellants, co‑owners of a plot in Bandra, occupy the ground, first and second floors and claim that a brick‑masonry structure on the ground floor is a tolerated structure existing before 1962. The municipal corporation issued a notice under Section 351 of the MMC Act demanding its demolition, which the appellants contested, seeking an interim injunction. The trial court rejected the injunction, holding that the structure was unauthorised, that the 2001 consent order required demolition of temporary structures, and that the appellants had not complied. The appellants appealed, arguing that assessment records and a 2018 letter proved the structure’s pre‑1962 existence and that the trial court erred in its discretion. The appellate court examined the documentary evidence, the consent terms, and the principles governing appellate interference with discretionary orders, and concluded that the trial court’s decision was well‑reasoned and not perverse. Consequently, the appeal was dismissed and the order directing demolition was upheld.

Issues considered

  • The legal status of the ground‑floor structure as a tolerated structure under the Mumbai Municipal Corporation Act, 1888.
  • Whether the 1 August 2001 consent order obliges the parties to demolish the structure and whether that obligation has been fulfilled.
  • Whether the trial court erred in refusing an interim injunction to the appellants.
  • Whether the appellate court may interfere with the trial court's discretionary order under Order 39/43 CPC.
  • Whether the assessment records and the 2018 letter conclusively establish the structure's existence prior to the 1962 datum line.

Legislation cited

Subjects

  • tolerated structure
  • interim injunction
  • Mumbai Municipal Corporation Act
  • Section 351 notice
  • consent order 2001
  • court discretion
  • CPC Order 39
  • property tax assessment
  • demolition order
  • municipal authority

Judgment

                                                                                             08-AO-707-26.DOC



 JYOTI                          IN THE HIGH COURT OF JUDICATURE AT BOMBAY
 RAJESH                                CIVIL APPELLATE JURISDICTION
 MANE
Digitally signed
by JYOTI RAJESH
MANE                                  APPEAL FROM ORDER NO. 707 OF 2026
Date: 2026.09.08
17:35:00 +0530                                      WITH
                                     INTERIM APPLICATION NO. 5240 OF 2026

                   Aruna Chunilal Satra and Others.                                  ...Petitioner
                          Versus
                   Mumbai Municipal Corporation and others
                   thr. Commissioner                                                 ...Respondents

                                                       _______
                   Mr. A.R.Gole a/w. Ms. Vishwali Botle, for Petitioner.
                   Ms. Smita V. Tondwalkar, for Respondent Nos.1 and 2.
                   Mr. Bhavin Gada a/w. Mr. Dhavanl Visawadia a/w. Ms. Dharmi Savla, i/b.
                   Harakhchand & Co. for Respondent No.3.
                                                            _______

                                                 CORAM:          AARTI SATHE, J.

                                                   DATE:         01 September 2026

                   P.C.

                   1.     This Appeal from Order has been filed under Order XLIII Rule 1(r) read

                   with Section 104 of the Code of Civil Procedure, 1908 (CPC) taking exception to

                   the order dated 13th October 2025 passed by the learned City Civil Court,

                   Dindoshi Bench (hereinafter referred to as the “Trial Court”) in Notice of Motion

                   No. 3325 of 2025 in S.C. Suit No. 8630 of 2025 (hereinafter referred to as the

                   “impugned order”), inter-alia rejecting the aforesaid Notice of Motion filed by the

                   Appellants and rejecting the interim reliefs as sought by the Appellants in the said

                   Notice of Motion.

                   2.     Briefly, the facts are as follows:-

                   i.     The Appellants and Respondent No. 3 are co-owners of land bearing Survey


                                                        Page 1 of 27
                   Mane
                                                                      08-AO-707-26.DOC



No. 277, Hissa No. 2 (Part) and bearing CTS No. B/962, admeasuring 565.20 sq.

meters in the Revenue Village at Bandra Taluka, situated at the junction of

Cemetery Road, St. John Baptist Road, Mount Mary Steps, Bandra West, Mumbai-

400050 (hereinafter referred to as the “suit property”). The Appellants are in

occupation of the 1st and 2nd floor of the budling on the suit property and 3

commercial galas on the ground floor.

ii.     On 24th September 1962, an agreement for sale was executed by and

between the erstwhile owners and Kuverbai Punshi Bharmal and Keshavji Sojpal,

who were the Original Plaintiffs in Suit No. 5757 of 1998 (renumbered as Suit No.

4227 of 2024), as purchasers in respect of the suit property. On 1 st December

1962, a deed of conveyance was registered in respect of the suit property, and the

same was registered with the Sub-Registrar of Assurances under Serial No. 2820 of

1962.

iii.    It is the Appellants’ contention that sometime in the year 1984-85, it was

agreed between the Appellants and Respondent No. 3 that the suit property should

be redeveloped, and the suit structure (Brick masonry wall and GI roof

admeasuring 8 metres*7.6 metres, with 2.4 metres height, on north-east corner of

the suit property) would not be demolished. It is further the Appellant's contention

that since the Appellants had more share of the suit property, the expenses of

redevelopment would not be shared in equal proportion, and the Appellants would

be entitled to occupation of the suit structure. On 23rd October 1992, Intimation

of Disapproval (IOD) was obtained in respect of the suit property, and building

plans were approved on 23rd October 1992.



                                  Page 2 of 27
Mane
                                                                        08-AO-707-26.DOC



iv.    In the year 1998, the predecessor of Respondent No. 3 filed Suit No. 5757

of 1998 before this Court, claiming that the Appellants were in excess of their

entitlement to the suit property. The suit has been re-numbered as Suit No. 4227

of 2024 and is pending adjudication before this court. Respondent No. 3’s

predecessor had thereafter taken out Notice of Motion No. 2691 of 1998 in Suit

No. 5757 of 1998 (renumbered as Suit No. 4227 of 2024)

v.     On 5th October 1998, the advocate for Respondent No. 3’s predecessor

addressed a letter to the Appellants, contending that Respondent No. 3, along with

his family members and the Appellants were in joint occupation of the suit

structure.

vi.    Thereafter, on 1st August 2001, Notice of Motion No. 2691 of 1998 in Suit

No. 5757 of 1998 (renumbered to Suit No. 4227 of 2024) was disposed of by a

consent order, wherein it was agreed that in the building to be constructed on the

suit property, Shop No. 6 on the ground floor would be owned and occupied by

the Appellants as agents of the Court Receiver of this Court, and that the 3 rd and 4th

floors would be owned and occupied by Respondent No. 3 as agent of the Court

Receiver of this Court. It was also agreed that the shops on the ground floor were to

be owned by the division agreed that was agreed in the consent order/ minutes of

the order. The Appellants and Respondent No. 3 had further agreed that they

would demolish all temporary structures in their possession within a period of 8

weeks from the date of the said order. It is the Appellants’ contention that however,

the suit structure was not agreed to be removed/demolished. It was further agreed

that the Appellants and Respondent No. 3 would be at a liberty to apply for and



                                   Page 3 of 27
Mane
                                                                      08-AO-707-26.DOC



obtain part occupation certificate for the 2nd floor from Respondent No. 1-

Corporation.

vii.     Thereafter, sometime in the year 2003, Respondent No. 3 filed Writ

petition No. 1736 of 2003 and contended therein that the suit structure had been

constructed after 1998 by the Appellants.

viii.    On 20th November 2007, a City Survey Plan in respect of the suit property

H/Ward, Ward No. 1035(4), Street No. 17C was conducted. On 11 th December

2008 Respondent No. 1-Corporation addressed a letter to Respondent No. 3's

architect in reply to the letter dated 6 th September 2008 and informed them that

the issue of commencement certificate for the entire work/building which was

proposed to be built on the suit property would be considered only after

compliance of the following terms:-

         a. Unauthorised structure facing John Baptista Road was to be removed.

        b. Plastic sheet (Tadpatri) cover between back of the building and

        southern boundary of the suit property was to be removed.

        c. Brick wall touching outside of Shop No. 7 and road level was to be

        removed.

ix.      On 22nd April 2009, Respondent No. 3 preferred Notice of Motion No.

1580 of 2009 in Suit No. 5757 of 1998 (re-numbered to Suit No. 4227 of 2024)

wherein it was submitted that the suit structure was unauthorised and liable to be

demolished.

x.       On 9th July 2009, an order of even date was passed in the aforesaid Notice

of Motion No. 1580 of 2009, whereby this Court passed the following order:-



                                   Page 4 of 27
Mane
                                                                                      08-AO-707-26.DOC



       “The Notice of Motion has been filed essentially in order to ensure due
       implementation of an order dated 1 August 2001 that was passed by consent of
       parties. By the order of the Court, the Court Receiver was appointed as
       Receiver of the unconstructed third and fourth floors of the property with a
       power to appoint the Plaintiffs as agents and to construct the third and fourth
       floors at the cost of the Plaintiffs. Permission was granted to the Plaintiffs to
       occupy the same as agents of the Receiver without security and royalty. The
       Plaintiffs were to carry out construction under the supervision of their
       Architect. The Consent Terms also provided that the Plaintiffs and the
       Defendants shall demolish the temporary structures in their possession and
       remove their articles lying therein. It is not necessary to burden the order with a
       detailed reference to the Consent Terms save and except to observe that the
       Consent Terms bind all the parties and continue to hold the field. Difficulties
       have arisen in the implementation of the Consent Terms. On 3 rd December
       2003, a further order was passed by this Court by consent of parties; again with
       a view to ensure that the work of construction is completed without
       impediment. That object has still not been realised. It would be necessary to
       clarify that both the orders dated 1 st August 2001 and 3rd December 2003
       shall be regarded and treated as being in force in effect and save and except for
       the modification which is issued hereinafter with the consent of the parties,
       parties shall continue to abide by the previous directions.
       After considerable amount of debate between the Learned Counsel, it has been
       agreed that the following order may be passed by the Court by consent, with a
       view to facilitate the fulfilment of the Consent Terms dated 1ª August 2001:
       (i) Shri N.N. Shrikhande is appointed for the purpose of over all supervision of
       and control over the work that is to be carried out of the construction on the
       third and fourth floors, in accordance with the Consent Terms dated 1 st August
       2001;
       (ii) The costs, charges and expenses payable to Shri N.N. Shrikhande shall be
       borne by the Plaintiffs;
       (iii). Shri N. N. Shrikhande is requested to ensure that the work of construction
       is carried out in accordance with the sanctioned plan and to ensure compliance
       therewith;
       (iv) On behalf of the Defendants, it has been stated that (a) The brick wall
       touching: Shop No.7 shall be removed together with the door in any event
       within a period of eight weeks from today; (b) A duplicate key to the grill on
       the staircase shall be handed over to the Plaintiffs within one week from today;
       (c) The articles on the terrace shall be removed immediately upon the receipt of
       the commencement certificate; and (d). The monsoon sheds which have been
       placed on the site with the permission received from the Municipal
       Corporation, shall be removed by 1st November 2009;
       (v) Shri.N.N. Shrikhande would be at liberty to issue suitable directions to the
       parties to ensure that the construction work is carried out strictly in accordance
       with the sanctioned plan. All necessary directions may be issued to the parties
       in order to facilitate. the work of construction, including in regard to ingress
       and egress to the site and keeping the compulsory open space free of
       obstruction. The parties would be at liberty to place their problems before the
       Architect for expeditious solution;
       (v) The Plaintiffs have assured the Court that the construction shall be
       completed within a period of eighteen months of the receipt of the
       commencement certificate or within such lesser period as may be allowed by
       the Municipal Corporation;
       (vi) The Court Receiver, it is clarified, shall ensure all necessary assistance to
       Shri Shrikhande in order to enable Shri Shrikhande to complete the task and to



                                         Page 5 of 27
Mane
                                                                                     08-AO-707-26.DOC



       abide by these terms. The Motion is disposed of by consent in these terms.”



        By way of the aforesaid order, Mr. N. N. Shrikhande was appointed as the

Court Commissioner for the purpose of overall supervision and control over the

work that was to be carried out for construction on the 3 rd and 4th floors on the

building proposed to be built on the suit property in accordance with the order and

the sanctioned plan.

xi.     On 5th April 2010 a letter from Executive Engineer, Building Proposal

(W.S.) H/W Ward was sent to the Court Receiver of this Court in Suit No. 5757

of 1998, informing that further commencement certificate for the entire work

would be considered only after the following conditions were fulfilled:-

        a. Ground floor structure made up of brick wall masonry and

            patrashed as a roof constructed at south east corner of the plot

            B/962, i.e., at the Junction of Kadeshwari Road and St. John

            Baptista Road was totally removed.

        b. Fresh demarcation of road line of all the roads abutting the plot

            were carried out to ascertain the exact plot boundaries and also the

            encroachment, if any, within the suit property.

xii.    It is Respondent No. 3’s contention that on 10 th February 2011 there was a

certified copy of a City Survey Plan which showed the suit structure as being newly

constructed. Further, on 31st August 2011, a letter was submitted by the Court

Commissioner Mr. Srikhande to the Court Receiver of this Court, submitting as

follows:-

a.      The Court Commissioner submitted that it appeared that unless any


                                        Page 6 of 27
Mane
                                                                       08-AO-707-26.DOC



statutory provisions were involved the demolition of structure (Ground floor

structure made up of brick wall masonry and patrashed as a roof constructed

at south-east corner of the suit property) was the only balance item of work for

getting commencement certificate.

b.       The Court Commissioner further observed that even three years ago

this particular item was the only item withholding municipal permission.

xiii.    Further, in another letter dated 12th September 2011, the Court

Commissioner Mr Srikhande wrote to the Court Receiver of this Court that the

demolition of unauthorised shed, i.e., the suit structure was the only item

remaining which was withholding Municipal permission.          Thereafter, on 29th

October 2012, the Court Receiver of this Court addressed a letter of even date to

Assistant Commissioner of Police, Bandra, asking them to take necessary steps to

demolish the unauthorised suit structure as per law under intimation to his office.

xiv.     On 28th August 2017, the Designated Officer of Respondent No. 1-

Corporation issued a notice under Section 351 of the Mumbai Municipal

Corporation Act, 1888 (hereinafter referred to as the “MMC Act”) in respect of the

suit structure, calling upon the Appellants to show cause as to why the suit

structure should not be demolished. It is Respondent No. 3's contention that the

said show-cause notice was received only by the Appellants and not by Respondent

No. 3.

xv.      On 1st September 2017 and 19th September 2017, the Appellants through

their advocates addressed a response to Respondent No.1-Corporation and

Respondent No. 2, submitting as to why the suit structure was not an unauthorised



                                  Page 7 of 27
Mane
                                                                        08-AO-707-26.DOC



structure and was in fact a tolerated structure, i.e., it existed prior to 1961-62. On

23rd July 2018 the Appellants were informed by the Assistant Assessor and

Collector at H/W Ward by a letter of even date that the first date of the assessment

of property Ward No. H-1035 (4AB), SAC HW-0401620060000, i.e., of the suit

structure was prior to 1961-62. It is pertinent to note that it is the Appellants’

contention that the assessment records conclusively prove that the suit structure

was in existence from the year 1961-62.

xvi.    Thereafter, on 24th July 2018 the Appellants filed an additional reply of even

date and forwarded a letter dated 23rd July 2018 received from the Assistant

Assessor and Collector H/W Ward to contend that the same would conclusively

prove that the suit structure was in existence from the period prior to 1961-62.

xvii.   On 3rd August 2018 a speaking order was passed by the designated officer of

Respondent No. 1-Corporation holding that the suit structure was a tolerated

structure, in view of the assessment remark dated 23 rd July 2018, as the structure

was in existence prior to 1961-62. It is Respondent No. 3's contention that the said

speaking order was passed without hearing Respondent No. 3.

xviii. On 10th March 2022 Respondent No. 3 preferred Writ Petition No. 1736 of

2023 before this Court challenging the speaking order dated 3 rd August 2018

passed by the Designated Officer of Respondent No. 1-Corporation in respect of

the suit structure on the ground that the same was passed without hearing

Respondent No. 3. The primary ground raised in the Writ Petition was that an

opportunity of personal hearing was not granted to Respondent No. 3 before

passing the speaking order dated 3rd August 2018.



                                   Page 8 of 27
Mane
                                                                                       08-AO-707-26.DOC



xix.    On 23rd June 2022 Respondent No. 3 preferred Interim Application No.

118 of 2022 in Suit No. 5757 of 1998 (re-numbered to Suit No. 4227 of 2024)

seeking an identical prayer for demolition of the suit structure. It is the Appellants’

contention that Respondent No. 3 had alleged that he was unable to obtain

commencement certificate for construction of 3 rd and 4th floors on the building

proposed to be built on the suit property, as the suit structure was not yet

demolished.

xx.     On 21st March 2023, an order of even date was passed by this Court

directing Respondent No. 1-Corporation to file an additional affidavit indicating

whether, subject to all the other compliances, commencement certificate could be

granted to Respondent No. 3 for construction of 3 rd and 4th floors of the building

proposed to be built on the suit property. On 10 th April 2023 an additional

affidavit was filed by Shri. Asif Shaikh, Assistant Engineer (BP), H/W Ward which

inter-alia stated that in consideration of the earlier permissions and subject to

compliance of the conditions stipulated in the IOD, Respondent No. 3 could be

granted permission for construction of 3 rd and 4th floors of the building proposed to

be built on the suit property, despite the presence of the suit structure. The

relevant paras of the aforesaid affidavit are reproduced below:-

       1. I say that by Order dated 21.03.2023 passed by Shri. B.P. Colabawalla J.,
       Hon'ble Court has directed "to file a further short affidavit indicating whether
       subject to all other compliances, permission can be granted to the Plaintiffs for
       construction of 3rd and 4th floor of the suit premises despite there being a
       structure identified as permanent shed with brick masonry walls && G.L. sheet
       roof admeasuring 8 meters x 9,60 meters x 2.40 meters."
       2. I say that in compliance of aforesaid Order dated 21.03.2023 I am filing
       further Affidavit in Reply. I further say that to avoid the repetition, the contents
       of earlier Affidavit in Reply dated 05.04.2023 has to be considered part and
       parcel of present Affidavit in Reply.
       3. I say that considering the earlier permissions granted and Subject to requisite
       compliance as per IOD conditions, permissions can be granted to the Plaintiffs


                                          Page 9 of 27
Mane
                                                                                  08-AO-707-26.DOC



        for construction of 3rd and 4th floor of suit premises despite there being a
        structure identified as permanent shed with brick manosnry wall. && GI.
        Sheet Roof taking Cognizance of the said shed in FSI, as per the Provisions of
        DCPR 2034.
        4. In view of the above, the application is liable to be dismissed against
        Corporation.

xxi.     On 9th May 2025, an order was passed by the Division Bench of this Court

in Writ Petition No. 1736 of 2023 preferred by Respondent No. 3, remanding the

matter back to Respondent No. 1-Corporation for fresh hearing, thereby setting

aside the speaking order dated 3rd August 2018. On 15th May 2025, in the said

remand proceedings, written submissions were filed by Respondent No. 3 before

the Designated Officer of Respondent No. 1-Corporation, and further, written

submissions were filed by the Appellants on 21 st May 2025 before the Designated

Officer of Respondent No. 1-Corporation. Further, additional written submissions

dated 26th May 2025 were filed by Respondent No. 3, and on 27 th May 2025,

additional written submissions were filed by the Appellants before the Designated

Officer of Respondent No. 1-Corporation. On 25 th July 2025, further additional

written submissions were filed by the Appellants before the Designated Officer of

Respondent No. 1-Corporation. It is Respondent No. 3's contention that the

written submissions dated 27th May 2025 and 25th July 2025 filed by the

Appellants were not served upon Respondent No. 3.

xxii.    On 14th August 2025, a speaking order was passed by the Designated

Officer of Respondent No. 1-Corporation pursuant to the order dated 9 th May

2025 passed by the Division Bench of this Court. The speaking order held as

follows:-

        After hearing of Architect, Petitioner and the Respondent, this department
        concludes as follows:


                                        Page 10 of 27
Mane
                                                                                        08-AO-707-26.DOC



       1. As per the city survey plan submitted by the complainant/petitioner dated
       10/12/2010, it is indicated that the Notice structure is a new construction.
       Accordingly, this office sent a letter to the City Survey Department along with
       the said plan submitted by the complainant/petitioner vide reference no. (viii)
       and (ix), requesting clear and specific remarks regarding the status of the
       Notice structure. In response, this office received a letter from the City Survey
       Department            bearing          Ref.         No.          न.भू.बांद्रा    'वी'
       वॉर्ड/न.भू.क्र.वी/१९६२/मोजणी/२०२५/जायक क्र. २३५१ dated 31/07/2025, stating
       that, "The City Survey Department is responsible solely for land measurement
       and survey-related matters. The department does not maintain any official
       record regarding the period during which the said structure was constructed.
       However the structure is show existing as on 2010 as new structure.
       2. In accordance with the Speaking Order dated 03/08/2018 issued by this
       office, and Based on the assessment remarks provided by the Assessment
       Department dated 23/07/2018, it was stated that the notice structure was
       constructed prior to 1961-1962. Accordingly, the assessment remarks were
       taken into consideration, and the notice structure was considered as tolerated
       structure in speaking order dtd.03/08/2018. However the then Asstt. Engineer
       has not taken cognizance on the Ex. Engineer (B.P) approvals, remarks of
       1992, 1998 &2010. Where in th notice structure is not shown/reflected in the
       approved plans, EE BP record of 1992/1998, Further in 2008.2010 due to
       existence of the notice structure the further CC for entire work above 2nd floor
       can not be granted.
       3. As per the order dated 21/03/2023 passed by the Hon'ble High Court in
       Interim Application No. 118 of 2022 in Suit No. 5757 of 1998, the Court has
       directed the Municipal Corporation of Greater Mumbai (AM.C.G.M.) to file
       an additional affidavit indicating whether, subject to all other compliances, a
       Commencement Certificate can be granted to the complainant for the
       construction of the third and fourth floors of the suit building, notwithstanding
       the existence of the subject structure on the property. This affidavit has been
       necessitated us the Hon'ble Court is of the view that once this question is
       clarified, the entire dispute between the plaintiff and the defendant may be
       resolved amicably. As per above order of the Hon'ble High Court, Shri. Asif M.
       Shaikh Asst. Engineer (Building Proposal) H/West Ward has filed an additional
       affidavit dated 10/04/2023 of the respondent on behalf of M.C.G.M. The said
       affidavit further states that considering the earlier permission granted and
       subject to requisite compliances as per 1.0.D. conditions, permission can be
       granted to the Plaintiffs for construction of 3rd and 4th floor of the suit
       premises despite there being a structure identified as permanent shed with
       brick masonry wall and G.I. shect roof taking into cognizance of the said shed
       in F.S.1., as per provisions of the DCRP 2034, But same can be taken as
       additional FSI area on premium payment. And it does not prove the
       authenticity of the notice structure.
       4. The Notice structure existed prior to 1961-62. However, as per the approval
       of the Building Proposal Department in the year 1992, the said structure was
       not in existence on the site at that time, nor is it reflected in the approved plans
       of 1992 and-1998.
       5. Thereafter, as per the remarks of the Building Proposal Department in 2008,
       the unauthorized structure was found to be existing on the site. Consequently,
       the Department refused to grant any further Commencement Certificate until
       the removal of the said Notice structure. This confirms the existence of the
       structure in the year 2008.
       6. As per the City Survey plan of 2010, the existing structure is a new
       construction, and as per the letter dated 31/07/2015 the said structure is shown



                                          Page 11 of 27
Mane
                                                                                     08-AO-707-26.DOC



       on site, thereby establishing its existence during the period from 2008 to 2010.
       7. As per complaint the notice u/s 351 of MMC Act was issued to the sald
       structure on 28/08/2017 in response of this office notice, noticee as produce
       the assessment record of 1961-62 and hence, the Designated Officer/ Assistant
       Engineer has pass speaking order on 03/08/2018 stating that the notice
       structure is in tolerated category. But as per the report of EEBP the structure
       was not in existence during 1992 to 1998. Hence it is not showing continuous
       existence of the nofice structure since 1961-1962. Hence the structure cannot
       be put in tolerated category.
                                               Order
       In view of the above, it is clear that the said structure has not been in
       continuous existence since 1961-62 i.e. did not exist during the period from
       1992 to 1998. Although records indicate its existence between 2008 and 2010,
       the same cannot be construed as placing the structure in the tolerated category.
       Furthermore, as per the affidavit dated 10/04/2023 of the Assistant Engineer,
       Building Proposal Department, filed on behalf of the Municipal Corporation of
       Greater Mumbai (MCGM), the sald structure can be taken into FSI calculation
       but it does not prove its authenticity. It needs additional FSI for the same. Now
       as per notice issued by this office under section 351 of MMC Act the question
       is that whether the said structure is tolerated or not and hence, in view of above
       I am of the opinion that the said structure is not of tolerated category and
       needs to the demolished. Hence, I passed the order that the notice structure
       does not proves its continues existent since 1961-1962 and hence, not in
       tolerated category and unauthorized needs to be demolished.
       In view of the above, you are hereby called upon to remove the notice structure
       which is described in the notice within 15 (Fifteen) days from receipt of this
       order, failing which the same will be demolished by this office entirely at your
       risk and cost without giving any further intimation which may please be noted.
       Further. note that under section 475-A of M.M.C. Act, you shall be punished
       with imprisonment for a term which shall not be less than 01 (One) month but
       which may extend to 01 (one) year and with a fine which shall not be less than
       Five thousand rupees but which may extend to Twenty Five thousand rupees
       and in the case of continuing offence with further daily fine which may extend
       to Five hundred rupees.



xxiii. On 8th September 2025 LC Suit No. 2076 of 2025 along with Notice of

Motion was filed by the Appellants before the Trial Court challenging the speaking

order dated 14th August 2025 passed by the Designated Officer of Respondent No.

1-Corporation under Section 351 of the MMC Act.

xxiv. On 10th September 2025 Notice of Motion No. 3225 of 2025 along with

an affidavit in support of the aforesaid Notice of Motion was preferred by the

Appellants before the Trial Court. On 11 th September 2025, ad-interim reliefs as

sought by the Appellants were rejected by the Trial Court. Thereafter, on 17 th


                                        Page 12 of 27
Mane
                                                                                       08-AO-707-26.DOC



September 2025, the Appellants preferred Appeal from Order (St.) No. 31048 of

2025 before this Court, challenging the ad-interim order dated 11 th September

2025 passed by the Trial Court. This Court by order dated 17 th September 2025

disposed of the aforesaid Appeal from Order and directed Trial Court to dispose of

the Notice of Motion within a period of 4 weeks from the date of the order. It

further stipulated that if the said order was adverse to the Appellants, the same

would be stayed for a further period of 2 weeks from the date of passing the said

order in order to enable the Appellants to take recourse to a superior court. The

order dated 17th September 2025 passed by this court is reproduced below:-

       P.C . :
       1. Not on Board. Mentioned by way of filing praecipe dated 17.09.2025.
       Perused the praecipe.
       2. Heard Mr. Apte, learned Senior Advocate for Applicants / Appellants; Mr.
       Suryavanshi, learned Advocate for Respondent No.1 and Mr. Gada, learned
       Advocate for Respondent Nos.2 and 3.
       3. Interim Application is filed for impugning ad-interim order dated
       11.09.2025 passed by the learned Trial Court in Interim Application (Stamp)
       No.31049 of 2025. The lis pertains to challenge to notice issued under Section
       351(A) of the Mumbai Municipal Corporation, Act 1888 to the notice
       structure / tolerated structure of the Plaintiff before the Trial Court. It is
       vehemently opposed by private Respondents represented by Mr. Gada.
       4. However considering that challenge is to the ad-interim order rejecting ad-
       interim relief, without opining anything on merits or giving any prima facie
       imprimatur of this Court, it would be in the interest of justice if the learned
       Trial Court is directed by this Court to determine the Notice of Motion /
       Interim Application seeking interim relief expeditiously and finally strictly in
       accordance with law.
       5. One of the reason which compels this Court to pass this order is in view of
       the substantive challenge maintained by the Plaintiffs to the subject notice
       before Trial Court.
       6. Needless to state that private Respondent who are equally interested in
       prosecuting the matter shall be heard strictly in accordance with law and only
       after hearing all parties, learned Trial Court shall pass a reasoned speaking order
       for interim relief.
       7. Hearing shall be done by the Trial Court as expeditiously as possible and in
       any event within a period of four weeks from today. If the said order is adverse
       to Plaintiffs, same shall be stayed for a further period of two weeks from the
       date of passing the order in order to enable the Plaintiffs to take recourse to the
       superior Court.
       8. All questions of parties before me are expressly kept open including that of
       the private Respondents as also the Municipal Corporation
       9. In view of the above, no coercive steps shall be taken against Plaintiffs’ notice


                                         Page 13 of 27
Mane
                                                                                08-AO-707-26.DOC



       structure while adhering to the directions contained hereinabove.
       10. Needless to state that since ad-interim relief is passed on Stamp number of
       the proceedings, Plaintiffs are permitted to remove the office objections before
       the Trial Court within a period of one week from today positively. I am also
       informed that since objections were not removed, the reasoned / speaking ad-
       interim order is not uploaded and not made available to the Court. In that view
       of the matter, the aforesaid direction is passed.
       11. I am also informed that Registrar in the City Civil Court is on leave / absent
       for a period of one week. If that is the case, the Deputy Registrar or any other
       Authorised Officer on his behalf shall take cognizance of this order forthwith
       and ensure that Plaintiffs are able to remove the office objections.
       12. Copy of this order shall be placed before the Principal Judge of the Trial
       Court for compliance.
       13. Appeal from Order and praecipe are both disposed. In view of disposal of Appeal
       from Order, Interim Application is also disposed.



xxv.    Affidavits-in-reply and rejoinders were filed sometime in October 2025 in

Notice of Motion No. 3225 of 2025, and the said Notice of Motion filed by the

Appellants was rejected by the Trial Court by order dated 13 th October 2025. It is

being aggrieved by the aforesaid order dated 13 th October 2025 passed by the Trial

Court in Notice of Motion No. 3225 of 2025 that the present Appeal from Order

is sought to be preferred.

3.      Learned counsel Mr. A.R. Gole, along with Ms. Vishwali Botle appeared on

behalf of the Appellants, Ms. Smita Tondwalkar appeared on behalf of Respondent

No. 1-Corporation and Respondent No. 2, and Mr. Bhavin Gada, along with Mr.

Dhaval Visawadia and Mr. Dharmi Savla, instructed by Harakhchand & Co.

appeared on behalf of Respondent No. 3.

4.      Learned Counsel on behalf of the Appellants submitted that the impugned

order passed by the Trial Court was unsustainable and passed without considering

the documents on record, inasmuch as it decided the question of tolerated status of

the suit structure on the basis of consent terms dated 1 st August 2001 entered into

between the parties, and on the basis of building plans of the year 1992-98, which


                                      Page 14 of 27
Mane
                                                                        08-AO-707-26.DOC



according to learned counsel on behalf of the Appellants, were completely

irrelevant documents ignoring Respondent No. 1-Corporation’s own assessment

records, which showed that the suit structure was a tolerated structure. It was

further submitted that Respondent No. 1-Corporation’s own assessment records

establish that the suit structure was a tolerated structure, which was evidenced by

the letter dated 23rd July 2018 from the Assistant Assessor and Collector H/W

Ward, which certified that the first date of assessment of property Ward No. H-

1035 (4AB), SAC HW0401620060000 was prior to 1961-62, and further, the

assessment remark dated 3rd February 2025 certified afresh that the suit structure

assessed in the earlier SAC No. HW0401620060000 was in existence prior to

1961-62. It was further his submission that the property tax and receipts in respect

of the suit structure which were issued from 1967 onwards continued to show the

suit structure, and the Appellants had continued to pay property tax thereon

without there being any dispute raised by Respondent No. 1-Corporation or

Respondent No. 3. It was therefore submitted that the Trial Court’s finding that

the property tax bills show different dates and hence needed to be discarded was an

incorrect approach sought to be taken by the Trial Court. It is the Appellants’

contention that the assessment records of Respondent No. 1-Corporation

themselves go to prove that the suit structure was a tolerated structure, and taking a

contrary view by the Trial Court to deny injunction to the Appellants was arbitrary

and misplaced.

5.     Learned counsel on behalf of the Appellants also submitted that the circular

dated 31st January 1967 issued by Respondent No. 1-Corporation clearly provides



                                  Page 15 of 27
Mane
                                                                                       08-AO-707-26.DOC



the category of tolerated structures and prescribes the manner of identification

thereof. The contents of the aforesaid circular are reproduced below:-

                  MUNICIPAL CORPORATION OF GREATER MUMBAI
                                 NOICE/40088/I OF 31-1-67
                                                              Sub:-Unauthorised (a) Semi
                                                                permanent structures and
                                                              (b)Huts and Zavli sheds for
                                                         non-residential purposes such as
                                                                shops, cabins, garage, etc.
         When complaints are received from the public seeking us to take action for
       removal of unauthorized structure of the type mentioned above in Suburbs and
       Extended Suburbs, difficulty arises us to what should be considered as
       acceptable proof for determining when the structure was constructed. Quite
       often parties produce old receipts or some other evidence which cannot be
       considered to be quite reliable. It has been verified that the assessment of semi-
       permanent structures was first taken up from 1-04-1962 and that of huts and
       Zavli sheds from 17-4-1962. In view of this, if a structure has been existing
       whether ‘semi-permanent or ‘huts’ and ‘Zavli sheds’ prior to 1-04-1962 or 17-
       4-1962, respectively, it will not be difficult to verify in every such case that it
       was existing before these respective dates as thereafter, it would come under
       assessment
         Under the circumstances, M.C. has decided that for tolerating unauthorized
       structures of non-residential users, the datum lines should be as follows:
         (a) Semi-permanent structures                      1.4.1962
         (b) Huts and Zavli shed                           17.4.1964
         If a complaint is received about a non-residential structure of either of the
       above types and it is not found to be on the assessment record on the above
       respective dates, it should be deemed to be a structure that came later to the
       relevant date mentioned above and action for removal taken, irrespective of
       rent, receipt or any such evidence produced by the party to show that the
       structure was standing before 1-04-1962 or 17-4-1962.
          As the case may be, it should be noted that these orders should not be
       applied to unauthorized structures, sheds, or hut required to be removed for
       any development works.
                                                                     (Emphasis supplied)

6.      It was therefore submitted that the binding nature of the circular itself has

not been taken into consideration by the Trial Court, and therefore the impugned

order ought to be set aside. It was also contended that once the assessment records

of Respondent No. 1-Corporation themselves establish that the suit structure was a

tolerated structure, then to hold anything to the contrary would amount to

discarding the sanctity of the documents issued by Respondent No. 1-Corporation.

Learned counsel on behalf of the Appellants also submitted that the order dated


                                         Page 16 of 27
Mane
                                                                       08-AO-707-26.DOC



14th August 2025 itself proceeds on an erroneous footing that the letter dated 31 st

July 2025 issued by the City Survey Department stated that it maintains no record

of the period of construction of the suit structure, however, the suit structure is

shown as an existing structure as on 2010 in the category ‘new structure’. Learned

counsel submits that this was a misreading of the letter dated 31 st July 2025. On

the aforesaid grounds, the counsel submitted that the impugned order was vitiated

and not based on a prima facie view of all the documents.

7.     Per contra, learned counsel on behalf of Respondent No. 3 has submitted

that the plans which were put up for sanction in respect of the suit property in the

year 1985, 1986, and 1992 did not show/ specify the suit structure. He further

submitted that the contention of the Appellants that the said plans did not consist

of the suit structure only because it was not a RCC structure is a baseless and

dishonest attempt on the part of the Appellants to mislead this Court, and the same

is contrary to Development Control and Promotion Regulations (DCPR) 2034. It

was further his contention that the suit structure was constructed by the Appellants

being a shed with brick masonry wall and GI roof in the year 1998, which was

illegal and unauthorized, and that the suit structure fell on the suit property which

was jointly owned by the Appellants and Respondent No. 3. It was further

submitted that as per the Maharashtra Shops and Establishments Act, 1948 insofar

as the registration certificate dated 27th May 1999 of the suit structure was

concerned, the same showed as “new”. It was further submitted that in Suit No.

5757 of 1998(renumbered to Suit No. 4227 of 2024), wherein Respondent No. 3

had filed Notice of Motion No. 2691 of 1998 and order dated 1 st August 2001 was



                                  Page 17 of 27
Mane
                                                                                   08-AO-707-26.DOC



passed in terms of the minutes of the order and clause 3 of the minutes of the

order, it was specifically stated that within 8 weeks of the order, the Appellants and

Respondent No. 3 shall demolish all temporary structures in their possession and

remove their articles lying therein. The relevant clause 3 of the minutes of the

order is reproduced below:-

       Within 8 weeks from today the Plaintiffs and Defendants shall demolish the
       Temporary Structures in their possession and remove their articles lying herein.

8.      It was therefore contended by learned counsel on behalf of Respondent No.

3 that in spite of the aforesaid order dated 1 st August 2001 being passed by this

Court, wherein parties by consent had agreed to demolish the suit structure, the

same has not been done so far by the Appellants. It was further submitted that in

the City Survey Plan dated 20th November 2007 in respect of the suit property, the

suit structure was not reflected, and this further goes on to establish that the suit

structure was never in existence. It was further submitted that pursuant to the

order dated 9th July 2009 passed by this Court with a view to facilitate the

implementation and fulfillment of the consent order dated 1 st August 2001, Mr. N.

N. Shrikhande was appointed as the Court Commissioner for the overall

supervision and control over the work that was to be carried out in respect of the

3rd and 4th floors pursuant to the consent terms, and pursuant thereto the aforesaid

Court Commissioner by his letters dated 31st August 2011 and 12th September 2011

submitted as follows:-

       Letter dated 31st August 2011
       "It is to be mentioned here that as far as this office is concerned, further
       commencement certificate for the entire work will be considered only after
         1) Ground floor structure made up of brick wall masonry and patrashed as a
         roof constructed at the south east corner of the plot B/962 i.e at the Jn. of
         Kadeshwari Road and St.John Baptista Road is totally removed".



                                        Page 18 of 27
Mane
                                                                            08-AO-707-26.DOC




       Letter dated 12th September 2011
       "the demolition of unauthorized shed is the only item remaining which is
       withholding municipal permission"

9.      Further there were also letters issued by the Executive Engineer, Building

Proposal (W.S.) H Ward to the Court Receiver of this Court in Suit no. 5757 of

1998 (re-numbered to Suit No. 4227 of 2024) wherein also it was informed that

the suit structure was required to be demolished. It is therefore Respondent No. 3’s

contention that the aforesaid correspondence and the view taken by the Court

Commissioner clearly establish that the suit structure was an illegal structure and

was clearly unauthorized. It was further submitted that order dated 3 rd August 2018

was passed by the Designated Officer of Respondent No. 1-Corporation without

giving an opportunity of hearing to Respondent No. 3, and the said order

considering the suit structure as a tolerable structure was passed on the basis of the

letter dated 23rd July 2018. This, according to Respondent No. 3 could not be the

only basis on which the suit structure could be considered as a tolerable structure.

Further, Respondent No. 3 contended that the order dated 3 rd August 2018 was a

subject matter of challenge before this Court, and the matter was remanded back to

the Designated Officer of Respondent No. 1-Corporation on 9 th May 2025 for a

fresh hearing. In the remand proceedings, various written submissions were filed,

and by order dated 14th August 2025 the Designated Officer of Respondent No. 1-

Corporation has come to a clear conclusion that the suit structure has not been in

existence since the year 1961-62. The relevant findings in the aforesaid order are

reproduced in paragraph 2(xxii) above.

10.     Learned counsel has also sought to place reliance on the decision of the



                                    Page 19 of 27
Mane
                                                                              08-AO-707-26.DOC



Supreme Court in the case of Ramakant Ambalal Chokshi Vs Harish Ambalal

Chokshi & Others1 to contend that the Appellate Court cannot interfere with the

exercise of the discretion of the Trial Court and substitute its own discretion, except

where the discretion has been shown to have been exercised arbitrarily or

capriciously or perversely, or where the Court has ignored the settled principles of

law regulating grant or refusal of interlocutory injunctions. He has therefore

submitted that the Trial Court on the basis of the evidence placed on record and

submissions advanced on behalf of the parties has arrived at a reasoned conclusion

and on a proper application of mind has come to the conclusion of rejecting Notice

of Motion No. 3225 of 2025 challenging the speaking order dated 14th August

2025 passed by the Designated Officer of Respondent No. 1-Corporation.

                              ANALYSIS AND FINDINGS

11.    I have considered the rival submissions and perused the impugned order

along with the relevant documents. At the very outset, it is an undisputed fact that

the suit property was jointly owned by the Appellants and Respondent No. 3, and

the only bone of contention in the present case is in respect of the suit structure,

which Respondent No. 3 contends is unauthorized/illegal. A perusal of the

documents indicates that though the suit structure was earlier considered a

tolerated structure, however, the Trial Court, on the basis of perusal of the letter

dated 23rd July 2018 issued by the the Assistant Assessor and Collector at H/W

Ward has on a prima facie basis rightly come to the conclusion that the first

assessment was of the year 1961-62, which was applicable in respect of the original


1 Civil Appeal No. 13001 of 2024 @ Special Leave Petition (Civil) No. 252 of 2023


                                     Page 20 of 27
Mane
                                                                         08-AO-707-26.DOC



structure and not to subsequent changes which were made on the suit property, i.e.,

the suit structure, which is unauthorized/illegal. This finding, to my mind, cannot

be disturbed, inasmuch as the Trial Court has also considered that though in the

order dated 3rd August 2018 heavy reliance was placed on the letter dated 23 rd July

2018, the said order was a subject-matter of challenge before this Court, and this

Court by order dated 9th May 2025 remanded the matter for a fresh hearing,

considering the rival claims regarding the legality of the suit structure. Further, the

Trial Court has also based its conclusion on the order dated 1 st August 2001 passed

by this Court in Notice of Motion No. 2691 of 1998 in Suit No. 5757 of 1998

(renumbered to Suit No. 4227 of 2024), wherein by consent it was the agreed that

the Appellants and Respondent No. 3 would demolish from the suit property all

the temporary structures in their possession and remove their articles lying therein.

Further, to facilitate these minutes of order, this Court by further order dated 9 th

July 2009 appointed Mr. N.N. Shrikhande as the Court Commissioner for the

purpose of overall supervision and control over the work that was to be carried out

in respect of the 3 rd and 4th floors on the suit property in accordance with the

consent order dated 1st August 2001. In fact, the letters which have been issued by

the Court Commissioner and also by Court Receiver of this Court to Assistant

Commissioner of Bandra Police and by the Executive Engineer, Building Proposal

of Respondent No. 1-Corporation to the Court Receiver of this Court have

specifically mentioned that the suit structure ought to be removed, and it is only

thereafter the construction would commence for the 3 rd and 4th floors on the suit

property. The Trial Court has also considered that the documents of assessment



                                  Page 21 of 27
Mane
                                                                       08-AO-707-26.DOC



show that some receipts relate to a structure which is prior to 1961-62, and some

receipts are after 1970-71, and they show different SAC numbers. The Trial Court

has therefore taken into consideration all the aforesaid documents to come to the

conclusion that the suit structure cannot be a tolerated structure, and hence rightly

dismissed Notice of Motion No. 2691 of 1998 in Suit No. 5757 of 1998

(renumbered to Suit No. 4227 of 2024) filed by the Appellants, refusing to grant

them injunction.

12.    I am of the view that the consent terms which form part of the order dated

1st August 2001 had put an onus on both the parties to remove the temporary

structures in their possession, and this has not been complied with so far, which the

Trial Court has taken into consideration before passing the impugned order. The

Appellants’ contention therefore, that only because the letter dated 23 rd July 2018

from Assistant Assessor and Collector at H/W Ward certified that the first date of

assessment was prior to 1961-62 and the assessment remark dated 3 rd February

2025 showed that the suit structure was in existence prior to 1961-62 the suit

structure to be treated tolerated is erroneous, inasmuch as, the same could not be

the only basis on which the suit structure could be held as a tolerated structure, as

there were discrepancies in the said documents, particularly the assessment remark

dated 3rd February 2025, which clearly records that the structure under reference

seems to have been assessed under SAC HW-0401620060000. In my view, all

these contentions regarding the legality of the suit structure on the basis of

documents can be examined and gone into detail at the time of trial of the

proceedings. However, the impugned order passed by the Trial Court has, on



                                 Page 22 of 27
Mane
                                                                        08-AO-707-26.DOC



examination of all these documents, come to a prima facie view, which to my mind

is not a view which can be termed as arbitrary or perverse, and would be a plausible

view which the Trial Court has come to after consideration of all documentary and

factual material on record and proper application of mind. I am further of the view

that applying the principles of Wander Ltd. v. Antox India (P) Ltd.2, while

considering an application under Order XXXIX Rules 1 and 2 of the CPC,the

appellate court would not ordinarily interfere with the exercise of discretion by the

court of first instance or substitute its own discretion, except where such discretion

has been exercised or has been shown to have been exercised arbitrarily, or

capriciously, or perversely, or where the Court has ignored the settled principles of

law regulating grant or refusal of interlocutory injunctions, and the facts of the

present case do not warrant any interference with the impugned order of the Trial

Court as the impugned order is a well-reasoned and well-considered order.

13.    I am further of the view that once the consent terms made it obligatory on

the part of the Appellants and Respondent No. 3 to demolish the temporary

structures on their possession, which admittedly the Appellants have not done so

far, would by itself be a ground on which the Trial Court has rightly refused the

injunction as sought by the Appellants. It is also an admitted fact that in the plans

submitted by the Appellants in years 1985, 1986, and 1992 the suit structure has

not been shown, which itself shows that the very existence of the suit structure was

always in doubt. The Trial Court, therefore, on a prima facie view, has rightly come

to the conclusion that the suit structure was erected after the datum line, and hence


2 1990 Supp SCC 727


                                  Page 23 of 27
Mane
                                                                                     08-AO-707-26.DOC



the fresh speaking order dated 14 th August 2025 which was passed post the

direction of this Court by order dated 9th May 2025, has held that the suit structure

was not in existence prior to the datum line. The Trial Court, therefore, on an

appreciation of the entire factual conspectus and the evidence on record has passed

a reasoned order, which does not warrant any interreference, and most certainly

cannot be termed as an arbitrary or perverse order. I am therefore in agreement

with submission made on behalf of Respondent No. 3 that the present Appeal from

Order deserves to be dismissed, and am further of the view that the reliance of

Respondent No. 3 on the case of Ramakant Ambalal Chokshi Vs Harish Ambalal

Chokshi & Others (supra) is apposite to the facts of the present case and upholds

the view as laid down in Wander Ltd. v. Antox India (P) Ltd. (supra). The relevant

paragraphs of the decision rendered in Ramakant Ambalal Chokshi Vs Harish

Ambalal Chokshi & Others (supra) are reproduced below –

       16.4. Injunction was granted by the trial court by way of a well-reasoned order
       after taking into consideration all the detailed facts and contentions of both the
       parties. The appellate court should remain slow in substituting its own
       discretion with the one exercised by the court of first instance unless the
       exercise of discretion by the first court was shown to be malicious, capricious,
       perverse or having been exercised in ignorance of the settled principles of law
       regulating the grant or refusal of interlocutory injunctions.
       …
       21. With regard to (a), this Court held thus: (Wander case-, SCC p. 733, para
       14)
           "14.... In such appeals, the appellate court will not interfere with the
           exercise of discretion of the court of the first instance and substitute its
           own discretion, except where the discretion has been shown to have been
           exercised arbitrarily or capriciously or perversely, or where the court had
           ignored the settled principles of law regulating grant or refusal of
           interlocutory injunctions. ...The appellate court will not reassess the
           material and seek to reach a conclusion different from the one reached by
           the court below.... If the discretion has been exercised by the trial court
           reasonably and in a judicial manner the fact that the appellate court
           would have taken a different view may not justify interference with the
           trial court's exercise of discretion."
       22. This Court, while arriving at the above findings, relied on its earlier
       judgment in Printers (Mysore) (P) Ltd. v. Pothan Joseph, wherein it was held



                                        Page 24 of 27
Mane
                                                                                      08-AO-707-26.DOC



       thus: (Printers case, SCC OnLine SC para 9)
           "9.... as has been observed by Viscount Simon LC in Charles Osenton &
           Co. v. Johnston-, the law as to reversal by a court of appeal of an order
           made by a Judge below in the exercise of his/her discretion is well
           established, and any difficulty that arises is due only to the application of
           well-settled principles in an individual case."
       …
       24. In Evans case, Lord Wright made it clear that while adjudicating upon the
       discretion exercised by the trial court, the appellate court is obliged to consider
       the case put forward by the appellant in favour of its argument that the trial
       court exercised its discretion arbitrarily or incorrectly in the circumstances.
       25. What flows from a plain reading of the decisions in Evans and Charles
       Osentonº is that an appellate court, even while deciding an appeal against a
       discretionary order granting an interim injunction, has to:
       (a) Examine whether the discretion has been properly exercised i.e. examine
       whether the discretion exercised is not arbitrary, capricious or contrary to the
       principles of law; and
       (b) In addition to the above, an appellate court may in a given case have to
       adjudicate on facts even in such discretionary orders.
       26. The principles of law explained by this Court in Wander have been
       reiterated in a number of subsequent decisions of this Court. However, over a
       period of time the test laid down by this Court as regards the scope of
       interference has been made more stringent. The emphasis is now more on
       perversity rather than a mere error of fact or law in the order granting
       injunction pending the final adjudication of the suit.
       27. In Neon Laboratories Ltd. v. Medical Technologies Ltd., this Court held
       that the appellate court should not flimsily, whimsically or lightly interfere in
       the exercise of discretion by a subordinate court unless such exercise is palpably
       perverse. Perversity can pertain to the understanding of law or the appreciation
       of pleadings or evidence. In other words, the Court took the view that to
       interfere against an order granting or declining to grant a temporary injunction,
       perversity has to be demonstrated in the finding of the trial court.
       28. In Mohd. Mehtab Khan v. Khushnuma Ibrahim Khan, this Court
       emphasised on the principles laid down in Wander- and observed that while
       the view taken by the appellate court may be an equally possible view, the mere
       possibility of taking such a view must not form the basis for setting aside the
       decision arrived at by the trial court in exercise of its discretion under Order 39
       CPC. The basis for substituting the view of the trial court should be mala fides,
       capriciousness, arbitrariness or perversity in the order of the trial court. The
       relevant observations are extracted below: (SCC p. 230, para 20)
           "20. In a situation where the learned trial court on a consideration of the
           respective cases of the parties and the documents laid before it was of the
           view that the entitlement of the plaintiffs to an order of interim
           mandatory injunction was in serious doubt, the appellate court could not
           have interfered with the exercise of discretion by the learned trial Judge
           unless such exercise was found to be palpably incorrect or untenable.
           The reasons that weighed with the learned trial Judge, as already noticed,
           according to us, do not indicate that the view taken is not a possible
           view. The appellate court, therefore, should not have substituted its
           views in the matter merely on the ground that in its opinion the facts of
           the case call for a different conclusion. Such an exercise is not the correct
           parameter for exercise of jurisdiction while hearing an appeal against a
           discretionary order. While we must not be understood to have said that
           the appellate court was wrong in its conclusions what is sought to be



                                         Page 25 of 27
Mane
                                                                                       08-AO-707-26.DOC



           emphasised is that as long as the view of the trial court was a possible
           view the appellate court should not have interfered with the same
           following the virtually settled principles of law in this regard as laid
           down by this Court in Wander Ltd. v. Antox India (P) Ltd."
       29. This Court in Shyam Sel & Power Ltd. v. Shyam Steel Industries Ltd.
       observed that the hierarchy of the trial court and the appellate court exists so
       that the trial court exercises its discretion upon the settled principles of law. An
       appellate court, after the findings of the trial court are recorded, has an
       advantage of appreciating the view taken by the trial Judge and examining the
       correctness or otherwise thereof within the limited area available. It further
       observed that if the appellate court itself decides the matters required to be
       decided by the trial court, there would be no necessity to have the hierarchy of
       courts.
       30. This Court in Monsanto Technology LLC v. Nuziveedu Seeds Ltd.,
       observed that the appellate court should not usurp the jurisdiction of the Single
       Judge to decide as to whether the tests of prima facie case, balance of
       convenience and irreparable injury are made out in the case or not.
       31. The appellate court in an appeal from an interlocutory order granting or
       declining to grant interim injunction is only required to adjudicate the validity
       of such order applying the well-settled principles governing the scope of
       jurisdiction of the appellate court under Order 43 CPC which have been
       reiterated in various other decisions of this Court. The appellate court should
       not assume unlimited jurisdiction and should guide its powers within the
       contours laid down in Wander case.

14.     I am further of the view that the reliance on the in Great Eastern Energy

Corporation Ltd. v. Jain Irrigation Systems Ltd.3 decision by learned counsel on

behalf of Appellants to contend that while granting interim injunction, the term

“prima facie case” also includes an exercise to be undertaken by the Trial Court as

to whether an arguable case exists, and also the material on the face of it shows that

triable issues are involved over and above the settled principles of irreparable injury

and balance of convenience, which has not been done in the present case is a

submission which deserves to be dismissed. This in view of the fact, that in the

present case, all three ingredients exist, as certainly the material on record show

triable issues as held by me in paragraph No. 12 above, and that by granting

injunction to the Appellants, Respondent No. 3 would face irreparable loss,

considering that they are unable to construct the 3 rd and 4th floors on the suit

3 2010 SCC OnLine Bom 248


                                         Page 26 of 27
Mane
                                                                         08-AO-707-26.DOC



property on account of non-removal of suit structure by the Appellants in complete

contravention of the consent terms between the Appellants and Respondent No. 3.

The balance of convenience therefore lies in favour of Respondent No. 3. All these

aspects have been considered by the Trial Court and therefore the impugned order

does not warrant interference.

15.    Considering the aforesaid facts and the settled position of law, I am of the

view that the impugned order has been passed after duly appreciating the facts and

the applicable law. The view taken by the Trial Court is a plausible view and does

not warrant interference by this Court in its appellate jurisdiction.

16.    In view thereof, the Appeal from Order fails and is accordingly dismissed.

The Trial Court is directed to dispose of suit expeditiously. There shall be no order

as to costs.

17.    In view of the dismissal of the Appeal from Order, pending Interim

Application(s), if any do not survive and are accordingly disposed of.




                                           (AARTI SATHE, J.)




                                  Page 27 of 27