Bombay High Court

NUSRAT AZIZ BOBDEversusTHE STATE OF MAHARASHTRA THROU. ITS PRINCIPAL SEC. URBAN DEVELOPMENT DEPT AND ORS

Decided
Disposal
Disposed Off

Holding

The municipal corporation must comply with the MRTP Act, 1966 and the RFCTLARR Act, 2013, and cannot take possession or offer TDR without first determining and paying monetary compensation; the impugned notices are quashed.

Summary

The petitioners, owners of lands slated for a road‑widening project by the Bhiwandi Nizampur City Municipal Corporation (BNCMC), challenged notices that threatened to take over their properties and offered only Transferable Development Rights (TDR) instead of monetary compensation. They alleged violations of Article 300A of the Constitution and the procedural requirements of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 (RFCTLARR Act). The respondents argued that the project was of public interest and sought possession before compensation, relying on a prior division‑bench order permitting possession after compensation within four weeks. The Court, referring to the earlier judgment in Kamla Devi Kumawat’s writ petition, held that BNCMC must follow the Maharashtra Regional and Town Planning Act, 1966 and the RFCTLARR Act, cannot compel TDR without consent, and must determine and pay monetary compensation before taking possession. Consequently, the impugned notices were quashed, and the petitioners were directed to receive compensation before handing over their lands.

Issues considered

  • Whether the municipal corporation can take possession of land for road widening without complying with the statutory acquisition procedure under the MRTP Act and the RFCTLARR Act.
  • Whether offering Transferable Development Rights (TDR) in lieu of monetary compensation, without the landowner’s consent, is permissible.
  • Whether the notices issued by the municipal corporation violate the petitioners’ right to property under Article 300A of the Constitution.

Legislation cited

Subjects

  • land acquisition
  • right to property
  • Article 300A
  • road widening
  • transferable development rights
  • compensation
  • MRTP Act
  • RFCTLARR Act
  • municipal corporation
  • public purpose
  • writ petition
  • quashing notices

Judgment

                                                              1
                                                                               915-919-wp-10833-2025.doc

                                       IN THE HIGH COURT OF JUDICATURE AT BOMBAY
                                               CIVIL APPELLATE JURISDICTION

                                         WRIT PETITION NO. 10833 OF 2025 (Sr. No. 915)

                      Atul Arun Kale and Another                              …Petitioners
                            Versus
                      The State of Maharashtra and Another                    …Respondents

VISHAL                                                    WITH
SUBHASH                                    WRIT PETITION NO. 10993 OF 2025 (Sr. No. 916)
PAREKAR                                                   WITH
Digitally signed by
VISHAL SUBHASH
PAREKAR
                                           WRIT PETITION NO. 10994 OF 2025
Date: 2026.10.01
19:33:57 +0530
                      Nuzrat Aziz Bobhde                                      …Petitioner
                            Versus
                      The State of Maharashtra and Another                    …Respondents

                                                         WITH
                                         WRIT PETITION NO. 6057 OF 2026 (Sr. No. 918)

                      Sameer Abdul Aziz Bobde                                 …Petitioner
                            Versus
                      The State of Maharashtra and Another                    …Respondents

                                                         WITH
                                         WRIT PETITION NO. 9089 OF 2026 (Sr. No. 919)

                      Seema Sudhir Acharya and Others                         …Petitioners
                            Versus
                      The State of Maharashtra and Another                    …Respondents


                                                       ******
                      Mr. Sumit Kothari, for the Petitioners in WP No. 10833 of 2025.
                      Mr. Atharva Dandekar a/w. Mr. Gautam Jain, for the Petitioners in WP
                      Nos. 10993 of 2025, 10994 of 2025, 6057 of 2026 and 9089 of 2026.
                      Mr. N.R. Bubna i/b. Ms. Pooja Malik and Mr. Aryan Achra, for
                      Respondent No. 2- BNCMC.
                      Mr. Rajesh Rekale (through VC), for Respondent Nos. 2 and 3 in WP

                      Vishal Parekar                                                        ….1
                                         2
                                                          915-919-wp-10833-2025.doc


No. 10833 of 2025. And Smt. Tanu Bhatia, for Respondent Nos. 2 and
3 in remaining petitions.
Smt. M.P. Thakur, AGP for the State in WP No. 10883 of 2025 and WP
No. 10994 of 2025.
Smt. P.J. Gavhane, AGP for the State in WP No. 10993 of 2025.
Smt. G.R. Raghuwanshi, AGP for the State in WP Nos 9089 of 2026
and 6057 of 2026.

                                   ******
                               CORAM : MANISH PITALE AND
                                       SHREERAM V. SHIRSAT, JJ.

                               DATE         : 1st OCTOBER, 2026
                                      -----------

P. C. :

1.          These writ petitions are taken up together, as identical issues

arise for consideration.


2.          The petitioners are aggrieved by letters/notices issued by the

respondent-         Bhiwandi    Nizampur     City   Municipal     Corporation

(“respondent Municipal Corporation”) threatening to take over the

lands and structures of the petitioners for undertaking the project of

road widening. In some of the petitions, the petitioners have also

challenged follow-up notices issued by the respondent Municipal

Corporation offering Transferable Development Rights (TDR) instead

of monetary compensation for taking over the lands and structures of

the petitioners for the purposes of road widening.


Vishal Parekar                                                         ….2
                                        3
                                                         915-919-wp-10833-2025.doc


3.          The learned counsel appearing for the petitioners submit that

the high-handed manner in which the respondent Municipal

Corporation has proceeded in the matter indicates that the rights of

the petitioners under Article 300A of the Constitution of India have

been violated. It is submitted that, as per statutory provisions,

including the provisions of the Right to Fair Compensation and

Transparency in Land Acquisition, Rehabilitation and Resettlement

Act, 2013 (“the Act, 2013”), the respondent Municipal Corporation is

required to first undertake the procedure of acquisition, determination

of compensation by passing an appropriate award, disbursing the

amounts, and then taking over possession of the subject lands and

structures. Instead, according to the learned counsel for the

petitioners, the respondent Municipal Corporation has rushed into

issuing the impugned letters/notices that adversely affect the rights of

the petitioners.


4.          The learned counsel for the petitioners rely upon a recent order

dated 29.07.2026 passed by this Court in writ petitions raising

identical issues concerning the very same project of road widening of

the respondent Municipal Corporation. It is submitted that this Court,

after taking note of the position of law, directed that possession of the

Vishal Parekar                                                        ….3
                                      4
                                                      915-919-wp-10833-2025.doc


lands and structures belonging to the petitioners therein could be

taken only after determination and payment of compensation to the

petitioners therein, in accordance with law. It is submitted that a

similar relief may be granted to the petitioners in these writ petitions.


5.          The learned counsel appearing for the respondent Municipal

Corporation have tendered affidavits in reply today in Writ Petition

No. 10833 of 2025 and Writ Petition No. 9089 of 2026. The said

affidavits in reply are taken on record. In the other writ petitions,

reply affidavits are already filed.


6.          The learned counsel appearing for the respondent Municipal

Corporation submit that the project of road widening is in the public

interest, and early completion of the said project is in the interest of

the general public. It is submitted that the respondent Municipal

Corporation is bound to appropriately compensate the affected

persons, but the project of road widening ought not to be delayed. It is

submitted that this Court may consider directing possession of the

lands being handed over to the respondent Municipal Corporation so

that the project of road widening can be completed at the earliest. The

exercise of determination of compensation and payment thereof, in

accordance with law, shall be undertaken by the Municipal

Vishal Parekar                                                     ….4
                                       5
                                                        915-919-wp-10833-2025.doc


Corporation. Reliance is sought to be placed on an order passed by a

Division Bench of this Court wherein it was indicated that the lands

and structures of the affected persons could be handed over and that

compensation could be determined and paid to them within four

weeks of taking over of possession.


7.          We have considered the rival submissions.


8.          We find that the present petitions are squarely covered as per

the aforesaid order dated 29.07.2026 passed by this Court in Writ

Petition No. 1799 of 2026 (Kamla Devi Ramchandra Kumawat vs. The

State of Maharashtra & Ors.) and connected writ petitions. The said

writ petitions also concerned the aforesaid action of the respondent

Municipal Corporation in issuing such letters/notices to identically

situated affected persons for taking over their lands and structures for

the project of road widening. We are of the opinion that the present

petitions can be disposed of in the manner in which the said group of

writ petitions were allowed and disposed of.


9.          For the sake of convenience, the relevant portion of the said

order passed in the case of Kamla Devi Kumawat (supra) is

reproduced below:


Vishal Parekar                                                       ….5
                                           6
                                                                915-919-wp-10833-2025.doc

                 7] We are of the opinion that this Court, while entertaining
                 the present writ petitions, cannot be made a platform for
                 considering the aspect of the extent to which the
                 properties/structures of the Petitioners are authorized or
                 otherwise. The fundamental question that arises for
                 consideration is that when a public body, like the
                 Respondent Municipal Corporation, intends to undertake
                 the task of road widening in order to ensure that the
                 concerned road is widened to the extent as approved in the
                 development plan, as to what is the procedure to be
                 followed in such circumstances. The stand of the
                 Respondent Municipal Corporation clearly shows that it
                 intends to undertake the task of road widening in the light
                 of the width of the road approved in the development plan.
                 This indicates that if the Respondent Municipal
                 Corporation intends to undertake the task of road
                 widening, it would necessarily have to acquire
                 land/property to the extent that the widening of the road is
                 satisfied in terms of the development plan.
                 8] In such circumstances, the Respondent Municipal
                 Corporation would have to move an appropriate proposal
                 before the Respondent State Government for exercising
                 powers under the Maharashtra Regional and Town
                 Planning Act, 1966 (MRTP Act) read with the provisions of
                 the Right to Fair Compensation and Transparency in Land
                 Acquisition, Rehabilitation and Resettlement Act, 2013 (Act
                 of 2013). The requirement of law is that when such a
                 proposal is moved, a specific amount is required to be
                 deposited with the Respondent State/competent authority,
                 so that the steps indicated under the Act of 2013 are duly
                 undertaken for acquisition of properties to satisfy the task
                 of road widening.
                 9] It is upon such proposal being moved and the powers
                 under the MRTP Act and the Act of 2013 being exercised in
                 accordance with law that the process of acquisition would
                 stand triggered. This would entail the stepwise procedure
                 contemplated under the Act of 2013 for granting an
                 opportunity to the persons interested to raise objections as
                 per the statutory provisions of the Act of 2013 applicable to
                 acquisitions under the MRTP Act and after disposal of
                 objections, further steps could be taken for determination
                 of quantum of compensation, pronouncement of the
                 award, offering compensation to the persons entitled to
                 disbursal of such compensation and thereupon taking
                 possession of the land for undertaking the task of road
                 widening.

Vishal Parekar                                                               ….6
                                            7
                                                                915-919-wp-10833-2025.doc

                  10] In the present case, it appears that in its zeal to
                  undertake the action of road widening, the Respondent
                  Municipal Corporation has completely thrown to the winds
                  the statutory requirements noted hereinabove. Admittedly,
                  there is no proposal moved before the Competent Authority
                  of the Respondent State for undertaking the process of
                  acquisition. Instead, the impugned notices were issued to
                  the Petitioners directly asking them to produce certain
                  documents and indicating that the Petitioners would be
                  thrown out of their properties and thereafter, in future if
                  they were able to produce necessary documents, they could
                  be offered compensation by way of TDR. This was followed
                  with the subsequent action within a period of one month of
                  alleging that the structures of the Petitioners were
                  unauthorized and hence, they would be demolished within
                  24 hours for the purpose of road widening.
                  11] We find that the aforesaid impugned actions
                  undertaken by the Respondent Municipal Corporation are
                  wholly arbitrary and unsustainable. The contents of the
                  impugned notices indicate that the Respondent Municipal
                  Corporation is itself aware about the requirement of law to
                  offer compensation to the affected persons, but the said
                  Respondent has refused to follow the statutory
                  requirements and instead a novel method of taking a
                  shortcut to taking possession of lands/properties for the
                  road widening project, has been undertaken. The
                  Respondent Municipal Corporation cannot be permitted to
                  trample upon the rights of the citizens in such a manner
                  and even if it has to undertake the task of the development
                  work of road widening, it has to be done in accordance
                  with law. In the present case, the Respondent Municipal
                  Corporation has nowhere indicated by its actions or the
                  affidavits filed before this Court that the present case was
                  being treated as a case where possession of the subject
                  land/properties was to be taken under the emergency
                  provisions.
                  12] We are of the opinion that the Respondent Municipal
                  Corporation by insisting that the Petitioners would be
                  compensated, if at all, only by way of TDR, violated the
                  position of law clarified by the Full Bench judgment of this
                  Court in the case of Shri Vinayak Builders and
                  Development Nagpur v. State of Maharashtra & Ors 1 . If the
                  land owners or claimants do not give their consent,


1    [2022 (4) MHLJ 739]

Vishal Parekar                                                               ….7
                                           8
                                                                915-919-wp-10833-2025.doc

                 compensation by way of TDR cannot be imposed upon
                 them and the concerned authorities would necessarily be
                 required to determine and pay monetary compensation to
                 the Petitioners.
                 13] In such a situation, we find that the Respondent
                 Municipal Corporation has utterly failed in justifying the
                 notices and the follow up action taken against the
                 Petitioners. The Supreme Court has held that although the
                 right to property has no longer remained a Fundamental
                 Right, under Article 300A of the Constitution of India, it is
                 recognized as a Constitutional Right and Human Right,
                 which cannot be trampled upon by the State and its
                 agencies and instrumentalities.
                 14] In this context, reference can be made to the judgment
                 of the Supreme Court in the case of Kolkata Municipal
                 Corporation v. Bimal Kumar Shah2.
                 15] In the said judgment, the Supreme Court has
                 elaborately discussed various facets of the right to property
                 and seven principles have been specified, which include the
                 right to notice, right to be heard, right to a reasoned
                 decision, the duty to acquire only for public purpose, the
                 right of restitution or fair compensation, the right to an
                 efficient and expeditious process and the right of
                 conclusion. The impugned actions of the Respondent
                 Municipal Corporation show that all the aforesaid
                 principles have been breached and therefore, the
                 Petitioners have made out a case in their favour for the writ
                 petitions to be allowed.
                 16] The learned AGPs confirm the fact that till date, the
                 Municipal Corporation has not forwarded any proposal for
                 acquisition of land/properties for undertaking the said
                 project of road widening.
                 17] In view of the above, the writ petitions are allowed in
                 terms of prayer clauses (a) and (b) in all the petitions.
                 Consequently, the notices dated 10/10/2025, issued by the
                 Respondent Municipal Corporation and further notices
                 dated 14/11/2025 issued to the Petitioners are quashed
                 and set aside. The Respondents are directed to take
                 recourse to the provisions of the Maharashtra Regional and
                 Town Planning Act, 1966 and the Right to Fair
                 Compensation and Transparency in Land Acquisition,
                 Rehabilitation and Resettlement Act, 2013, acquisition and
                 payment of compensation to the Petitioners before taking
2 [2024 (10) SCC 533]

Vishal Parekar                                                               ….8
                                            9
                                                                  915-919-wp-10833-2025.doc

                  possession for undertaking the exercise of road widening.
                  18] Writ petitions are allowed in the above terms.
                  19] Pending applications, if any, also stand disposed of.


10.         We do not wish to repeat and reiterate what was held in the

above-quoted portion of the said order. Since the petitioners in these

writ petitions are identically situated, we intend to grant relief to them

as was granted in the aforesaid bunch of writ petitions.


11.         We find that in some of the writ petitions, the reliefs sought

pertain to initial letters/notices issued by the respondent Municipal

Corporation calling upon the petitioners to produce relevant

documents pertaining to the subject lands and structures, followed up

with further notices offering only TDR as compensation instead of

monetary compensation. Writ Petition Nos. 6057 of 2026 and 9089 of

2026 have been filed by the petitioners seeking a direction against the

respondents to follow the settled position of law to undertake

acquisition and to pay compensation to the petitioners before taking

over possession of their lands and structures for the road widening

project. In these writ petitions also, reference is made to similar

letters/notices issued by the respondent Municipal Corporation calling

upon the petitioners to produce documents in the context of the


Vishal Parekar                                                                 ….9
                                          10
                                                              915-919-wp-10833-2025.doc


requirement of their lands and structures for the road widening

project.


12.         Considering the fact that the petitioners in these petitions are

also found eligible for relief, as was granted to the petitioners in the

aforesaid order dated 29.07.2026 passed in the case of Kamla Devi

Kumawat (supra), we are inclined to allow these writ petitions in the

following manner.


13.         Writ Petition No. 10833 of 2025 is allowed in terms of prayer

clauses (a) and (b-1), which read as under:

                 (a) Issue a writ of certiorari, or other appropriate writ,
                 order or direction calling for the records leading to the
                 issuance of the impugned notice dated 23.07.2025 (Exh.
                 L to the petition) and after going through the legality,
                 validity and propriety of the same, be pleased to quash
                 the same and set it aside.

                 (b-1) Issue a writ of certiorari, or other appropriate writ,
                 order or direction calling for the records leading to the
                 issuance of the impugned notice dated 31.07.2025 (Exh.
                 M1 to the petition) and after going through the legality,
                 validity and propriety of the same, be pleased to quash
                 the same and set it aside.



14.         Writ Petition No. 10993 of 2025 and Writ Petition No. 10994 of

2025 both are allowed in terms of prayer clauses (a) and (c) of the

said writ petitions, which read as follows:
Vishal Parekar                                                             ….10
                                          11
                                                              915-919-wp-10833-2025.doc

                 Writ Petition No. 10993 of 2025 :-

                 (a) Issue a writ of certiorari, or other appropriate writ,
                 order or direction calling for the records leading to the
                 issuance of the first impugned notice dated 23.07.2025
                 (Exh. I to the petition) and after going through the
                 legality, validity and propriety of the same, be pleased to
                 quash the same and set it aside.

                 (c) Issue a writ of certiorari, or other appropriate writ,
                 order or direction calling for the records leading to the
                 issuance of the second impugned notice dated
                 31.07.2025 (Exh. K to the petition) and after going
                 through the legality, validity and propriety of the same,
                 be pleased to quash the same and set it aside.

                 Writ Petition No. 10994 of 2025 :-

                 (a) Issue a writ of certiorari, or other appropriate writ,
                 order or direction calling for the records leading to the
                 issuance of the first impugned notice dated 23.07.2025
                 (Exh. J to the petition) and after going through the
                 legality, validity and propriety of the same, be pleased to
                 quash the same and set it aside.

                 (c) Issue a writ of certiorari, or other appropriate writ,
                 order or direction calling for the records leading to the
                 issuance of the second impugned notice dated
                 31.07.2025 (Exh. L to the petition) and after going
                 through the legality, validity and propriety of the same,
                 be pleased to quash the same and set it aside.



15.         Writ Petition Nos. 6057 of 2026 and 9089 of 2026 are allowed

in terms of prayer clause (a), extracted below:

                 Writ Petition No. 6057 of 2026 :

                 (a) This Hon'ble Court may be pleased to issue a Writ of

Vishal Parekar                                                             ….11
                                         12
                                                             915-919-wp-10833-2025.doc

                 Mandamus or any other Writ, order or direction in the
                 nature of Mandamus thereby directing the Respondent
                 No.1 i.e. the State of Maharashtra to forthwith issue the
                 requisite Notification/ Declaration under the provisions
                 of the Right to Fair Compensation and Transparency in
                 Land Acquisition, Rehabilitation and Resettlement Act,
                 2013 r/w. Section 78 of the M.M.C., Act, 1949 for
                 acquisition of such part of the said plot/said premises
                 being Municipal House No. 65 comprising of Ground
                 floor situate at C.S. No. 2167 situated at Bhiwandi, Dist.
                 Thane as may be required for the Road widening exercise
                 from Bobde Chowk, Toheed Jewellers to Mandai and
                 forthwith remit the amount of compensation to the
                 Petitioner in respect Municipal House No. 65 comprising
                 of Ground floor situate at C.S. No. 2167 situated at
                 Bhiwandi, Dist. Thane.



                 Writ Petition No. 9089 of 2026 :

                 (a) This Hon'ble Court may be pleased to issue a Writ of
                 Mandamus or any other Writ, order or direction in the
                 nature of Mandamus thereby directing the Respondent
                 No.1 i.e. the State of Maharashtra/the State Government
                 to forthwith issue the requisite Notification/Declaration
                 under the provisions of the Right to Fair Compensation
                 and Transparency in Land Acquisition, Rehabilitation and
                 Resettlement Act, 2013 r/w. Section 78 of the M.M.C.,
                 Act, 1949 for acquisition of such part of the said plots
                 and/or said premises being Municipal House Nos.
                 34/1/G/2, 34/1/G/3, 34/1/G/5, 34/2, 34/3, 34/5,
                 34/6, 34/8, and 34/9 situated in "Acharya Building"
                 comprised of Ground plus three floors situate at C.S. No.
                 2235, 2236 and 2237 situated at Bhiwandi, Dist. Thane
                 as may be required for the Road widening exercise from
                 Bobde Chowk, Toheed Jewellers to Mandai and forthwith
                 remit the amount of compensation to the Petitioners in
                 respect of the said plots and said premises.

Vishal Parekar                                                            ….12
                                         13
                                                             915-919-wp-10833-2025.doc


16.         Consequent upon quashing of the impugned letters/notices and

the writ petitions being allowed in the aforesaid manner, the

respondents are directed to take recourse to the provisions of the

relevant statutes, including the Right to Fair Compensation and

Transparency in Land Acquisition, Rehabilitation and Resettlement

Act, 2013 to undertake the exercise of acquisition, determination of

compensation,          pronouncement       of   awards,    and     disbursal       of

compensation to the petitioners.


17.         Upon such disbursal of compensation, the petitioners shall hand

over the subject lands and structures to the respondent Municipal

Corporation within four weeks of disbursal of the amount of

compensation.


18.         Needless to say, the petitioners would be at liberty to institute

appropriate proceedings if they are aggrieved by the determination of

quantum of compensation. However, handing over of possession shall

not be delayed on that count.


19.         It is further clarified that the order passed in these writ petitions

has no bearing on any structures that may be found to be illegal on

the subject lands.


Vishal Parekar                                                            ….13
                                        14
                                                        915-919-wp-10833-2025.doc


20.         The order passed today will not come in the way of the parties

to proceed for acquisition by consent, considering the fact that the

respondent Municipal Corporation is undertaking a project of road

widening which is in the larger interest of the public.




                 (SHREERAM V. SHIRSAT, J.)        (MANISH PITALE, J.)




Vishal Parekar                                                       ….14


Continue reading with your account

Sign in to read the full judgment. It’s free.

Sign in to read

Checking your session…

Lawyer court records for this case

Associated through the court’s case reference.

For a signed copy suitable for filing, refer to the court's website.