Bombay High Court

ANTONY IRINEUS CARNEIROversusFRANCIS COLACO AND ORS

Decided
Disposal
Disposed Off

Holding

The High Court held that the Co-operative Court retains jurisdiction to decide the legality of agenda notices and resolutions even when they pertain to redevelopment, and therefore the writ petitions seeking dismissal of the disputes were dismissed.

Summary

The petitioners, members of Everard Co-operative Housing Society, challenged the jurisdiction of the Co-operative Court to hear disputes arising from special general body meetings (SGBMs) convened to discuss the society's redevelopment. The lower courts had returned the disputes to a civil court, holding that redevelopment does not fall within the business of a co-operative society under Section 91 of the Maharashtra Co-operative Societies Act, 1960. The appellants argued that the disputes concerned the legality of agenda notices and resolutions, not the redevelopment itself, and that the Co-operative Court retained exclusive jurisdiction. The High Court examined the statutory framework, relevant Supreme Court and Bombay High Court precedents, and the effect of the 2019 amendment to the Act, concluding that the presence of redevelopment in the resolutions does not automatically divest the Co-operative Court of jurisdiction. Consequently, the Court upheld the appellate court’s decision to restore the disputes to the Co-operative Court and dismissed the writ petitions.

Issues considered

  • The scope of Section 91 of the Maharashtra Co-operative Societies Act, 1960 with respect to disputes involving redevelopment of society premises.
  • Whether the Co-operative Court has exclusive jurisdiction to adjudicate challenges to agenda notices and resolutions of SGBMs when the underlying subject matter is redevelopment.
  • The effect of the 2019 amendment to the Act (Section 154B(1)(17)) on the jurisdictional analysis.
  • The appropriateness of rejecting the disputes at the threshold under Order VII Rule 11 of the CPC.

Legislation cited

Subjects

  • Co-operative societies
  • Section 91 jurisdiction
  • Redevelopment
  • Special General Body Meeting
  • Agenda notice validity
  • Resolution validity
  • Civil Court vs Co-operative Court
  • Article 227 writ petition
  • Order VII Rule 11
  • Order VII Rule 10

Judgment

                                                                     -WP-9817-2026+.DOC




                            IN THE HIGH COURT OF JUDICATURE AT BOMBAY
                                      CIVIL APPELLATE JURISDICTION
                                    WRIT PETITION NO. 9817 OF 2026


                   1. Anthony Irineus Carneiro
                   Age: 74 Adult, Occupation – Retired
                   Flat No. I/14, Everard CHS Ltd.,
                   Everard Nagar, Eastern Express
                   Highway, Sion, Mumbai 400 022.

                   2. Hayley Maria Misquitta
                   Age 59, Adult, Occupation – Housewife
                   Flat No. H/8, Everard Nagar,
                   Easter Express Highway,
                   Sion, Mumbai 400 022.                               ...Petitioners


                         Versus

                   1. Francis Colaco
                   Age : Adult, Occupation – Broker
                   Flat No. K/6, Everard CHS Ltd,
                   Everard Nagar, Eastern Express
                   Highway, Sion, Mumbai 400 022.

                   2. Raymond Nogueira,
ARUN               Age – Adult, Occupation – Business,
RAMCHANDRA
SANKPAL            Flat No. B/12, Everard CHS Ltd.,
Digitally signed
                   Everard Nagar, Eastern Express
by ARUN
RAMCHANDRA         Highway, Sion, Mumbai 400 022.
SANKPAL
Date: 2026.09.19
15:14:10 +0530
                   3. Mathew Sunny
                   Age : Adult, Occupation-Business,
                   Flat No. B/2, Everard CHS Ltd,
                   Everard Nagar, Eastern Express
                   Highway, Sion, Mumbai 400 022.

                   4. Everard Co-operative Housing Society Ltd
                   A co-operative Housing Society registered

                   ARS                                   1/37
                                                 -WP-9817-2026+.DOC

under the provisions of the MCS Act, 1960,
Having its registration No. MUM-2/HSG/
(TC), 9458 of 2006-2007 dated 05.06.2006
and having address at Everard Nagar,
Eastern Express Highway, Sion,
Mumbai – 400 022.

5. The Hon’ble Chairman
Everard CHS Ltd, having its address at
Everard Nagar, Eastern Express Highway,
Sion, Mumbai – 400 022.

6. The Hon’ble Secretary
Everard CHS Ltd, having its address at
Everard Nagar, Eastern Express Highway,
Sion, Mumbai – 400 022.

7. The Hon’ble Treasurer
Everard CHS Ltd, having its address at
Everard Nagar, Eastern Express Highway,
                                                 …Respondents
Sion, Mumbai – 400 022.

                               WITH
                WRIT PETITION NO. 9818 OF 2026

Anthony Irineus Carneiro
Age: Adult, Occupation – Retired
Flat No. I/14, Everard CHS Ltd.,
Everard Nagar, Eastern Express
Highway, Sion, Mumbai 400 022.                      ...Petitioner


      Versus

1. Francis Colaco
Age : Adult, Occupation – Broker
Flat No. K/6, Everard CHS Ltd,
Everard Nagar, Eastern Express
Highway, Sion, Mumbai 400 022.

2. Mathew Sunny
Age : Adult, Occupation-Business,
Flat No. B/2, Everard CHS Ltd,

ARS                                 2/37
                                                  -WP-9817-2026+.DOC

Everard Nagar, Eastern Express
Highway, Sion, Mumbai 400 022.

3. Everard Co-operative Housing Society Ltd
A co-operative Housing Society registered
under the provisions of the MCS Act, 1960,
Having its registration No. MUM-2/HSG/
(TC), 9458 of 2006-2007 dated 05.06.2006
and having address at Everard Nagar,
Eastern Express Highway, Sion,
Mumbai – 400 022.

4. The Hon’ble Chairman
Everard CHS Ltd, having its address at
Everard Nagar, Eastern Express Highway,
Sion, Mumbai – 400 022.

5. The Hon’ble Secretary
Everard CHS Ltd, having its address at
Everard Nagar, Eastern Express Highway,
Sion, Mumbai – 400 022.

6. The Hon’ble Treasurer
Everard CHS Ltd, having its address at
Everard Nagar, Eastern Express Highway,
Sion, Mumbai – 400 022.

7. Aron Pinto
Age: Adult, Occupation- __
Flat No. E/5, Everard CHS Ltd,
Having its address at Everard Nagar,
Eastern Express Highway, Sion,                    …Respondents
Mumbai 400 022.

                               WITH
                 WRIT PETITION NO. 9820 OF 2026

1. Everard Co-operative Housing Society Ltd
Through its Chairman,
Anthony Irineus Carneiro
A co-operative Housing Society registered
under the provisions of the MCS Act, 1960,
Having address at Everard Nagar,

ARS                                    3/37
                                              -WP-9817-2026+.DOC

Eastern Express Highway, Sion,
Mumbai – 400 022.

2. The Hon’ble Chairman
Everard CHS Ltd, having its address at
Everard Nagar, Eastern Express Highway,
Sion, Mumbai – 400 022.

3. The Hon’ble Secretary
Everard CHS Ltd, having its address at
Everard Nagar, Eastern Express Highway,         ...Petitioners
Sion, Mumbai – 400 022.


      Versus

1. Francis Colaco
Age : Adult, Occupation – Broker
Flat No. K/6, Everard CHS Ltd,
Everard Nagar, Eastern Express
Highway, Sion, Mumbai 400 022.

2. Mathew Sunny
Age : Adult, Occupation-Business,
Flat No. B/2, Everard CHS Ltd,
Everard Nagar, Eastern Express
Highway, Sion, Mumbai 400 022.

3. Anthony Irineus Carneiro
Age: Adult, Occupation – Retired
Flat No. I/14, Everard CHS Ltd.,
Everard Nagar, Eastern Express
Highway, Sion, Mumbai 400 022.

4. Aron Pinto
Age: Adult, Occupation- Service,
Flat No. E/5, Everard CHS Ltd,
Having its address at Everard Nagar,
Eastern Express Highway, Sion,
Mumbai 400 022.

5. The Hon’ble Treasurer
Everard CHS Ltd, having its address at
Everard Nagar, Eastern Express Highway,
                                              …Respondents
ARS                                    4/37
                                                 -WP-9817-2026+.DOC

Sion, Mumbai – 400 022.

                               WITH
                WRIT PETITION NO. 9821 OF 2026

1. Everard Co-operative Housing Society Ltd
Through its Chairman,
Anthony Irineus Carneiro
A co-operative Housing Society registered
under the provisions of the MCS Act, 1960,
Having address at Everard Nagar,
Eastern Express Highway, Sion,
Mumbai – 400 022.

2. The Hon’ble Chairman
Everard CHS Ltd, having its address at
Everard Nagar, Eastern Express Highway,
Sion, Mumbai – 400 022.

3. The Hon’ble Secretary
Everard CHS Ltd, having its address at
Everard Nagar, Eastern Express Highway,            ...Petitioners
Sion, Mumbai – 400 022.


      Versus

1. Francis Colaco
Age : Adult, Occupation – Broker
Flat No. K/6, Everard CHS Ltd,
Everard Nagar, Eastern Express
Highway, Sion, Mumbai 400 022.

2. Raymond Nogueira,
Age – Adult, Occupation – Business,
Flat No. B/12, Everard CHS Ltd.,
Everard Nagar, Eastern Express
Highway, Sion, Mumbai 400 022.

3. Mathew Sunny
Age : Adult, Occupation-Business,
Flat No. B/2, Everard CHS Ltd,
Everard Nagar, Eastern Express

ARS                                   5/37
                                                          -WP-9817-2026+.DOC

Highway, Sion, Mumbai 400 022.

4. Anthony Irineus Carneiro
Age: Adult, Occupation – Retired
Flat No. I/14, Everard CHS Ltd.,
Everard Nagar, Eastern Express
Highway, Sion, Mumbai 400 022.

5. Hayley Maria Misquitta
Age - Adult, Occupation – Housewife
Flat No. H/8, Everard Nagar,
Easter Express Highway,
Sion, Mumbai 400 022.                                    …Respondents

6. The Hon’ble Treasurer
Everard CHS Ltd, having its address at
Everard Nagar, Eastern Express Highway,
Sion, Mumbai – 400 022.


Mr. Saket Mone, with Abhishek Salian, Ayesha Dhorajiwalla, i/b
      Nyaaya Legal, for the Petitioners in WP/9817/2026 and
      WP/9818/2026.
Mr. Saket Mone, with Shrey Shah and Mitali Dhoble, i/b Vidhi
      Partners, for the Petitioners in WP/9820/2026.
Mr. Pravin Samdani, Senior Advocate, with Mayur Khandeparkar,
      Saket Mone, Shrey Shah and Mitali Dhoble, for the Petitioners
      in WP/9821/2026.
Mr. Akash Rebello, i/b Dinesh Rane, for Respondent Nos. 1 to 3 in
      WP/9818/2026 and 9817/2026.
Mr. Vineet Naik, Senior Advocate, i/b Dinesh Rane, for Respondent
      Nos. 1 to 3 in WP/9820/2026 and WP/9821/2026.


                           CORAM:            N. J. JAMADAR, J.
                    RESERVED ON :            1st SEPTEMBER 2026
                PRONOUNCED ON :              18th SEPTEMBER 2026


JUDGMENT:




ARS                                   6/37
                                                            -WP-9817-2026+.DOC

1.    Rule. Rule made returnable forthwith, and, with the consent of

the learned Counsel for the parties, heard finally.

2.    As common questions of fact and law arise for consideration in a

somewhat identical fact-situation, all the Petitions were taken up for

hearing together and are decided by this common judgment.

3.     By these Petitions under Article 227 of the Constitution of India,

the Petitioners take exception to the judgments and orders dated 28 th

April 2026 passed by the Maharashtra State Co-operative Appellate

Court, Mumbai, in Appeal Nos. 14 of 2025 and 15 of 2025, whereby the

Appeals preferred by the Respondents-Original Disputants against

orders dated 17th February 2025 passed by the learned Judge, Co-

operative   Court   No.    III,   thereby     returning   the   Dispute   No.

CC/III/92/2024 and Dispute No. CC/III/449 of 2024 to the Disputants

for presentation to the jurisdictional Civil Court, came to be allowed by

setting aside the orders passed by the Co-operative Court and

resultantly above-numbered disputes stood restored to the file of the

Co-operative Court for disposal in accordance with law.

4.    The background facts leading to these Petitions can be stated in

brief as under:

4.1   Respondent Nos. 1 to 3 in Writ Petition No. 9817 of 2026 are the

members of Everard CHS Ltd (R4). Petitioner Nos. 1 and 2 are the

members and the Chairman and Secretary, respectively, of Respondent


ARS                                    7/37
                                                         -WP-9817-2026+.DOC

No.1-society. Respondent No.4 is a society registered under the

provisions of Maharashtra Co-operative Societies Act, 1960, (“the MCS

Act, 1960”). Respondent No.4 is the owner of piece and parcel of the

land situated at CTS No. 628 having its address at Everard Nagar,

Eastern Express Highway, Sion, Mumbai-400 022 (“the subject

property”).

4.2   The society has about 230 members. The affairs of the society are

embroiled in differences, disputes and the resultant litigations.

DISPUTE NO. CC/III/449/2024:

4.3   In Dispute No. CC/III/449 of 2024, the Respondent Nos. 1 to 3-

Disputants approached the Co-operative Court assailing the legality and

validity of the agenda notice dated 22 nd August 2022 on multi-fold

grounds including that the Secretary of the society (Opponent No.3

therein) had no Authority to convene a Special General Body Meeting

(“SGBM”) and thus it was void. The said SGBM was not convened in

accordance with the mandatory procedure. The purported business

carried out in the said meeting was in gross violation of the provisions

of the MCS Act 1960 and The Maharashtra Co-operative Societies Rules,

1961 (“MCS Rules, 1961”)and the bye-laws of the society and the

Resolutions passed therein were illegal and void. It was, inter alia,

contended that purported Resolution-3 under Agenda Item-4 was




ARS                                   8/37
                                                       -WP-9817-2026+.DOC

inconsistent or contrary to the provisions of law and was thus liable to

be quashed and set aside.

4.4   The Disputants claimed that the dispute was confined to the

conduct of the General Meeting and the Management of the society. The

Disputants thus sought declaratory and injunctive reliefs in regard to

the said agenda notice dated 22nd August 2022 and the Resolution No.3

passed in SGBM dated 28th August 2022.

DISPUTE NO. CC/III/92/2024:

4.5   In Dispute No. CC/III/92/2024, the Respondent Nos. 1 and 3-

Disputants approached the Co-operative Court raising the dispute to the

effect that, the complaints were filed with the Deputy Registrar, Co-

operative Societies regarding the management of the affairs of the

Society by its office bearers-Opponent Nos. 2 to 4 therein. The Deputy

Registrar had passed an order dated 5th December 2023. A Revision

Application was filed before the Divisional Joint Registrar, against the

said order.

4.6   In the said Revision Application, on 25 th January 2024, the

Divisional Joint Registrar had passed an ad-interim order directing the

parties to maintain status-quo in terms of prayer clause (b). Yet the

managing committee of the Society held a meeting on the following

day, i.e., 26th January 2024 and decided to convene a SGBM of the

society and, accordingly, a notice was issued on 27th January 2024.


ARS                                  9/37
                                                           -WP-9817-2026+.DOC

4.7   On 28th January 2024, purportedly in breach of the order passed

by the Divisional Joint Registrar, an emergency SGBM of the society was

held and a Resolution was passed authorising three members, Opponent

Nos. 5 to 7 therein, to take the redevelopment process ahead, to

convene SGBM and continue to take decisions without approaching the

authorised officer appointed by the Deputy Registrar/Divisional Joint

Registrar of the Co-operative Societies. The Disputants alleged, the said

Resolution was in gross violation of the provisions of the MCS Act, 1960

and MCS Rules, 1961 and was passed with an oblique motive to

circumvent the orders passed by the Divisional Joint Registrar,

restraining the society from taking any policy decision.

4.8   The Disputants averred, on 19th February 2024 another agenda

notice was published convening the SGBM on 25 th February 2024. The

said agenda notice was also illegal, null and void.

4.9   The Disputants thus sought the reliefs that the management

committee resolution dated 27th January 2024 was illegal and void,

SGBM of the society dated 28 th January 2024 was illegal and the

Resolution passed therein was also null and void, the agenda notice

dated 19th February 2024 was bad-in-law, illegal and void, and the

consequential injunctive reliefs.

4.10 In    Dispute No. CC/III/92/2024 by an order dated 10 th April

2024, the learned Judge, Co-operative Court granted interim injunction


ARS                                  10/37
                                                         -WP-9817-2026+.DOC

and thereby stayed the effect and implementation of the SGBM

Resolutions dated 28th January 2024 and restrained the Opponent Nos.

1 to 7 therein from taking steps and/or holding SGBM, pursuant to the

agenda notice dated 27th January 2024, directed them to maintain

status-quo with immediate effect and also restrained them from taking

any steps in pursuance of the aforesaid Resolutions with regard to

the affairs of the society, including redevelopment of the society

property.

APPLICATIONS FOR REJECTION OF DISPUTES:

4.11 Opponents in the Disputes filed Applications seeking dismissal of

the Disputes contending that the Co-operative Court had no jurisdiction

to adjudicate the Disputes pertaining to the redevelopment of the

society premises, as that did not touch upon the business of the society.

4.12 By orders dated 17th February 2025, the learned Judge, Co-

operative Court, was persuaded to return a finding that the dispute

between the parties was essentially in respect of the process of

redevelopment of the society premises. Since there were precedents

which enunciated that redevelopment of the society premises does not

touch upon the business of the society, the Disputes were barred by law

of precedent,     and, consequently, the Co-operative Court cannot

entertain such disputes. In the view of the learned Judge, Co-operative

Court, the Disputes were required to be returned to the Disputants for


ARS                                  11/37
                                                         -WP-9817-2026+.DOC

presentation before the competent Civil Court. Accordingly, the Disputes

were directed to be returned to the Disputants by invoking the power

under Order VII Rule 10 of the Code of Civil Procedure, 1908 (“the

Code”).

APPEALS BEFORE THE CO-OPERATIVE APPELLATE COURT:

4.13 Being aggrieved, the Disputants preferred Appeals before the Co-

operative Appellate Court.

4.14 By the impugned judgments and orders, the leaned Member, Co-

operative Appellate Court allowed the Appeals, set aside the order of

return of Disputes and restored the Disputes to the file of the Co-

operative Court. The learned Member was of the view that the Disputes

were between the enumerated persons and primarily in relation to the

conduct of the General Meetings of the society and, therefore, the Co-

operative Court had exclusive jurisdiction to entertain, try and decide

the disputes.

4.15 The learned Judge, Co-operative Court, in the view of the learned

Member, did not properly comprehend the real nature of the disputes.

Banking heavily upon a decision of a learned Single Judge, in the case

of The Bank of India Staff Panchsheel Co-operative Housing Society Ltd

Vs Jitendra Kumar Jani and Ors,1 the learned Member held that the

disputes were exclusively triable by the Co-operative Court and,



1     Writ Petition No. 8889 of 2024, decided on 19th December 2025.
ARS                                  12/37
                                                        -WP-9817-2026+.DOC

therefore, there was no justifiable reason for the return of the Disputes

for presentation to the Civil Court.

4.16   Being aggrieved by and dissatisfied with the impugned judgment

and order in Appeal No. 14 of 2025, thereby restoring Dispute No.

CC/III/449 of 2024, the Society, Chairman and Secretary-Opponent

Nos. 1 to 3 in Dispute No. CC/III/419 of 2024, have preferred Writ

Petition No. 9821 of 2026 and Anthony Irineus Carneiro and Hayley

Maria Misquitta, the Interveners in Appeal No. 14 of 2025, have

preferred Writ Petition No. 9817 of 2026.

4.17 Likewise, being aggrieved by the impugned order in Appeal No.

15 of 2025, thereby restoring Dispute No. CC/III/92 of 2024, the

Society, Chairman and Secretary—Opponent Nos. 1 to 3 in Dispute No.

CC/III/92 of 2024, have preferred Writ Petition No.9820 of 2026 and

Anthony Irineus Carneiro—Opponent No. 5 therein, has preferred Writ

Petition No. 9818 of 2026.

5.     I have heard, Mr. Pravin Samdani, the leaned Senior Advocate

for the Petitioners in Writ Petition No. 9821 of 2026, Mr. Saket Mone,

the learned Counsel for the Petitioners in Writ Petition Nos. 9817 of

2026, Writ Petition No. 9818 of 2026 and Writ Petition No 9820/2026,

Mr. Vineet Naik, the learned Senior Advocate, for Respondent Nos. 1 to

3 in Writ Petition Nos. 9820 of 2026 and 9821 of 2026 and Mr. Akash

Rebello, the learned Counsel for Respondent Nos. 1 to 3 in Writ Petition


ARS                                    13/37
                                                        -WP-9817-2026+.DOC

Nos. 9818 of 2026 and 9817 of 2026. With the assistance of the learned

Counsel for the parties, I have also perused the pleading, orders passed

by the Courts below and the material on record.

SUBMISSIONS ON BEHALF OF PETITIONERS:

6.     The thrust of the submissions on behalf fo the Petitioner was that

the learned Member, Co-operative Court, committed a gross error in law

in not appreciating the real dispute between the Disputants, on the one

part, and the society and the large body of members, on the other part.

The genesis of the dispute was in the process of redevelopment initiated

by the society. It was submitted that the Appellate Court failed to

appreciate that redevelopment does not constitute or relate to the

“business of the society” within the meaning of Section 91 of the MCS

Act, 1960. Resultantly in view of the express bar contained in Section

91(3) of the MCS Act, 1960, the Co-operative Court lacked jurisdiction

to entertain and adjudicate the disputes between the parties.

7.    The learned Member, according to the learned Counsel for the

Petitioners, read the disputes in a superficial and formalistic manner.

The assertion of the Disputants that the dispute was in relation to the

General Meetings of the society, was a clear subterfuge which learned

Member, Appellate Court failed to decipher.

8.    It was urged on behalf of the Petitioners that had the learned

Member read the averments in the disputes in a correct perspective, like


ARS                                 14/37
                                                        -WP-9817-2026+.DOC

the learned Judge, Co-operative Court did do, it would have been

clearly realised that the Disputants had resorted to clever drafting to

mask the essential dispute between the parties.

9.    Even where the apparent dispute pertains to the conduct of the

meetings and the Resolutions passed therein, but the underlying dispute

is in relation to the redevelopment, only the Civil Court has the

jurisdiction as Civil Court can grant reliefs in relation to both the

legality and validity of the resolutions passed in the meetings of the

society and the disputes emanating from redevelopment process.

10.   The agenda notice dated 22nd August 2022 and the Resolutions

passed in SGBM dated 28th August 2022, were in respect of the

redevelopment of the society. Thus the redevelopment of the society

was in essence the substance of the subject matter of the disputes

between the parties. It was urged with a degree of vehemence that by a

catena of decisions it has been fairly crystallized that, ‘redevelopment’

of the Society premises does not touch upon the business of the Society

and any dispute in relation to the redevelopment is beyond the

jurisdictional competence of the Co-operative Court.

11.   To lend support to these submission, the learned Counsel for the

Petitioners placed reliance on the judgment of the Supreme Court in the

case of Margret Almeida And Ors Vs Bombay Catholic Co-operative

Housing Society Limited and Ors,2 a Division Bench judgment of this

2     (2012) 5 SCC 642.
ARS                                 15/37
                                                           -WP-9817-2026+.DOC

Court in the case of Mohinder Kaur Kochar Vs Mayfair Housing Private

Ltd & Ors,3 an order of a learned Single Judge of this Court in the case

of Parimal H Solanki In the matter of Bhoumik Co-operative Housing

Society Limited and Anr Vs Vina A Sisawala and Ors 4 and a judgment of

a learned Single Judge of this Court in the case of Komal Arvind

Vesavkar & Ors Vs Vesawa Koli Sarvoday Sahakari Society.5

12.     The learned Counsel for the Petitioners were in unison on the

point that the decision in the case of The Bank of India Staff Panchsheel

Co-operative Housing Society Ltd (Supra), from which support was

drawn by the Appellate Court, did not govern the fact-situation in the

instant case. In any event, the import of the said decision in the case of

The Bank of India Staff Panchsheel Co-operative Housing Society Ltd

(Supra) was explained by a learned Single Judge of this Court in the

case of Baliram Totaram Misal & Ors Vs Saujanya Co-operative Housing

Society Ltd.6

SUBMISSIONS ON BEHALF OF THE RESPONDENTS:

13.   Per contra, Mr. Vineet Naik, the learned Senior Advocate and Mr.

Akash Rebello, the learned Counsel for Respondent Nos. 1 to 3 in the

respective Petitions, would submit that the Appellate Court has correctly
3     Original Side Appeal (L) No. 474 of 2012, decided on 1 st August 2012.
4     Original Side Interim Application (L) No. 25993 of 2022 decided on 6 th
October 2022.
5     Appellate Side Writ Petition No. 8254 of 2022 decided on 15 th January
2025.
6     Appellate Side Writ Petition No. 15791 of 2025 decided on 27 th August
2026.
ARS                                   16/37
                                                       -WP-9817-2026+.DOC

exercised the jurisdiction to correct the error which was committed by

the Trial Court. Since the learned Judge, Co-operative Court exercised

the power under Order VII Rule 10 of the Code, though the Petitioners

were seeking the rejection of the Disputes, what was required to be

considered was the averments in the Disputes. Taking the Court through

the assertions of the of the Disputants in the respective Disputes, the

learned Counsel submitted that the twin test of the dispute being

between the parties enumerated under Section 91 of the MCS Act, 1960

and the subject matter of the dispute being the conduct of the General

Meetings and the management of the society, was clearly satisfied.

14.   The learned Counsel laid emphasis on the fact that though the

meeting dated 28th August 2022 was convened also to discuss the issue

of redevelopment, yet, it did not imply that the subject matter of the

dispute was only the redevelopment of the society premises. It was

urged that, the question whether the dispute falls within the exclusive

jurisdiction of the Co-operative Court is required to be determined in

the context of the facts of the given case and no universal rule can be

applied.

15.   The learned Counsel would urge, in the case at hand, the

Disputants were assailing the competence of the persons who convened

the meetings, the legality and validity of the agenda notices, the

meetings of the General Body held in the breach of the orders passed by


ARS                                 17/37
                                                           -WP-9817-2026+.DOC

the Joint Registrar, Co-operative Societies, and the Resolutions passed

therein. The disputes were thus not confined to redevelopment as such.

16.   The decision, in the case of        Baliram Totaram Misal & Ors

(Supra), according to the learned Counsel for the Respondent Nos. 1 to

3, has no application to the facts of the case as in that case two

proceedings     were instituted,    one challenging      the Development

Agreement before the Civil Court and another challenging the

Resolutions on the strength of which such Agreements were executed.

In that context, the learned Single Judge held that both the challenges

must be by way of a consolidated proceeding before a Civil Court. In

contrast, according to the learned Counsel for Respondent Nos. 1 to 3,

the decision in the case of The Bank of India Staff Panchsheel Co-

operative Housing Society Ltd (Supra), squarely governs the facts of the

case at hand.

CONSIDERATION:

17.    To begin with, at the stage of determining an application for

rejection of the Disputes in view of the statutory bar, it is trite, only the

averments in the Disputes and the documents annexed thereto are

required to be read. The defence of the Defendants is not at all germane

to the determination of the question as to whether the Disputes deserve

to be rejected or for that matter the Disputes were required to be




ARS                                   18/37
                                                         -WP-9817-2026+.DOC

returned for presentation to the proper Court, if the Courts finds that it

lacked jurisdiction to entertain, try and decide the Disputes.

18.    It is equally well-settled the averments in the Disputes are

required to be read as a whole and in a meaningful and not formalistic

manner. If the Court finds that by resorting to clever drafting an illusion

of a cause of action was created or the statutory bar to the

maintainability of the Disputes was sought to be circumvented, the

Court is empowered to nip in the bud such abortive and fruitless

litigation.

NATURE OF THE DISPUTES:

19.    In Dispute No. CC/III/449 of 2024, the Disputants have sought

reliefs in respect of the agenda notice dated 22nd August 2022 and the

Resolution No.3 passed in the SGBM dated 28th August 2022. The notice

dated 22nd August 2022 convening the SGBM of the society on 28 th

August 2022, reveals that amongst other items in the Agenda, the

meeting was convened, “to discuss the redevelopment (Agenda Item –

4)”. The Resolution No. 3 purportedly passed in the said SGBM, records

that the society resolved to reconfirm the Resolutions passed in the

SGBM held on 9th June 2019 cancelling the letter of intent and it

resolved to authorise the managing committee to explore the options

available for redevelopment of the society’s premises.




ARS                                  19/37
                                                            -WP-9817-2026+.DOC

20.   In the aforesaid context, the challenge purportedly mounted in

Dispute No. CC/III/449 of 2024 deserves to be appreciated. The nature

of the challenge is summarised in paragraph 4 of the Dispute as under:

      “4.   By this dispute, the Disputants have challenged:
      (a)   Agenda Notice dt. 22.8.2022, on various grounds, inter
      alia, that the Opponent No.3 had no authority/jurisdiction to
      call Special General Body Meeting (SGBM), consequently it is
      void and non-est in law;
      (b)   The procedure mandated for calling SGBM has been
      violated at every stage.
      (c)   Without offering opportunity to express views in the
      SGBM, meeting is concluded and purported minutes have been
      issued, so called procedure adopted is in gross violation of
      provisions made in the Act, Rules and Bye-laws, and
      (d)   The purported resolution No.3 under Agenda No. 4 is
      inconsistent and/or contrary to the provisions of law, for the
      reasons and in the facts and circumstances mentioned
      hereinafter, consequently the said purported resolution No.3 dt.
      28.8.2022    under    Agenda   No.4     of   Agenda   Notice   dt.
      22.8.2022(for short “impugned resolution”) is illegal and liable
      to be quashed and set aside.
      The Disputants state that, by this Dispute Application, the
      Disputants have restricted their grievances i.e., cause of action
      and the reliefs to the extent of challenging agenda notice and
      impugned resolution touching to the conduct of general meeting
      and management. Consequently, the Dispute fall within the
      ambit of Sec. 91 of the MCS Act.”


21.   In paragraphs 5 and 6 of the Dispute, the Disputants have further

elaborated the grounds of challenge to the agenda notice and the

ARS                                   20/37
                                                          -WP-9817-2026+.DOC

Resolution No. 3 passed in the SGBM dated 28 th August 2022. Various

acts of omission and commission have been attributed which, according

to the Disputants, invalidate the notice dated 22 nd August 2022 and the

Resolution No. 3 passed in SGBM dated 28th August 2022.

22.   In Dispute No. CC/III/92/2024, the Disputants, have questioned

the legality and validity of the SGBM dated 28 th January 2024 and the

Resolutions passed in the said meeting. The Disputants have also sought

declaration in regard to the Resolution dated 27 th January 2024 passed

by the managing committee of the society and that the agenda notice

dated 19th February 2024 is void and illegal.

23.   From the perusal of the averments in the               Dispute No.

CC/III/92/2024, it becomes clear that the foundation of the challenge

to the legality and validity to the aforesaid meeting and the Resolutions

passed therein is an order dated 25th January 2024 passed by the

Divisional Joint Registrar in Revision Application No. 28 of 2024.

Incontrovertibly, on 25th January 2024, the Divisional Joint Registrar

passed an interim order in the said Revision in the following terms, as

extracted in paragraph 9 of the Dispute No. CC/III/92/2024.

      “9. … … …


      “Meanwhile both parties are directed to maintain status quo in
      respect of prayer clause ‘b’ of main R.A. till next date of
      hearing.”



ARS                                  21/37
                                                          -WP-9817-2026+.DOC

      The prayer clause ‘b’ of the Revision Application as reiterated
      hereinbelow for the sake of brevity:


      “That this Hon’ble Authority be pleased to call for papers,
      records and proceedings pertaining to the proceedings being
      carried out under Section 89-A of the said Act and grant urgent
      stay by refraining the Managing Committee of the Respondent
      No. 2 Society from taking any policy decisions till disposal of
      the Section 89-A proceedings and various other complaints as
      filed before the Dy Registrar.”


24.        On 27th January 2024, the notice convening the emergency

SGBM of the society on 28th January 2024 was issued. One of the

agenda items, which was to be discussed in the said emergency SGBM

was as under:

      “                    AGENDA
      1. … … …
      ………
      5.       In view of the non-co-operative members – complainants
      Mr. Francis Colaco, Mr. Mathew Sunny, Ms Maydinee Date having
      approached the Divisional Joint Registrar and in a worst case
      scenario as an outcome of which an Authorised Officer is
      appointed by the Dy Registrar/Div Jt Registrar then the General
      Body should authorise 3 members to take the redevelopment
      process ahead and further authorise the 3 members to convene
      SPGM without approaching the Managing Committee and/or
      Authorised Officer if appointed by the Deputy Registrar/Div Jt
      Registrar of the Co-operative Societies.”




ARS                                     22/37
                                                            -WP-9817-2026+.DOC

25.   In the said emergency SGBM held on 28 th January 2024, the

following resolution was purportedly passed.

      “The General Body hereby authorises vide this resolution
      following 3 members 1) Mr. Irineus Carneiro, 2) Mr. Shailendra
      Sawant 3) Aron Pinto take the redevelopment process ahead.
      Further authorises these 3 members to convene a SPGM as may
      be required and take approval from the general body wide a
      resolution on any specific agenda as may be required to take
      decisions pertaining to redevelopment or as may be required
      without approaching “Authorised Officer” if appointed by the
      Deputy Registrar/Div Jt Registrar of the Co-operative Societies”.


26.    The notice dated 19th February 2024, the legality and validity of

which was assailed, inter alia, contained the following agenda for

discussion.

      “ Authorise the Managing Committee to be in complete

      custodianship of the “Bidding Evaluation process”, to monitor,

      and facilitate the entire “Evaluation process” end to end

      intervening as deemed fit in the best interest of the

      community and submit a comprehensive “Evaluation Report”

      to general body for selecting top 3 bidders.”



27.    The substance of the challenge in the dispute was that the

meeting dated 28th January 2024 was convened in breach of the interim

order passed by the Divisional Joint Registrar in Revision Application

No. 28 of 2024 and the Resolution on agenda Item 5 passed therein was

ARS                                    23/37
                                                        -WP-9817-2026+.DOC

illegal and void. The second limb of the challenge was that the authority

of the General Body was being usurped by appointing a three member

committee or by entrusting the functions of the General Body in regard

to the redevelopment to the managing committee, in breach of the

provisions contained in MCS Act, 1960, especially the directives issued

under Section 79A of the Act.

28.   It would be contextually relevant to note that, by an interim order

dated 10th April 2024, the learned Judge, Co-operative Court granted

interim reliefs staying the effect and implementation of the Resolution

dated 28th January 2024 and also from taking any steps and/or holding

SGBM pursuant to the notice and agenda dated 19 th February 2024. The

leaned Judge, Co-operative Court found that prima facie, the notice was

in violation of the provisions of the MCS Act, 1960 and the interim

order passed by Divisional Joint Registrar.

29.   In the backdrop of the aforesaid facts, the legality and correctness

of the impugned orders is required to be appreciated.

30.   The legal position as to the interplay between the jurisdiction of

the Civil Court and the Co-operative Court under the Act, 1960 is well

settled. The jurisdiction of the Civil Court is plenary and omnipresent.

Conversely, the jurisdiction of the Co-operative Court is circumscribed

by the provisions contained in the Act, 1960; in the context of the

controversy at hand, Section 91 under the caption “disputes”. To attract


ARS                                  24/37
                                                        -WP-9817-2026+.DOC

the provisions contained in Section 91, the twin test of the “type” of the

dispute and the “identity” of the parties must be satisfied. In other

words, the dispute must be of the “type” described in Sub-section (1) of

Section 91, and such dispute must have arisen between the parties who

belong to any of the categories specified in Clauses (a) to (e) of Sub-

section (1) of that section.

31.   In the case of Margret Almeida And Ors (Supra), the Supreme

Court, after an analysis of the provisions contained in Section 91,

Section 163 and related provisions of the Act, 1960, enunciated in clear

and explicit terms that, the disputes which are mandatorily required to

be referred to the Co-operative Court should be of the category which

are referred to in Section 91(1), and such disputes must have arisen

between the parties to dispute who should belong to one or the other

categories specified under clauses (a) to (e) of sub-section (1) of

Section 91, referred to therein as, “enumerated persons”. The Supreme

Court exposited that, both the subject matter as well as the parties to

the dispute must be those specified under that section. In other words,

the Supreme Court clarified, if either of the aforementioned

requirement is not satisfied then the dispute cannot be adjudicated by

the Co-operative Court. If one of the parties to the dispute is not an

enumerated person, the question, whether the subject-matter of the

dispute is one which falls exclusively within the jurisdiction of the Co-


ARS                                  25/37
                                                         -WP-9817-2026+.DOC

operative Court need not be examined. Similarly, if it is found, in a

given case that, the subject-matter of the dispute is not covered by

Section 91, an inquiry into the question whether the parties to the

dispute fall under any of the categories enumerated under Section 91

would become irrelevant.

32.    The thrust of the submission on behalf of the Petitioners was that

redevelopment does not constitute or touch upon, “the business of the

co-operative society”. Indeed, this question has been examined in a

number of decisions of this court. In the case of Mohinder Kaur Kochar

(Supra) on which reliance was placed on behalf of the Petitioners, a

Division Bench of this Court clarified that dispute regarding

development of property of a housing society may touch the business of

the society broadly in two ways. Firstly in the kind of cases

contemplated under the judgment in the case of C. F. Marconi Vs

Madhav Co-operative Housing Society Ltd,7 where the object of the

society was to engage in the business of real estate, purchase properties

and redevelop the purchased properties. Second type of cases where a

housing society undertakes activity of initial construction of the building

where the members would reside. Where a co-operative society initially

constructs the building for its members, it is not a redevelopment, but

the initial development of the property. The initial construction of a

building and its redevelopment are different activities. The decision of

7     1985 (2) Bom CR 357.
ARS                                  26/37
                                                              -WP-9817-2026+.DOC

the society to repair or redevelop the property is totally different from

initial development of the building. The dispute arising from such

redevelopment, which becomes necessary by passage of time, is not

“business” of the society. Such activity cannot be considered as ‘touching

the business’ of the society.

33.   In the case of Maya Developers Vs Rajkumar L Nagda8 it was

reiterated that redevelopment of its building does not constitute

business of the society within the meaning of Section 91 of the MCS

Act, 1990.

34.    At this stage, it is imperative to note that, as a large number of

disputes arose in the matter of management of housing societies, the

legislature intervened. Chapter XIII-B containing provisions in relation

to “Co-operative Housing Societies”, came to be inserted by the

Amending Act, 2019. Inter alia the definition of ‘housing society’ was

amended.

35.   Section 154 B, 1(17) defines the “housing society” with reference

to its object as under:

      “(17) “housing society” means a society, the object of which is
      to provide its Members with open plots for housing, dwelling
      houses or flats; or if open plots, the dwelling houses or flats are
      already acquired, to provide its Members common amenities
      and services and to demolish existing buildings and reconstruct




8     (2016) 6 Bom CR 629.
ARS                                     27/37
                                                           -WP-9817-2026+.DOC

      or to construct additional tenements or premises by using
      potential of the land.”


36.     With the aforesaid legislative change the reconstruction or

redevelopment of a housing society, may now assume the character of a

matter which touches the business of the society.

37.   In the case of Parimal H Solanki In the matter of Bhoumik Co-

operative Housing Society Limited and Anr (Supra), a learned Single

Judge of this Court considered the effect of the aforesaid legislative

change and held that in view of the provisions contained in Section 154

B-31 incorporating the saving clause as to the existing Rules, Bye-Laws

etc, to bring the redevelopment within the fold of the object of the

society, the Bye-laws of the Society would necessarily have to be

amended to bring them in line with the definition of “housing society”

under Section 154-B1(17) of the MCS Act, 1960. The learned Single

Judge observed:

      “54.   The Amending Act of 2019 only brought above a change
      in the definition of “Housing Society” which now included
      redevelopment as one of the objects of the Society. However,
      Section 154B-31 clearly provided that inter alias, the Bye-Laws
      applicable to the Housing Society existing on the date of the
      Amending Act, to continue to be applicable, until expressly
      repealed, modified or amended. It is an admitted position that
      the Bye-Laws of the Plaintiff No. 1 Society have not been
      expressly repealed, modified or amended subsequent to the
      Amending Act of 2019 and would thus continue to apply to the


ARS                                   28/37
                                                             -WP-9817-2026+.DOC

      Plaintiff No. 1 Society. This saving of existing Bye-Laws has been
      expressly brought in the Amending Act of 2019. The existing
      Bye-Laws of the Plaintiff No. 1 Society does not have
      “redevelopment” as one of the objects of the Society. Thus, I do
      not find merit in the contention on behalf of the Defendants that
      subsequent to the commencement of the Amending Act of 2019,
      the Bye-Laws are required to be read as if it includes
      redevelopment as one of the objects of the Plaintiff No. 1-
      Society. If this contention on behalf of the Defendants is upheld,
      the said saving provision in the Amending Act of 2019 would be
      rendered nugatory. In view of the said saving provision, the Bye-
      Laws of the Society would necessarily have to be amended to
      bring it in line with the definition of “ Housing Society” under
      Section 154B-1(17).”
                                                   (emphasis supplied)


38.   At this juncture, a reference to the decision in the case of The

Bank of India Staff Panchsheel Co-operative Housing Society Ltd

(Supra) becomes necessary. In the said case, the Petitioner-society had

filed an Application under Order VII Rule 11 of the Code for rejection of

the Dispute on the ground that the issue of redevelopment does not fall

within the jurisdiction of the Co-operative Court. That Application was

rejected by the Co-operative Court. It was canvassed before the learned

Single Judge that, the issues relating to redevelopment do not fall

within the jurisdiction of the Co-operative Court and on that basis

alone, the Dispute deserved to be rejected at the threshold.




ARS                                     29/37
                                                               -WP-9817-2026+.DOC

39.   After adverting to the distinction between the concepts of

jurisdiction and maintainability, the learned Single Judge observed as

under:

      “20.   Order VII Rule 11 permits rejection of a plaint only where
      the bar is clear from the plaint itself. When an issue requires
      examination of additional material or evaluation of facts, it
      travels beyond the limited scope of that provision. Whether
      redevelopment forms part of the object of a housing society, as
      contemplated under Section 154B(1)(17) of the Maharashtra Co-
      operative Societies Act, is not a pure question of law. It is a mixed
      question of law and fact. Its determination depends upon the
      specific objects of the society as recorded in its bye laws, the
      manner in which the society has acted upon those objects, and
      the nature of the resolutions passed by the general body. In the
      present case, the bye laws of the society are not part of the
      plaint. Without examining the bye laws, it is not possible to
      record a definitive finding as to whether redevelopment does or
      does not form part of the society’s objects. Such an exercise
      would necessarily require evidence and adjudication on merits.
      That exercise lies squarely within the domain of the Co operative
      Court during trial. Order VII Rule 11 permits rejection of a plaint
      only where the bar is clear from the plaint itself. When an issue
      requires examination of additional material or evaluation of
      facts, it travels beyond the limited scope of that provision. Since
      the question of redevelopment being part of the society’s object is
      a mixed question of law and fact, and since the necessary factual
      foundation is not before the Court at this stage, the dispute
      cannot be rejected under Order VII Rule 11.


      21.    The submission based on Section 154B and the saving
      clause also does not justify rejection of the dispute at the

ARS                                      30/37
                                                                 -WP-9817-2026+.DOC

      threshold. The effect of the 2019 amendment, the nature of the
      enabling provision, and the impact of the saving clause are all
      matters requiring interpretation in the context of evidence and
      statutory scheme. They do not create an express bar to institution
      of a dispute by a member challenging resolutions of the general
      body. At the highest, they raise issues for adjudication on merits.


      22.     The   argument     that   the   society     has   executed    a
      Memorandum of Agreed Terms and is bound contractually is
      equally irrelevant at this stage. Whether the MOAT is valid.
      Whether it binds dissenting members. Whether it was executed
      pursuant to valid resolutions. All these are mixed questions of
      fact and law. They cannot be decided while testing the
      maintainability of the dispute under Order VII Rule 11.


      23.     It is also important to note that rejection of a dispute is a
      drastic power. It non suits a party without trial. Such power must
      therefore be exercised with circumspection. Unless the bar under
      law is clear, unambiguous, and apparent from the dispute
      application itself, rejection is impermissible.”
                                                         (emphasis supplied)



40.   In the case of Baliram Totaram Misal (Supra) which constituted

the sheet-anchor of the submissions on behalf of the Petitioner, the

learned Single Judge of this Court, elaborately considered all the

previous judgments and the import thereof.

41.   The factual backdrop in which the decision in the case of Baliram

Totaram Misal (Supra) was rendered deserves to be kept in view. In the

said case, the society had commenced redevelopment process in the

ARS                                       31/37
                                                                -WP-9817-2026+.DOC

year 2016. In the SGBM of the society, a Project Management

Consultant and a Developer were selected. Thereafter, the Disputants

had approached the Co-operative Court challenging those Resolutions

passed in the SGBM. In that context, the learned Single Judge exposited

the rationale behind instituting a composite proceeding before the Civil

Court by highlighting the futility of             independent        proceedings

challenging Resolutions before the Co-operative Court and the

challenge to the Development Agreement before the Civil Court. The

observations in paragraphs 27 to 29 read as under:

      “27.   As observed above, the judgment of the Apex Court in
      Margret Almeida (Supra) gives a complete answer to the
      controversy at hand. As held by the Apex Court, even if it is
      theocratically accepted that it is possible for a member to
      challenge only the resolution before the Co-operative Court,
      such challenge becomes meaningless because if the development
      agreement is not challenged before the Co-operative Court, any
      declaration made by the Co-operative Court qua the resolution
      becomes meaningless. The Apex Court has held that the
      aggrieved person will have to ultimately challenge the
      conveyance (which in the present case is development
      agreement and power of attorney). Most importantly, the Apex
      Court has held that in para-47 that while maintaining a
      challenge to the development agreement before the Civil Court,
      the legality of the resolution can always be gone into.
      28.    Following the ratio of the judgment of the Apex Court in
      Margret Almeida, in my view, the correct remedy for the
      Petitioners is to challenge the development agreement and
      power of attorney before the Civil Court. They have exercised

ARS                                     32/37
                                                               -WP-9817-2026+.DOC

      the remedy of filing a Civil Suit. While determining challenge to
      the validity of development agreement and power of attorney,
      the Civil Court can also decide the issue of validity of the
      resolutions adopted by the Society. This is precisely what is held
      by this Court in Komal Arvind Vesavkar (Supra) after
      appreciating the law enunciated by the Apex Court in paragraph
      47 of the judgment in Margret Almeida (Supra).
      29.    It is also seen that challenging the general body
      resolutions adopted for execution of development agreement
      and power of attorney before Co-operative Court and
      challenging the validity of development agreement and power of
      attorney before the Civil Court would result in anomalous
      situation. To illustrate, if the Civil Suit (challenging the
      development agreement) is decided first and is dismissed and if
      the challenge to resolution raised in the Dispute before the Co-
      operative Court remains pending, since Civil Court has not
      determined the issue of validity of the general body resolutions
      adopted, the decree would not bind the Co-operative Court. If
      the Co-operative Court independently determines validity of
      resolution and holds that the resolutions adopted are bad in law,
      the same would lead to an incongruous situation where the
      resolution adopted for execution of the development agreement
      would be declared illegal whereas the Suit challenging the
      development agreement is dismissed. The objector (who is the
      disputant before the Co-operative Court and Plaintiff before the
      Civil Court) would achieve nothing by seeking theocratical
      declaration as to the illegality of the Resolution. This is a reason
      why it is important that both the challenges to the resolution
      and to the development agreement are adjudicated upon by the
      same Court.”
                                                    (emphasis supplied)



ARS                                      33/37
                                                           -WP-9817-2026+.DOC

42.   The aforesaid enunciation of law is thus required to be construed in the

backdrop of the contours of the controversy therein.

43.   On the aforesaid touchstone readverting to the facts of the case at

hand, it is imperative to note that the challenge in the Disputes before

the Co-operative Court was primarily in the realm of the legality and

validity of the actions of the society and its office bearers to convene the

meeting, the conduct of the business in those meeting and the

Resolutions passed therein, albeit in respect of redevelopment.

However, the matter cannot be looked at from the perspective of the

subject matter of the Resolutions only.

44.   A broad proposition cannot be laid down that if the impugned

Resolution pertains to redevelopment, the Co-operative Court is

completely denuded of the jurisdiction to decide the legality and

validity of the Resolution, even where the dispute squarely falls in the

categories specified in Section 91 of the MCS Act, 1960. The Court is

required to steer clear of two extremes. One, drawing an inference of

bar to the jurisdiction of the Co-operative Court no sooner the point of

controversy revolves around redevelopment, dehors the nature of the

challenge and the stage at which the Disputants approach the Co-

operative Court. Two, allowing the Disputants to agitate the dispute

before the Co-operative Court by cleverly confining the challenge to the

Resolution on technical grounds of breach of statutory provisions, Rules,


ARS                                    34/37
                                                         -WP-9817-2026+.DOC

Bye-laws of the Society, in the matter of convening, holding and passing

of Resolution in the meetings of the Society, where redevelopment is at

the heart of the controversy and the process of redevelopment has

gained momentum and third party rights have intervened.

45.   To arrive at a correct resolution, the question of jurisdiction

would be required to be determined in the backdrop of the facts of the

given case. No straitjacket formula of universal application can be laid

down. The mere fact that the Resolutions passed by the society pertain

to redevelopment, by itself, cannot be the sole determinative factor.

46.   If the facts of the case at hand are appraised, in the light of

aforesaid principles, evidently, the first test of the parties being of the

enumerated classes is unquestionably fulfilled. Since the challenge, as

noted above, is primarily to the legality and validity of the notice and

the Resolutions passed in the meetings of the society, on the grounds

like lack of competence to convene the meeting, conduct of the meeting

in breach of the governing Rules and Bye-laws, holding of the meetings

in teeth of the interim orders passed by the Divisional Joint Registrar

and passing of Resolution therein with a view to pre-empt and

overreach the orders that might be passed by the Authorities under the

MCS Act 1960, and not to the merits of the decision of the

redevelopment as such, in the considered view of this Court, the fact




ARS                                  35/37
                                                           -WP-9817-2026+.DOC

that those Resolutions pertain to redevelopment does not per se denude

the Co-operative Court of its jurisdictional competence.

47.   It is also imperative to note that it was not the case of the

Petitioners that the process of redevelopment had gained momentum, in

the sense that, the developer was appointed and the Development

Agreement has been executed and the reliefs that may be granted by

the Co-operative Court would not effectually and completely resolve the

disputes presented before the Co-operative Court. On the contrary, as

noted above, the Co-operative Court had passed an interim order

restraining the society and its office bearers from giving effect to and

implementing the impugned Resolutions. Therefore, there was no

possibility of the Disputes being rendered infructuous or conflicting

orders being passed by the Co-operative Court and the Civil Court.

48.   The upshot of the aforesaid consideration is that, the learned

Member, Appellate Court was justified in interfering with the orders

passed by the Co-operative Court and restoring the Disputes to the file

of the Co-operative Court.

49.   Resultantly, no interference is warranted in exercise of writ

jurisdiction. The Writ Petitions, therefore, deserve to be dismissed. It is,

however, clarified that, the Petitioners may workout their remedies in

accordance with law qua the interim order passed by the Co-operative




ARS                                   36/37
                                                        -WP-9817-2026+.DOC

Court, dated 10th April 2024, which also came to be restored by the

impugned order in Appeal No. 15 of 2025.

50.   Hence, the following order:

                                 :ORDER:

      (i)    The Writ Petitions stand dismissed.

      (ii)   Rule discharged.

      No costs.

                                             [N. J. JAMADAR, J.]




ARS                                  37/37


Continue reading with your account

Sign in to read the full judgment. It’s free.

Sign in to read

Checking your session…

Lawyer court records for this case

Associated through the court’s case reference.

For a signed copy suitable for filing, refer to the court's website.