Patna High Court

BiharversusRamyati Singh

Decided
Disposal
DISPOSED

Holding

The permanent 5% pension deduction was excessive and was modified to a ten‑year deduction, with the impugned orders set aside.

Summary

The State of Bihar appealed against a single judge’s order that upheld a permanent 5% pension deduction imposed on retired Executive Engineer Ramyati Singh for alleged procedural irregularities in a 1998‑99 road repair tender. Singh was charged with executing the agreement without proper administrative approval, failing to publish the tender in a newspaper, and not having the bill checked, but the departmental inquiry found the charges unestablished and exonerated him. The disciplinary authority nonetheless imposed a 5% pension deduction under Bihar Pension Rules. The High Court, relying on constitutional principles (Art.21, Art.14) and Supreme Court precedents, held that mere procedural lapses do not amount to misconduct warranting such a severe penalty and that the penalty was not "shocking to the conscience". Consequently, the court set aside the impugned orders and modified the deduction to a ten‑year period instead of a permanent one, thereby disposing of the appeal.

Issues considered

  • The legality of a permanent 5% pension deduction under Bihar Pension Rules, 1950.
  • Whether procedural lapses in tender publication constitute misconduct justifying disciplinary penalty.
  • Whether the imposed penalty is "shocking to the conscience" and thus liable to be set aside.
  • Whether the court may modify the period of pension deduction rather than restore full pension.
  • Whether the petitioner is entitled to restoration of full pension.

Legislation cited

Subjects

  • pension deduction
  • departmental misconduct
  • procedural lapse
  • disciplinary penalty
  • constitutional law
  • Article 21
  • Article 14
  • review of penalty
  • retirement benefits
  • Bihar PWD Code

Judgment

          IN THE HIGH COURT OF JUDICATURE AT PATNA
                         Letters Patent Appeal No.199 of 2025
                                          In
                    Civil Writ Jurisdiction Case No.11409 of 2013
     ======================================================
1.    The State of Bihar.
2.   The Principal Secretary, Road Construction Department, Bihar, Patna.
3.   The Additional Secretary, Road Construction Department, Bihar, Patna.
4.   The Special Secretary, Road Construction Department, Bihar, Patna.

                                                                   ... ... Appellant/s
                                        Versus
     Ramyati Singh S/o Shri Brahmdeo Singh, R/o Mohalla-Rajbanshinagar, Road
     No. 2 Extension, Police Station-Shastrinagar, District-Patna.

                                               ... ... Respondent/s
     ======================================================
     Appearance :
     For the Appellant/s    :         Mr. P. K. Shahi, AG
                                      Mr. Gyan Prakash Ojha, GA-7
                                      Mr. Abhishek Singh, AC to GA-7
     For the Respondent/s   :         Mr. Bindhyachal Singh, Sr. Adv.
                                      Mr. Suresh Kumar, Adv.
                                      Mr. Arbind Kumar, Adv.
                                      Mr. Akash Singh, Adv.
     ======================================================
     CORAM: HONOURABLE THE CHIEF JUSTICE
             and
             HONOURABLE MR. JUSTICE HARISH KUMAR
     ORAL JUDGMENT
     (Per: HONOURABLE THE CHIEF JUSTICE)

      Date : 17-02-2026

                    This Letters Patent Appeal has been filed by the State

      challenging the order dated 29-7-2024 of the learned Single

      Judge passed in C.W.J.C. No. 11409 of 2013. The writ-petitioner

      filed the writ petition with the following prayers:-

                                “(I) For issuance of an appropriate writ to
                      quash the order issued under the signature of the
                      Special        Secretary,       Road        Construction
                      Department,        Bihar,     Patna      whereby       and
Patna High Court L.P.A No.199 of 2025 dt.17-02-2026
                                            2/15




                          whereunder         he       has     rejected   the    review
                          application preferred by the petitioner vide memo
                          no.8069 dated 20.07.2012.
                                  (ii) For issuance of an appropriate
                          direction to quash notification bearing memo
                          no.14768(S) dated 21.10.2010 whereby and
                          whereunder the Additional Secretary, Road
                          Construction Department, Bihar, Patna while
                          concluding the departmental proceeding under
                          Rule 43(b) of Bihar Pension Rules deducted five
                          percent amount of pension permanently from the
                          petitioner and consequently order issued under
                          the signature of the Deputy Secretary whereby
                          and whereunder in the light of the aforesaid
                          departmental notification five percent amount of
                          pension be deducted from the date of starting
                          pension       from       the      petitioner   vide   memo
                          no.15821(s) dated 24.11.2010.
                                  (iii) For issuance of an appropriate
                          direction to restore full pension to the petitioner.
                                  (iv) For passing such other order or orders
                          for which the petitioner is entitled under the law
                          and in the facts and circumstances of the case.”

                      2. It is the case of the writ-petitioner that he was

         superannuated from the post of Executive Engineer, Road

         Construction Department, Road Division, on 31.12.2007. While

         he was posted as the Executive Engineer, R.E.O., Works

         Division, Patna, a tender was invited for repair works of

         Lodipur–Sadispur road in 2nd Kms. from 700 ft. to 1400 ft. for
Patna High Court L.P.A No.199 of 2025 dt.17-02-2026
                                            3/15




         the period 1998-1999. For execution of the repair work an agreement

         was executed with the contractor and the estimated amount of the

         work as per the agreement was fixed to the tune of Rs.1,05,363/-. The

         date of completion of work was prescribed as 31.03.1999.

         Subsequently, the Special Officer-cum-Deputy Secretary, Road

         Construction Department, Bihar, Patna, issued resolution that a

         departmental proceeding against the petitioner will be initiated under

         Rule 17 of the Bihar Government Servants (Classification, Control

         and Appeal) Rules, 2005 (hereinafter referred to as “the 2005 Rules”)

         for alleged irregularities committed during his posting under the

         R.E.O. Works Division, Patna, vide Memo dated 12.04.2007. The

         memo of charge was served upon the petitioner and there were three

         charges formulated, which read as follows:-

                          “(i) the agreement for the aforesaid repair work
                          was         executed           without          administrative
                          approval/allotment of fund from the c ompetent
                          authority      rather       approval     from     Works    the
                          Superintending Engineer, Circle, Patna was
                          obtained and agreement was executed for the said
                          work on 19.03.1999 of Rs.1,05,363/-
                          (ii) tender notice was not published in the.
                          Newspaper, and
                          (iii) the work was measured by the Junior
                          Engineer on 31.03.1999 and the bill was prepared
                          for Rs. 74,393/- which was not checked by the
                          answering respondent (Annexure-2 to the writ
Patna High Court L.P.A No.199 of 2025 dt.17-02-2026
                                            4/15




                          petition).”

                      3. It is the further case of the petitioner that for the

         self-same irregularities, a departmental proceeding was also

         initiated against the Superintending Engineer and Assistant

         Engineer of R.E.O. Works Division, Patna, along with the

         petitioner and they have been exonerated of the charges levelled

         against them. The petitioner also submitted his reply before the

         Enquiry Officer and it was contended that there was no need for

         any administrative approval for small and petty repair works and

         Rs. 5 lakhs fund was allotted for the work vide departmental

         letter dated 06.08.1998. So far as the second charge is

         concerned, it is stated that after making signature of the

         Executive Engineer on the letter relating to the Notice Inviting

         Tender, the same was sent to Division’s Correspondence Section

         and duly mentioned it on the issue Register. Further the tender in

         question has been placed before the petitioner for his

         recommendation after the same was forwarded by the

         Estimating and Accounts Officer; thereafter, the same was

         forwarded to the Superintending Engineer for final disposal.

                      4. So far as the wide circulation of the tender is

         concerned, it was stated that the work of Rs. 5 lakh was

         distributed among the three contractors in healthy competition.

         As far as the 3rd charge is concerned, the bill of Rs. 74,393/- was
Patna High Court L.P.A No.199 of 2025 dt.17-02-2026
                                            5/15




         prepared and it was entered into the Measurement Book, which

         was never placed before the petitioner’s entire tenure upto

         31.05.2000 for ‘Check and Pass’ order.

                      5.    The      Departmental     Inquiring   Officer,   after

         considering the reply of the petitioner, held that all the three

         charges were not established and recommended for exonerating

         him from the charges. However, the Disciplinary Authority

         issued second show cause notice while differing from the

         reasons of the Inquiring Officer in respect of charge no.2 only,

         regarding non-performance of the wide circulation of the tender

         through newspaper, and the petitioner was asked to submit his

         reply within fifteen days on the said charge.

                      6. In pursuance thereof, the petitioner submitted his

         reply within time and stated that the tender notice was kept by

         the Estimating Section of the Division where the Employee/

         Estimator/Estimating Officer were posted, and if the tender was

         not published in the newspaper before one week from the date

         fixed for the tender then the tender would be postponed. In the

         instant case, neither the date of tender has been extended nor the

         tender has been postponed.

                      7. Further stand has been taken that the final decision

         was taken by the Superintending Engineer after verification of

         the press publication in the newspaper and that press publication
Patna High Court L.P.A No.199 of 2025 dt.17-02-2026
                                            6/15




         is not available in the office of the R.E.O. Works Division,

         Patna. It is further contended that the contractor filed a writ

         petition for payment of the outstanding dues and accordingly

         this Court directed for the payment of dues in favour of the

         contractor. Aggrieved, the State preferred LPA No. 638 of 2007,

         which came to be disposed of directing the payment to be made

         to the contractor and accordingly the payment was made.

                      8. The case of the petitioner is that the decision of the

         respondent no.3 regarding deduction of 5% amount of pension

         permanently         from     the     petitioner   while   concluding   the

         departmental proceeding under Rule 43(b) of Bihar Pension

         Rules was not justified. The petitioner, aggrieved by the order of

         the Additional Secretary, Road Construction Department, Bihar,

         Patna, preferred a review before the Hon’ble Minister, Road

         Construction Department, Bihar, but the same was rejected vide

         order dated 02.07.2017 by the Special Secretary, Road

         Construction Department, Bihar, Patna. The impugned order

         deducting 5% pension is said to be not sustainable in the eyes of

         law and contrary to the provision of Bihar Pension Rules, 1950

         as no pecuniary loss was caused to the State Government.

                      9.    The      Deputy        Secretary,   Road   Construction

         Department, Government of Bihar, filed the counter affidavit,

         wherein it was stated that there was every justification for
Patna High Court L.P.A No.199 of 2025 dt.17-02-2026
                                            7/15




         passing such order.

                      10. The petitioner filed his reply to the counter

         affidavit filed by the respondent no.4.

                      11. The learned Single Judge, after hearing the parties,

         held as follows:

                                  “6. Having heard the rival submissions
                          made on behalf of the parties, as well as, the fact
                          that the allegation which has been levelled against
                          the petitioner is in respect of procedural difficulty
                          in making payment to the contractor after
                          completion of the work. The Division Bench in
                          L.P.A. No. 638 of 2007 after recording that the
                          work was completed which is supported by bill
                          raised by the contractor, had not found any fault in
                          the order passed by learned Single Judge, who had
                          directed the respondents to make payment of a
                          sum of Rs.74,393/- out of the total work for
                          Rs.1,05,363/-. The authorities having admitted
                          that the work has been completed as per the
                          contract entered into by the petitioner on behalf of
                          the State Government, who was posted at the
                          relevant time as the Executive Engineer cannot be
                          faulted for having acted against the law. A
                          reference of PWD code would make it more clear
                          that in respect of any work completion, the same
                          is entered into the measurement book and
                          payments have to be made on the said basis. Mere
                          procedural lapses on part of the petitioner cannot
                          constitute misconduct. The authorities have not
Patna High Court L.P.A No.199 of 2025 dt.17-02-2026
                                            8/15




                          taken any action in respect of the two other
                          delinquent employees who have been exonerated
                          about which the petitioner has made a specific
                          statement in paragraph no.9 of the writ petition,
                          which has not been denied by the respondents. I
                          don't find any reason that any loss was caused to
                          the State.
                                  7. The law in respect of interference by this
                          Court is well settled by the Apex Court in the case
                          of B. C. Chaturvedi Vs. Union of India & Ors.
                          reported in (1995) 6 SCC 746 stating therein that
                          in the case of penalty order, Article 21 of the
                          Constitution of India is attracted and in view of
                          the interdependence of the fundamental right, the
                          punishment/penalty awarded to be reasonable and
                          if it be unreasonable, Article 14 of the
                          Constitution would be violated, however, for the
                          self-imposed limitation while exercising power
                          under Section 226 of the Constitution of India, I
                          find    it   proper         to   direct   the   Disciplinary
                          Authority/Appellate Authority to re- consider the
                          penalty imposed and pass appropriate punishment
                          order with cogent reason.
                                  8. I am of the opinion in light of the
                          aforesaid reason, the impugned order dated
                          21.10.2010, passed by the Additional Secretary,
                          Road Construction Department, Patna; order dated
                          24.11.2010 passed by the Deputy Secretary, Road
                          Construction Department, Bihar and revisional
                          order dated 20.07.2012 passed by Special
                          Secretary, Road Construction Department, Bihar,
Patna High Court L.P.A No.199 of 2025 dt.17-02-2026
                                            9/15




                          Patna, as contained in Annexures 8, 9 and 11
                          respectively are hereby set aside and quashed for
                          the aforesaid reason.”

                        12. The learned Advocate General, challenging the

         impugned order passed by the learned Single Judge, contended

         that the writ-petitioner has deliberately violated the prescribed

         procedure for publication of tender and allotment of work in the

         newspaper and thereby a grave misconduct was caused by the

         writ-petitioner. It was further argued that the quantification of

         loss caused to the State is not a criteria for constituting a

         misconduct which has not been appreciated by the learned

         Single Judge. The observation of the learned Single Judge that it

         was a mere procedural lapse on the part of the petitioner and it

         cannot constitute misconduct, is not at all justified.

                       It is further argued that the two delinquents who were

         the Superintending Engineer and Assistant Engineer have been

         let off without punishment in the disciplinary proceeding,

         cannot be a ground to take a liberal view on the petitioner, who

         was the Executive Engineer and has got a vital role in the

         publication of tender and therefore the impugned order is liable

         to be set aside.

                      13. The learned counsel for the respondent, on the

         other hand, submitted that there is no dispute that the work in

         question has already been done and the payment has been made
Patna High Court L.P.A No.199 of 2025 dt.17-02-2026
                                            10/15




         as per the direction of this Court and the petitioner has retired

         since long and he is now aged about 80 years. Further the State

         has not come up with any case that there is any other kind of

         misconduct on the part of the respondent during his entire

         service career, and therefore a liberal view should be taken in

         the matter.

                      14. Rule 158 of Bihar P.W.D. Code, which deals with

         tenders, states that tender must be obtained for all works which

         are proposed to be given on contract unless the amount is Rs.

         20,000 or less. So far as the manner of floating of tender is

         concerned, it is elaborately dealt in Rule 159, which is quoted

         hereinbelow:-

                          “[159. Tenders, which should-always be sealed,
                          shall invariably be invited in the most open and
                          public manner possible by advertisement on the
                          Internet     through        official    web-sites   in    the
                          newspapers having wide circulation in the area
                          and by notice in English or in Hindi posted in
                          public places. For any work of more than Rs.
                          1,00,000/-      publication       of    tender   notice    in
                          newspapers and/or internet is mandatory. To save
                          costs in advertisement there could be a short
                          notice      having          important     information      in
                          newspapers which should have information about
                          as to where detailed Information can be obtained,
                          which could be in the office and/or available on
                          the official web-sites on the internet. The
Patna High Court L.P.A No.199 of 2025 dt.17-02-2026
                                              11/15




                          intending participants should in all cases have
                          prior knowledge about:-
                                  (i) detailed criteria for shortlisting the
                          participants.
                                  (ii) The form in which the tender should be
                          presented
                                  (iii) When and where the sanctioned
                          estimate,      specifications,   drawings   or   plans,
                          conditions and clauses of contract and other
                          contract documents can be seen, and the blank
                          form of tender obtained.
                                  Whether any material will be supplied
                          departmentally and if so the rate at which and the
                          place where if should be supplied,
                                  (iv) The place where, the date on which and
                          the time when tenders are to be submitted and are
                          to be opened. Normally it should not be less than
                          10 days in case of emergency, the time period can
                          be reduced as per requirement with the prior
                          approval       of     the   concerned   Superintending
                          Engineer.
                                  (v) The amount of earnest money to
                          accompany the tender and the amount and nature
                          of the security deposit required in the case of
                          accepted tender.
                                  The tender notice should also stipulate that
                          contractors submitting tenders should furnish
                          Income-tax, and Sales-tax clearance certificates
                          along with it.
                                  (vi) The designation of the authority that
                          will accept the tender. Authority should always be
Patna High Court L.P.A No.199 of 2025 dt.17-02-2026
                                            12/15




                          reserved to reject any or all of the tenders so
                          received without the assignment of a reason and
                          this should be expressly stated in the notice.
                                  (vii) The time of completion of the work
                          according to the nature and urgency of the work.
                          In exceptional cases only, time extension can be
                          allowed by the Public Works Department itself
                          only.
                                  All this information can be given in the
                          short notice and/or detailed information to be
                          supplied from the office and/or through official
                          websites on the internet.”

                       15. Even though the writ-petitioner has taken a stand

         that the tender was floated, but no documentary proof has been

         brought on record or substantiated to that effect. Therefore, it is

         a case of no tender; although, the amount of the work justifies

         the floating of the tender as per the said two provisions i.e. Rule

         158 and Rule 159 of Bihar P.W.D. Code.

                      16. The learned Advocate General has placed reliance

         in the case of Lucknow Kshetriya Gramin Bank (Now

         Allahabad, Uttar Pradesh Gramin Bank) and Another v.

         Rajendra Singh, reported in (2013) 12 SCC 372, wherein the

         Hon’ble Supreme Court has been pleased to hold as follows:-

                                  “19. The principles discussed above can be
                          summed up and summarised as follows:
                                  19.1. When charge(s) of misconduct is
Patna High Court L.P.A No.199 of 2025 dt.17-02-2026
                                            13/15




                          proved in an enquiry the quantum of punishment
                          to be imposed in a particular case is essentially the
                          domain of the departmental authorities.
                                  19.2. The courts cannot assume the function
                          of disciplinary/departmental authorities and to
                          decide the quantum of punishment and nature of
                          penalty to be awarded, as this function is
                          exclusively       within          the   jurisdiction   of   the
                          competent authority.
                                  19.3. Limited judicial review is available to
                          interfere with the punishment imposed by the
                          disciplinary authority, only in cases where such
                          penalty is found to be shocking to the conscience
                          of the court.
                                  19.4. Even in such a case when the
                          punishment         is       set     aside    as    shockingly
                          disproportionate to the nature of charges framed
                          against the delinquent employee, the appropriate
                          course of action is to remit the matter back to the
                          disciplinary authority or the appellate authority
                          with direction to pass appropriate order of penalty.
                          The court by itself cannot mandate as to what
                          should be the penalty in such a case.
                                  19.5. The only exception to the principle
                          stated in para 19.4 above, would be in those cases
                          where the co-delinquent is awarded lesser
                          punishment by the disciplinary authority even
                          when the charges of misconduct were identical or
                          the co-delinquent was foisted with more serious
                          charges. This would be on the doctrine of equality
                          when it is found that the employee concerned and
Patna High Court L.P.A No.199 of 2025 dt.17-02-2026
                                            14/15




                          the co-delinquent are equally placed. However,
                          there has to be a complete parity between the two,
                          not only in respect of nature of charge but
                          subsequent conduct as well after the service of
                          charge-sheet in the two cases. If the co-delinquent
                          accepts the charges, indicating remorse with
                          unqualified apology, lesser punishment to him
                          would be justifiable.

                        17. It is the contention of the learned Advocate

         General that there is no finding of the learned learned Single

         Judge that the punishment which was imposed on the writ

         petitioner was shockingly disproportionate to the nature of the

         charges framed against him; therefore, the Court should not have

         remitted the matter back to the authority to pass appropriate

         order on the quantum of punishment.

                      18. Upon perusal of the impugned order, we find that

         the work in question pertains to the year 1998. There is no

         dispute that the said work was duly executed and recorded in the

         Measurement Book, and payment was released in terms of the

         order passed by this Court. It is true that, considering the

         quantum involved, a tender ought to have been floated in

         accordance with the specific statutory provision, which was

         admittedly not complied with in the present case. However,

         taking into account the fact that the writ-petitioner has already

         retired from service; there are no other allegations against him in
             Patna High Court L.P.A No.199 of 2025 dt.17-02-2026
                                                         15/15




                      his service career and he has been exonerated of other two

                      charges and now he is aged about 80 years and he has retired

                      from service for nearly 19 years, we are of the considered view

                      that, in the interest of justice, the direction for permanent

                      deduction of 5% from his pension requires modification.

                      Accordingly, the deduction of 5% from the pension shall be

                      restricted to a period of ten (10) years from the date of

                      retirement, instead of being imposed permanently.

                                   19. Subject to the aforesaid modification, the instant

                      LPA stands disposed off.




                                            (Sangam Kumar Sahoo, CJ)


                                                   ( Harish Kumar, J)
rohit/-
AFR/NAFR                NAFR
CAV DATE                NA
Uploading Date          19-02-2026
Transmission Date
