SANGAPPA MARUTIAPPA WANJULE AND OTHERSversusTHE STATE OF MAHARASHTRA AND OTHERS

Disposal
DISPOSED OFF

Holding

Section 80 of the 2013 Act applies and the Municipal Corporation is liable to pay interest on the delayed compensation, to be discharged by the Collector.

Summary

The petitioners, original owners of 17 acres of land in Dhule, claimed that compensation for acquisition was delayed and sought interest under Section 80 of the RFCTLARR Act, 2013. A notification under the Land Acquisition Act, 1894 was issued in 2013, corrected later, and the award was passed on 29‑01‑2015, after the 2013 Act came into force. Compensation was paid in two installments (30‑03‑2016 and 17‑08‑2017), creating a gap of over a year. The Court examined whether the interest provisions of the 2013 Act apply despite the acquisition proceeding under the old Act and who bears liability for the interest. Relying on precedents, the Court held that Section 80 of the 2013 Act is applicable and the Municipal Corporation, as the acquiring body, is liable to pay interest on the entire amount, to be disbursed by the Collector. The interest is to be paid within six months of the order, and the writ petition is disposed.

Issues considered

  • Whether Section 80 of the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 applies to a compensation award passed under the Land Acquisition Act, 1894 after the 2013 Act came into force.
  • Whether the interest on delayed compensation should be calculated at 9% and 15% per annum as per the 2013 Act.
  • Who is liable to pay the interest – the State Government, the Municipal Corporation, or the Collector.

Legislation cited

Subjects

  • land acquisition
  • compensation
  • interest
  • RFCTLARR Act 2013
  • Section 80
  • old land acquisition act
  • municipal corporation liability
  • writ petition
  • Maharashtra

Judgment

                                     (1)                   WP-10041-2018


          IN THE HIGH COURT OF JUDICATURE AT BOMBAY
                     BENCH AT AURANGABAD

                   WRIT PETITION NO. 10041 OF 2018

1. Sangappa s/o Marutiappa Wanjule
   (Died) Through LRs.
  1-A. Smt. Savitrabai Sangappa Wanjule
  Age: 77 years, Occu: Household,
  R/o. House No.2/18-49 Utargalli Kadrabad,
  Jalna, Dist. Jalna.
  2-B. Sau Shobha Babuirao Karegaonkar
  Age: 51 years, Occu: Household,
  r/o. chitali-Putali, Tq. Jalna, Dist. Jalna.
  2-C. Sau. Surekha Subhash Tamshete
  Age: 45 years, Occu: Household,
  R/o. Plot No.24, Sanjivani Anger, Pathri
  Road, Parbhani, Dist. Parbhani- 431401.
2. Guruling Vishwanathappa Wanjule
   (Died) Through LRs.
  2-A. Smt. Pushppabai Guruling Wanjule
  Age: 75 years, Occu: household,
  R/o. Plot No.53, Priyanka Residency Colony,
  Mantha Chaufuli, Mantha Road, Jalna, Dist. Jalna.
  2-B. Sau Asmita Nishikant Gujre
  Age: 45 years, Occu: Household,
  R/o. Flat No.1, Yashodeep, Kadam Plaza,
  Opp. Bharti Hospital, Katraj, Pune 411046.
3. Madhukar S/o. Bhauappa Wanjule (Lingayat),
   Age: 76 years, Occu: Agriculturist, & Advocate,
   R/o. Parshi galli, Near Central Bank Kadrabad,
   Jalna Dist. Jalna-431 203.                        ...PETITIONERS
                                     (2)                          WP-10041-2018


      VERSUS

1. The State of Maharashtra
Through Principal Secretary,
Urban Development Department,
Mantralaya Mumba-431 032.
2. The Collector, Dhule
Dist. Dhule.
3. Deputy Collector,
Land Improvements (General),
Dhule, Dist. Dhule.
4. The Municipal Corporation,
Dhule, Dist. Dhule,
Through its Commissioner.                              ...RESPONDENTS
                                     …..
Mr. S. R. Kendre, h/f Mr. P. R. Patil, Advocate for Petitioner.
Mr. A. R. Kale, AGP for Respondent No. 1 to 3 /State.
Mr. S. P. Shah, the learned Advocate for Respondent No. 4.

                     CORAM                  : KISHORE C. SANT &
                                              AJIT B. KADETHANKAR, JJ.

                     RESERVED ON            : 14th JULY 2026.
                     PRONOUNCED ON : 16th SEPTEMBER 2026.

ORDER :- [PER:- KISHORE C. SANT, J.]


1.       Heard Mr. Kendre h/f Mr. Patil, the learned Advocate for the

petitioner; Mr. Kale, the learned AGP for Respondent Nos. 1 to 3 and;

Mr. Shah, the learned Advocate for Respondent No.4. The petition is
                                      (3)                       WP-10041-2018


taken up for final disposal at the stage of admission by consent of the

parties.


2.         The petitioners, original owners of the land bearing Survey

No.578 Admeasuring 17 Acres 28R situated at Dhule, have approached

this Court with a limited grievance regarding grant of interest on

amount of compensation in view of Section 80 of the Right to Fair

Compensation and Transparency in Land Acquisition, Rehabilitation and

Resettlement Act, 2013 (hereinafter referred to as “New Act, 2013”).

3.         It is the case of the petitioners that a notification under Section

6 of the Land Acquisition Act was issued on 24/10/2013, the same was

corrected on 26/12/2013. Award was finally passed on 29/01/2015. It

is the case that though the amount was calculated and award was

passed, the payment of compensation was not made in time and when it

was paid in two installments, there is still some unpaid amount. An

interest is therefore claimed.


4.         The facts in short are that, the land of petitioners bearing

Survey No.578 admeasuring 17 Acres 28R situated at Dhule, was taken
                                   (4)                     WP-10041-2018


in possession for construction of development plan road without

acquiring the land or giving any compensation. The entries in the

revenue records were also taken in the name of Acquiring Body on

15/03/2001. The petitioner was therefore required to approach this

Court by filing Writ Petition No. 7724 of 2011. This Court vide judgment

and order dated 23/08/2012 directed the Respondents/authorities to

pass an award within six months.


5.      The first installment of amount of compensation was received

by the petitioners. The petitioner received first formal notice on

01/03/2016 regarding the payment of compensation amount from

Respondent No.3. The first installment of Rs.70,87,500/- was paid on

30/03/2016. The remaining amount i.e. Rs.1,28,05740/- was received

by the petitioner on 17/08/2017. The total amount of Rs.1,98,93,240/-

is paid in two installments. Gap between two installments is more than

one year and four months.


6.      Mr. Kendre, the learned Advocate for the petitioner, vehemently

argued that though the possession of the land was taken in the year
                                     (5)                     WP-10041-2018


2001 and entries were also made in the name of Acquiring

Body/authorities in the same year, still no acquisition proceedings were

undertaken. It is only after the petitioners approached this Court and

after this Court passed an order, the proceeding under the Land

Acquisition Act, 1894 (hereinafter referred to as “Old Act, 1894”) were

initiated.


7.       He submits that Section 80 of the New Act, 2013 clearly

stipulates that when such compensation is not paid or deposited on or

before taking possession of the land, the Collector has to pay the amount

of award with interest @ 9% per annum from the date of taking

possession till it is actually paid or deposited. If the amount is not paid

or deposited within a period of one year from the date of possession,

then the rate of interest increases to 15% per annum. He thus submits

that in the present case, 9% interest needs to be calculated for a period

from 29/01/2015 till 28/01/2016. Thereafter, the rate of interest needs

to be calculated at the rate of 15% from 29/01/2016 till 30/03/2016 so

far as entire amount is concerned.
                                         (6)                          WP-10041-2018


8.         Since the first installment was paid on 30/03/2016, from

29/01/2016 till the date of payment of second installment i.e.

17/08/2017, the rate of interest needs to be calculated at the rate of

15% on the unpaid amount. He thus submits that the total amount

comes to Rs.30,28,063/- which the Government needs to pay towards

interest on the amount of compensation.


9.         During the course of arguments, Mr. Kendre, learned Advocate

for the petitioner, relied upon the judgment passed by this Court in the

case of Ganesh Narsing Lolge Vs. The State of Maharashtra and Ors. 1 in

Writ Petition No.8549/2025.



10.        Mr.    Shah,     the     learned    Advocate   for   the    Respondent

No.4/Corporation, vehemently opposes the petition. He submits that the

proceeding in the present case was undertaken under the provisions of

the Old Act, 1894, as notification under Section 6 was published on

24/10/2013 and under the said Act, the interest would be under the old

Act. He submits that Section 80 of the New Act, 2013 does not come into

1 WP/8549/2025 (Aurangabad Bench)
                                      (7)                    WP-10041-2018


play in the present case. In any case, if the Corporation had already

made the payment to the Collector, therefore in case, the interest is to be

paid it needs to be paid by the Collector, as the amount was already

deposited by Respondent No.4 with the Collector. He submits that there

is no fault on the part of Corporation and therefore the Corporation

should not suffer the burden of interest. He draws attention of this Court

to Section 34 of the Old Act, 1894. He further submits that in the

present case, the Corporation had deposited 50% amount with the

Collector before the Award was passed. He also relies on proviso to

Section 24 of the New Act, 2013.



11.        During the course of arguments, learned Advocate Mr. Shah,

relied upon the judgment in the case of Executive Engineer, Gosikhurd

Project      Ambadi       Bhandara,   Maharashtra   Vidarbha     Irrigation

Development Corporation Vs. Mahesh And Ors .2 and judgment in the

case of Reliance Natural Resources Ltd. Mumbai and Anr. Vs. The State

of Maharashtra and Ors.3.


2 (2022) 2 SCC 772
3 [2019(6) Mh.L.J. 244]
                                   (8)                      WP-10041-2018


12.        Mr. Kale, the learned Additional Government Pleader, submits

that the land is acquired for the Corporation. The Collector only

facilitated the acquisition proceedings. When the land is acquired for the

Corporation, the liability to pay the compensation as well as interest

naturally rests with the Corporation. Thus, the Government is not liable

to pay the interest. Learned AGP further submits that, in the present

case, the acquisition proceedings had taken place for construction of

development plan road under the provisions of Maharashtra Regional

and Town Planning Act, 1966 (hereinafter referred to as “MRTP Act”.

Section 24(2) of the New Act, 2013 would not have any application and

consequently, there is also no question of applying the provisions of New

Act, 2013. He also submits that the amount was not deposited in time.

Only 50% of the amount was deposited initially. Remaining amount was

deposited after to a long gap.



13.        During the Course of argument, Mr. Kale relied upon judgment

in the case of and in the case of Mehtab Laiq Ahmed Shaikh and Anr. Vs.

State of Maharashtra and Ors.4and judgment in the case of Sham Lal
4 [2017(6) Mh.L.J. 408]
                                    (9)                      WP-10041-2018


Narula Dr. Vs. Commissioner of Income Tax, Punjab, Jammu and

Kashmir, Himachal Pradesh and Patiala5.


14.       For the purpose of deciding the present writ petition, this Court

has to discuss the judgments relied upon by the parties.

15.       In the Case of Ganesh Narsing Lolge (supra), this Court by

considering the cases of State of Maharashtra Vs. Kailas Shiva Rangari

and Ashok S/o. Masu Bansolde and Anr. Vs. State of Maharashtra and

Ors. held that Section 80 mandates the payment of interest. By

considering judgment in the case of Union of India and Anr. Vs.

Pushpavathi and Ors.6, the Court considered that non-award of interest

on the amount cannot be a subject matter of the reference under Section

18 of the Land Acquisition Act, 1894. The Court by way of said order

had directed the Respondent to deposit an amount of Rs.6,00,00,000/-

(Rupees Six Crore) in this Court, subject to outcome of the petition, by

way of interim arrangement. The order being interim arrangement need

not be considered.

5 1964 SCC OnLine SC 151
6 [2018(3) SCC 28]
                                  ( 10 )                    WP-10041-2018


16.     So far as judgment in the case of Reliance Natural Resources

Ltd. (supra), the Division Bench considered provisions of Section 24 of

the New Act, 2013. This Court held that when the award is under

Section 11 of the Old 1894 Act, a case would be covered by Section

24(1)(a), and held that the provisions of New Act, 2013 are applicable

only in respect of determination of compensation. If the compensation is

to be determined under Section 27 of the New Act, the same cannot be

done unless notice is issued in terms of Section 21(1) of the New Act,

2013. It is held that the provision only mandates determination of

compensation in view of New Act, 2013, even in the cases where the

proceedings may have taken place under the Old Act, 1894.



17.     In the case of Executive Engineer, Gosikhurd (supra), the

Hon’ble Apex Court considered the expression, “all the provisions of this

Act relating to the determination of compensation shall apply” given in

Section 24(1)(a). It was held that the provisions relating to

determination of compensation under New Act, 2013 i.e. Sections 25 to

30 would apply. By considering these provisions, ultimately what is held
                                      ( 11 )                       WP-10041-2018


as under:

    “56.1. Section 25 of the 2013 Act would apply to the awards made and
    published under Section 24(1)(a) of the 2013 Act.
    56.2. The limitation period for passing/making of an award under
    Section 24(1)(a) in terms of Section 25 of the 2013 Act would
    commence from 1-1-2014, that is, the date when the 2013 Act came into
    force.
    56.3. Period during which the court order would inhibit action on the
    part of the authorities to proceed with the making of the award would
    be excluded while computing the period under Section 25 of the 2013
    Act.
    56.4. Accordingly, period of 79 days from 26-5-2014 when the High
    Court had stayed operation of the Notification dated 19-3-2014, till the
    new Notification dated 13-8-2014 was issued has to be excluded.
    56.5. The award purportedly dated 30-10-2014, was in any case duly
    made on or before the extended date of 20-3-2015. Hence, the award
    concerned is valid.
    56.6. The State of Maharashtra may conduct an inquiry in reference to
    the imputation regarding manipulation and backdating of the subject
    award and take such remedial and corrective action as may be necessary
    and to ensure such situations do not arise in future.”



.           Considering above, the award dated 30/10/2014 was held to

be valid. The award in that case was passed under the Old Act, 1894. In

that case, the award was set aside holding that the acquisition had

lapsed. It was specifically held by the Hon’ble Apex Court that the

acquisition proceeding had not lapsed and appeals were allowed.
                                        ( 12 )                        WP-10041-2018


18.        In the case of Mehtab Laiq Ahmed Shaikh (supra), the question

in the said case was as to whether the provisions of the New Act, 2013

are applicable so far as acquisitions under MRTP Act are concerned. It

was held that MRTP Act is a complete code in itself. Section 24 (2) will

apply only in cases where the proceedings are initiated under the Old

Act, 1894. It is thus held that if the proceedings are initiated under

MRTP Act, there is no question of application of Section 24(2) and no

award would lapse. Paragraph No. 76 of the said judgment concludes as

follows:


      “76. Thus, to conclude, it is clear that since section 24(2) of the
      RFCTLARR Act provides different time frame and lapsing of
      acquisition on default, it cannot be applied to the acquisition initiated
      under section 125 to 127 of the MRTP Act. The MRTP Act has not
      undergone any change from its character as a complete code. Section
      24(2) of the RFCTLARR Act will apply only if the acquisition
      proceedings are "initiated" under the Land Acquisition Act, and cannot
      apply if they are initiated under section 125 to 127 of the MRTP Act.
      The view taken by the Division Bench of this Court in the Case of
      Hanumanrao Morbaji Gudadhe lays down correct position of law that
      section 24(2) of the RFCTLARR Act cannot apply to acquisition under
      section 125 to 127 of the MRTP Act. The subsequent amendments to
      the MRTP Act, framing of Rules by the State, and the proviso to
      section 125 have not brought in any change in the position of law in
      this regard.”
                                    ( 13 )                    WP-10041-2018


19.      Since the petitioner has prayed for interest under Section 80 of

the New Act, 2013, it is necessary to examine the scheme of Section 80

which reads as under:



       “80. Payment of interest.- When the amount of such
       compensation is not paid or deposited on or before taking
       possession of the land, the Collector shall pay the amount
       awarded with interest thereon at the rate of nine per cent.
       per annum from the time of so taking possession until it
       shall have been so paid or deposited:Provided that if such
       compensation or any part thereof is not paid or deposited
       within a period of one year from the date on which
       possession is taken, interest at the rate of fifteen per cent.
       per annum shall be payable from the date or expiry of the
       said period of one year on the amount of compensation or
       part thereof which has not been paid or deposited before
       the date of such expiry.”

20.      Section 80 of the New Act necessarily is in respect of

payment of compensation under New Act. It clearly stipulates that

when such compensation is not paid or deposited on or before

taking possession of the land, the amount is to be awarded with

interest at the rates given in the said section. This Court finds that

the petitioner has rightly placed reliance upon the judgment in the

case of Ganesh Lolge (supra).
                                  ( 14 )                    WP-10041-2018


21.     So far as judgment relied upon by the learned Advocate for

Respondent are concerned, it is seen that in the case of Executive

Engineer, Gosikhurd (supra), the Hon’ble Apex Court considered the

effect of section 24(1)(a) of the Act. It is held that Section 25 of the

2013 Act would apply to the awards made and published under Section

24(1)(a) of the New Act. In the said case, the award was passed under

Old Act. However, the Court considered the provision of the New Act for

the purpose of award of compensation.


22.     So far as judgment in the case of Reliance Natural Resources

Ltd. (supra), the provisions under Section 24 of the New Act were

considered. In that case also, the award was passed under Section 11 of

the Old Act. It was still held that the case would be covered under

Section 24(1)(a) of the New Act in respect of determination of

compensation.


23.     This Court had also considered the case of Mehtab Laiq Ahmed

Shaikh (supra), in that case, the acquisition was done under MRTP Act.

It was held MRTP Act is a complete code in itself and in that view it was
                                   ( 15 )                    WP-10041-2018


held that Section 24(2) would apply only in cases where procedure is

initiated under the Old Act. In the present case, the proceeding is

undertaking under the Land Acquisition Act, 1894 and not under the

provisions of MRTP Act.


24.     This Court thus considering all above finds that in the present

case, the petitioner has made out a case for grant of interest as per

Section 80 of the New Act as it is clear that section 6 notification under

Old Act was issued on 24/10/2013. It was corrected on 26/12/2013 and

final award was passed on 29/01/2015. The award is passed after the

New Act came into force. Naturally, petitioner would be entitled to

receive the benefits of interest under Section 80 of the New Act.


25.     Now the question would be as regards the liability to pay the

interest. It is the contention of the State Government that the

Corporation did not deposit the full amount of compensation of acquired

land and it is for that reason payment could not be made within time.

Whereas, the Corporation state that 50% amount was deposited.

However, it is accepted that the remaining amount was paid after some
                                        ( 16 )                     WP-10041-2018


gap. It is clearly seen, it is mainly the corporation who is responsible for

delayed payment. First installment was paid of Rs. 70,87,500/- on

30/03/2016, much after the award, and the remaining amount was paid

of Rs.1,28,05,740/- on 17/08/2017.


26.          Thus, the Corporation shall be liable to pay the interest on the

entire amount till 30/03/2016 as per law, and thereafter, for the

remaining amount till it was deposited with the Collector.

27.          It is thereafter, for the Collector to pay the amount of interest to

the petitioner. The interest to be paid as per Section 80 of the New Act.

The amount be paid within a period of six months from the date of

passing of this order.


28.          With these, writ petition stands disposed off.




[AJIT B. KADETHANKAR, J.]                           [KISHORE C. SANT, J.]

D.A.ETHAPE
