Electricity Act, 2003

130 Supreme Court judgments cite this Act.

JAIPUR VIDYUT VITARAN NIGAM LTD. & ORS.versusADANI POWER RAJASTHAN LIMITED & ANR.

2020 INSC 52131 August 2020Case Partly allowed

Jaipur Vidyut Vitran Nigam Ltd. (JVVNL) entered into a Power Purchase Agreement (PPA) with Adani Power Rajasthan Ltd. (APRL) in 2010, basing the tariff on domestic coal supply. APRL later claimed additional compensation under the PPA’s change‑in‑law clause after the New Coal Distribution Policy of 2013 reduced the assu

RAMAYANA ISPAT PVT. LTD. AND ANR.versusSTATE OF RAJASTHAN & ORS.

2025 INSC 42431 March 2025Dismissed

The appellants, large industrial consumers and captive power generators, challenged the Rajasthan Electricity Regulatory Commission's (RERC) 2016 Open Access Regulations, alleging that they exceeded RERC's jurisdiction over inter‑state open access, imposed unreasonable penalties for drawal variations, required a 24‑hou

KERALA STATE ELECTRICITY BOARD LTD.versusJHABUA POWER LIMITED AND OTHERS

2024 INSC 76830 September 2024Disposed off

The Kerala State Electricity Board (KSEB) procured power through competitive bidding but accepted tariffs and quantities that deviated from standard bidding guidelines, leading to the execution of Power Supply Agreements (PSAs) for 865 MW. KSEB sought approval of these PSAs from the Kerala State Electricity Regulatory

STATE ELECTRICITY BOARD AND OTHERSversusM/S RAMKRISHNA FORGING LIMITED

2021 INSC 27830 April 2021Dismissed

The Jharkhand State Electricity Board (the Board) entered into an initial agreement with M/s Ramkrishna Forging Ltd. (the respondent) on 14 April 2004 for a 325 KVA high‑tension supply, which was subsequently enhanced to 4000 KVA through a series of supplemental agreements. In September 2007 the respondent sought to re

TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITEDversusM/S RAIN CALCINING LIMITED & OTHERS

2019 INSC 130029 November 2019Appeal(s) allowed

The Supreme Court examined three sets of appeals filed by Transmission Corporation of Andhra Pradesh Ltd. (APTRANSCO) against orders of the Andhra Pradesh Electricity Regulatory Commission (APERC) fixing wheeling charges, grid support charges, and the continuation of incentives for non‑conventional energy. The Court he

M/S NTPC LTD.versusM.P. STATE ELECTRICITY BOARD & ORS.

2011 INSC 72429 September 2011Disposed off

NTPC Ltd., a government‑owned power generator, supplied electricity to Madhya Pradesh, Punjab and Delhi electricity boards and later sought a tariff determination from the Central Electricity Regulatory Commission (CERC). CERC fixed a final tariff lower than the provisional tariff, finding that NTPC had collected exces

M/S KKK HYDRO POWER LIMITEDversusHIMACHAL PRADESH STATE ELECTRICITY BOARD LIMITED AND OTHERS

2025 INSC 105729 August 2025Dismissed

The appellant, KKK Hydro Power Ltd, entered into a 3 MW power purchase agreement (PPA) with HPSEB in 2000 fixing a tariff of ₹2.50/kWh, later augmenting the project to 4.90 MW and attempting to raise the tariff to ₹2.95/kWh through a supplementary PPA in 2010 without the Himachal Pradesh Electricity Regulatory Commissi

VISHAL AGRAWAL & ANR.versusCHHATTISGARH STATE ELECTRICITY BOARD & ANR.

2014 INSC 6429 January 2014Dismissed

The appellants, consumers of electricity, were accused of theft of electricity and the State Electricity Board lodged a complaint that led to an FIR under Sections 135/126 of the Electricity Act, 2003. The Special Judge took cognizance of the offence, but the appellants challenged the jurisdiction, arguing that an Assi

JHARKHAND STATE ELECT. BOARD & ORS.versusM/S. LAXMI BUSINESS & CEMENT CO.P. LTD. & ANR.

2014 INSC 15628 February 2014Dismissed

The Jharkhand State Electricity Board (JSEB) appealed against a High Court order directing it to refund excess amounts charged to two high‑tension consumers under a 1994 agreement. The consumers had paid the bills under protest, arguing that after the Electricity Act, 2003, tariff power shifted exclusively to the State

G H CENTURY RAYON LIMITEDversusIVP LIMITED AND OTHERS

2019 INSC 128827 November 2019Appeal(s) allowed

Century Rayon Ltd (appellant) sought to erect 100 kV electricity transmission towers on land owned by IVP Ltd (first respondent) under a sanction from MSEDC. IVP Ltd filed a suit for permanent injunction alleging the contractors were excavating its land without permission. The trial court and High Court imposed a tempo

BIHAR STATE ELECTRICITY BOARD ETC.versusM/S ICEBERG INDUSTRIES LTD. AND OTHERS ETC.

2020 INSC 37127 April 2020Dismissed

The Bihar State Electricity Board (BSEB) disconnected the high‑tension electricity supply to Iceberg Industries Ltd. after the company failed to pay the Annual Minimum Guarantee (AMG) and other charges, despite the company’s request for payment in instalments and a stay order from the Consumer Grievances Redressal Foru

GUJARAT URJA VIKAS NIGAM LIMITEDversusESSAR POWER LIMITED AND ANOTHER

2025 INSC 116025 September 2025Disposed off

Gujarat Urja Vikas Nigam Ltd (GUVNL), successor to Gujarat Electricity Board, entered into a power purchase agreement (PPA) with Essar Power Ltd (EPL) for 300 MW of a 515 MW plant, while EPL had a separate PPA with its sister company Essar Steel Ltd (ESL) for the remaining 215 MW. EPL repeatedly supplied electricity to

MADHYA PRADESH POWER MANAGEMENT CO. LTD. & ANR. M/S DHAR WIND POWER PROJECTS PVT. LTD. & ORS.versusM/S DHAR WIND POWER PROJECTS PVT. LTD. & ORS.

2019 INSC 81425 July 2019Case Partly allowed

Madhya Pradesh Power Management Co. Ltd. (appellant) and Dhar Wind Power Projects Pvt. Ltd. (respondent) disputed which tariff rate applied to a 12‑15 MW wind project. The 2013 Tariff Order fixed a rate of Rs 5.92 per unit for projects commissioned up to 31 March 2016, while the 2016 Tariff Order reduced the rate to Rs

M/S SESA STERLITE LTD.versusORISSA ELECTRICITY REGULATORY COMM. & ORS.

2014 INSC 33925 April 2014Dismissed

The appellant, a developer of a single‑unit Special Economic Zone (SEZ), entered into a power purchase agreement (PPA) with Sterlite Energy to obtain electricity for its plant and was directed by the Odisha Electricity Regulatory Commission to pay a cross‑subsidy surcharge (CSS) to WESCO, the distribution licensee in t

UTTAR HARYANA BIJLI VITRAN NIGAM LTD [UHBVNL]. & ANRversusADANI POWER LTD. & ORS.

2019 INSC 26125 February 2019Dismissed

The dispute concerned whether Adani Power Ltd. was entitled to an adjustment in its monthly tariff payments – including carrying costs – after the Ministry of Commerce and Industry withdrew SEZ duty and service‑tax exemptions in 2015‑16. The parties relied on Article 13 of their Power Purchase Agreements, which provide

UTTAR HARYANA BIJLI VITRAN NIGAM LTD. ANDversusADANI POWER (MUNDRA) LIMITED AND ANOTHER

2022 INSC 86224 August 2022Dismissed

Uttar Haryana Bijli Vitran Nigam Ltd. (UHBVNL) and another distribution licensee appealed against the Appellate Tribunal's order granting Adani Power (Mundra) Ltd. carrying cost with compound interest arising from a Change in Law event that required installation of a Flue Gas Desulfurization (FGD) unit. The appellants

SRI A.M.C.S. SWAMY ADE/DPE/HYD (CENTRAL)versusMEHDI AGAH KARBALAI & ANR.

2019 INSC 79523 July 2019Appeal(s) allowed

The appellant, an officer of the Southern Power Distribution of Telangana Limited, filed a criminal appeal against the High Court’s order that quashed proceedings for electricity theft under the Electricity Act, 2003. The respondent had allegedly tampered with an electricity meter, leading to a loss of Rs.6.28 lakh, an

BHASKAR SHRACHI ALLOYS LTD. ETC.ETC.versusDAMODAR VALLEY CORPORATION & ORS. ETC.

2018 INSC 62923 July 2018Dismissed

The Damodar Valley Corporation (DVC), incorporated under the 1948 Act, had notified its own tariff before the Electricity Act, 2003 came into force. After the 2003 Act, the Central Electricity Regulatory Commission (CERC) issued a tariff order, which DVC challenged before the Appellate Tribunal. The Tribunal held that

JAIPUR VIDYUT VITRAN NIGAM LTD. & ORS.versusADANI POWER RAJASTHAN LTD. & ANR.

2025 INSC 77023 May 2025Dismissed

The dispute arose from a Coal India notification dated 19‑12‑2017 imposing Evacuation Facility Charges (EFC) on coal dispatches, which the power generator (Adani Power Rajasthan Ltd.) claimed constituted a "change in law" under the Power Purchase Agreement (PPA) with the Rajasthan distribution companies. The generator

CHIEF GENERAL MANAGER (IPC) MP POWER TRADING CO LTD & ANR.versusNARMADA EQUIPMENTS PVT LTD

2021 INSC 20423 March 2021Appeal(s) allowed

The Madhya Pradesh Electricity Board entered into a Power Purchase Agreement (PPA) with Narmada Equipments in 1999, which was terminated in 2001. The PPA contained an arbitration clause. In 2011 Narmada invoked the clause and, after receiving no response, filed an application under Section 11(6) of the Arbitration and

WEST BENGAL ELECTRICITY REGULATORY COMMISSIONversusHINDALCO INDUSTRIES LTD. & ORS.

2010 INSC 23122 April 2010Appeal(s) allowed

The West Bengal Electricity Regulatory Commission (WBERC) appealed an order of the Appellate Tribunal for Electricity that had remanded the determination of wheeling charges for Hindalco Industries Ltd. for the year 2005‑06. Hindalco argued that no units of power were wheeled during that period, so no wheeling charges

M/S. JAYASAWALS NECO LTD.versusCHHATTISGARH STATE ELECTRICITY REGULATORY COMMISSION AND ANOTHER

2017 INSC 16822 February 2017Appeal(s) allowed

Mis. Jayasawals NECO Ltd., a power‑intensive industry, challenged the Chhattisgarh State Electricity Regulatory Commission’s imposition of minimum monthly charges based on a 30% load‑factor for FY 2005‑2006. The Commission, after reviewing the appellant’s consumption pattern, reduced the minimum charge to 10% load‑fact

M K RANJITSINH & ORS.versusUNION OF INDIA & ORS.

2024 INSC 28021 March 2024Directions issued

The petitioners sought a blanket prohibition on the installation of overhead transmission lines for solar power across roughly 99,000 square kilometres in Rajasthan and Gujarat, arguing that such lines threaten the critically endangered Great Indian Bustard (GIB). The Supreme Court had earlier ordered the conversion of

RELIANCE INFRASTRUCTURE LIMITEDversusSTATE OF MAHARASHTRA AND ORS.

2019 INSC 6321 January 2019Disposed off

Reliance Infrastructure Ltd (RInfra) challenged Regulation 44.2(d) of the MERC (Multi Year Tariff) Regulations, 2011, which imposed a stricter Station Heat Rate (SHR) on its Dahanu thermal power station than on other units. RInfra filed a writ petition under Article 226 of the Constitution while an appeal against MERC’

THE EXECUTIVE ENGINEER AND ANR.versusM/S SRI SEETARAM RICE MILL

2011 INSC 77220 October 2011Appeal(s) allowed

The case concerned a rice mill that consumed electricity beyond its contracted load, leading the Executive Engineer to issue a provisional assessment under Section 126 of the Electricity Act, 2003. The mill challenged the assessment and the accompanying notice of "unauthorised use" before the High Court, arguing lack o

UTTAR HARYANA BIJLI VITRAN NIGAM LTD. & ANRversusADANI POWER (MUNDRA) LIMITED & ORS.

2023 INSC 40120 April 2023Dismissed

Uttar Haryana Bijli Vitran Nigam Ltd. and Dakshin Haryana Bijli Vitran Nigam Ltd. (collectively, Haryana Utilities) had entered Power Purchase Agreements with Adani Power Mundra Ltd. (APML) for 1,424 MW of power. APML claimed relief under the "Change in Law" clause of the PPAs, alleging a shortfall of domestic coal cau

GMR WARORA ENERGY LIMITEDversusCENTRAL ELECTRICITY REGULATORY COMMISSION (CERC) & ORS.

2023 INSC 39820 April 2023Dismissed

The Supreme Court examined a batch of appeals arising from Power Purchase Agreements (PPAs) between GMR Warora Energy Ltd. (the generator) and various distribution companies, challenging the classification of several post‑cut‑off charges as ‘Change in Law’ events and the computation of carrying cost interest. The Court

RAJESH AWASTHIversusNAND LAL JAISWAL & ORS.

2012 INSC 49519 October 2012Dismissed

The appellant, Rajesh Awasthi, was appointed Chairperson of the Uttar Pradesh State Electricity Regulatory Commission after a Selection Committee forwarded his name with a note that the government must first ensure compliance with Section 85(5) of the Electricity Act, 2003. The petitioner challenged the appointment, ar

NABHA POWER LIMITEDversusPUNJAB STATE POWER CORPORATION LIMITED AND OTHERS

2025 INSC 100219 August 2025Dismissed

Nabha Power Ltd (NPL) and Talwandi Sabo Power Ltd (TSPL) entered into Power Purchase Agreements (PPA) with Punjab State Power Corporation Ltd (PSPCL) for a 700 MW coal‑fired project. They claimed that deemed export benefits under Paragraph 8.3 of the Foreign Trade Policy (FTP) 2009‑2014 were available at the bid cut‑of

WARYAM STEEL CASTINGS PVT. LTD.versusPUNJAB STATE POWER CORPORATION LTD. AND ANR.

2017 INSC 48519 June 2017Dismissed

The appellants, arc‑furnace industries established before June 1995, were required to shift their power supply from 11 kV to 66 kV or pay a surcharge of 17.5% under a 1995 circular. A 1999 circular exempted pre‑1995 units from both conversion and surcharge. After the Electricity Act, 2003 came into force, the Punjab St

K. C. NINANversusKERALA STATE ELECTRICITY BOARD & ORS.

2023 INSC 56019 May 2023Disposed off

The Supreme Court examined a batch of appeals concerning whether electricity arrears of a previous owner can be recovered from a subsequent owner who acquired the premises through auction or other transfers. It held that the duty of a distribution licensee to supply electricity under Section 43 of the Electricity Act,

BSES RAJDHANI POWER LTD.versusDELHI ELECTRICITY REGULATORY COMMISSION

2022 INSC 110518 October 2022Appeal(s) allowed

BSES Rajdhani Power Ltd. and BSES Yamuna Power Ltd., distribution licensees in Delhi, challenged the Delhi Electricity Regulatory Commission’s (DERC) tariff orders that altered the methodology for computing AT&C losses, depreciation, FR/SR salaries, fringe benefit tax, and interest on consumer security deposits during

U.P. POWER CORPORATION LTD.versusN.T.P.C. LTD. & ORS.

2013 INSC 63718 September 2013Dismissed

The appellant U.P. Power Corporation Ltd. challenged the Central Electricity Regulatory Commission’s (CERC) approval of additional capitalisation of Rs 4.521 crore for a thermal power plant taken over by NTPC Ltd. The CERC had allowed the excess expenditure despite the requirement in Regulation 2.5 of its Tariff Regula

RAMANversusUTTAR HARYANA BIJLI VITRAN NIGAM LTD. & ORS.

2014 INSC 88517 December 2014Appeal(s) allowed

A four‑year‑old boy was electrocuted when a live wire fell on his roof, resulting in triple amputation and 100% permanent disability. The parents sued Uttar Haryana Bijli Vitran Nigam Ltd. under Section 68 of the Electricity Act, 2003 for compensation. The Single Judge of the High Court awarded Rs 60 lakhs, directing R

PASCHIMANCHAL VIDYUT VITRAN NIGAM LTD.versusRAMAN ISPAT PRIVATE LIMITED & ORS.

2023 INSC 62517 July 2023Dismissed

Paschimanchal Vidyut Vitran Nigam Ltd (PVVNL) supplied electricity to Raman Ispat Pvt Ltd, which defaulted on payments. PVVNL attached the debtor's assets and, after the corporate insolvency resolution failed, the matter proceeded to liquidation under the Insolvency and Bankruptcy Code (IBC). PVVNL contended that secti

M/S SUNDEW PROPERTIES LIMITEDversusTELANGANA STATE ELECTRICITY REGULATORY COMMISSION & ANR.

2024 INSC 43917 May 2024Case Partly allowed

The appellant, Sundew Properties Ltd., was notified by the Ministry of Commerce & Industry as a developer of a Special Economic Zone (SEZ) and claimed that, under the 2010 Notification inserting a proviso to section 14(b) of the Electricity Act, it automatically became a deemed distribution licensee without needing to

ADANI GAS LIMITEDversusPETROLEUM AND NATURAL GAS REGULATORY BOARD AND ORS.

2020 INSC 19917 February 2020Dismissed

The Petroleum and Natural Gas Regulatory Board (PNGRB) conducted the ninth round of bidding for city or local natural gas distribution networks (CGD) in 2018. After opening technical bids, the Board introduced an internal note on 23 July 2018 that suggested a 2%–100% range of total households (based on the 2011 Census)

KERALA STATE ELECTRICITY BOARD & ORS.versusTHOMAS JOSEPH ALIAS THOMAS M. J. & ORS.

2022 INSC 129316 December 2022Appeal(s) allowed

The Kerala State Electricity Board (KSEB) appealed against a Kerala High Court judgment that held excess consumption of electricity within the same premises and tariff does not constitute "unauthorised use" for the purpose of imposing a double‑tariff penalty. The Supreme Court examined whether drawing electricity beyon

A.P. POWER COORDINATION COMMITTEE & ORS.versusMIS. LANCO KONDAPALLI POWER LTD. & ORS.

2015 INSC 103316 October 2015Dismissed

The dispute involved the A.P. Power Coordination Committee and related entities (appellants) and M/s. LanCo Kondapalli Power Ltd. (respondent) over capacity‑charge bills and a claim for reimbursement of Minimum Alternate Tax (MAT) under their Power Purchase Agreement (PPA). The key questions were whether the Limitation

THE STATE OF HIMACHAL PRADESH & ANR.versusJSW HYDRO ENERGY LIMITED & ORS.

2025 INSC 85716 July 2025Appeal(s) allowed

The Himachal Pradesh government entered into an Implementation Agreement with JSW Hydro Energy Ltd (formerly JIL) to supply 12% free power for the first 12 years and 18% thereafter from a 1045 MW hydro project. When the free‑power obligation rose above the 13% cap prescribed in CERC (Terms and Conditions of Tariff) Reg

POWER GRID CORPORATION OF INDIA LIMITEDversusMADHYA PRADESH POWER TRANSMISSION COMPANY

2025 INSC 69715 May 2025Appeal(s) allowed

Power Grid Corporation of India Ltd (the appellant) sought CERC orders to approve the commercial operation date of its inter‑state transmission assets and to recover compensation for delays caused by Madhya Pradesh Power Transmission Company Ltd (respondent No.1). CERC, exercising powers under s.79(1) of the Electricit

PTC INDIA LTD.versusCENTRAL ELECTRICITY REGULATORY COMMISSION THROUGH SECRETARY

2010 INSC 14615 March 2010Dismissed

PTC India Ltd and other traders challenged the Central Electricity Regulatory Commission's (CERC) Fixation of Trading Margin Regulations, 2006, alleging they were ultra vires. They appealed to the Appellate Tribunal for Electricity, which dismissed the appeal, directing them to seek judicial review. The Supreme Court e

TORRENT POWER LIMITEDversusU.P. ELECTRICITY REGULATORY COMMISSION & ORS

2025 INSC 83814 July 2025Case Allowed

The Supreme Court examined a petition filed by an individual (respondent No.4) before the Uttar Pradesh Electricity Regulatory Commission (UPERC) seeking an investigation under Section 128 of the Electricity Act, 2003 into a Distribution Franchisee Agreement (DFA) between Torrent Power Limited (the appellant) and the d

THE HP POWER TRANSMISSION CORPORATION LTD.versusM/S BRUA HYDROWATT PVT. LTD. & ORS.

2025 INSC 68014 May 2025Appeal(s) allowed

The Himachal Pradesh Power Transmission Corporation Ltd (HPPTC) built a 66 kV Bay at Urni for three generating companies and sought the full construction cost from Brua Hydrowatt Pvt Ltd (BHP), the lead partner, under a Connection Agreement dated 02‑07‑2021. BHP argued that the cost should be shared proportionately wit

GOVT. OF NCT OF DELHIversusUNION OF INDIA

2019 INSC 19414 February 2019Disposed off

The case involves multiple appeals arising from a Delhi High Court judgment concerning the division of powers between the Government of National Capital Territory of Delhi (GNCTD) and the Lieutenant Governor (LG) under Article 239AA of the Constitution. The Supreme Court Constitution Bench had earlier interpreted Artic

HINDUSTAN ZINC LTDversusRAJASTHAN ELECTRICITY REGULATORY COMMISSION

2015 INSC 99613 May 2015Directions issued

The Supreme Court considered appeals by Hindustan Zinc Ltd. and other captive power generators challenging the Rajasthan Electricity Regulatory Commission’s (RERC) Renewable Energy Obligation Regulations of 2007 and 2010, which require them to purchase a minimum quantum of electricity from renewable sources. The appell

VIDARBHA INDUSTRIES POWER LIMITEDversusAXIS BANK LIMITED

2022 INSC 71012 July 2022Appeal(s) allowed

Vidarbha Industries Power Ltd., a power generating company, sought a stay of the Corporate Insolvency Resolution Process (CIRP) initiated by its financial creditor, Axis Bank Ltd., arguing that pending regulatory disputes and a favourable APTEL award of Rs.1,730 crore rendered the admission of the petition inappropriat

SANJAY GUPTA & ORSversusSTATE OF UTTAR PRADESH THROUGH ITS CHIEF SECRETARY & ORS

2022 INSC 42112 April 2022Directions issued

A fire broke out on 10 April 2006 at the India Brand Consumer Show in Meerut, killing 65 people and injuring 161. The victims filed a writ petition under Article 32 seeking compensation from the event organizers (Mrinal Events and Expositions) and the State of Uttar Pradesh, alleging negligence and violation of the rig

STATE OF GUJARAT & ORS.versusUTILITY USERS’ WELFARE ASSOCIATION & ORS.

2018 INSC 32912 April 2018Disposed off

The Supreme Court examined whether Section 84(2) of the Electricity Act, 2003 obliges a High Court Judge to be appointed as Chairperson of a State Electricity Regulatory Commission and whether a member of law is required on the Commission. By interpreting the statutory language, the Court held that Section 84(2) is mer

MUKESH CHANDversusTHE STATE(NCT) OF DELHI & ANR

2019 INSC 35412 March 2019Appeal(s) allowed

The appellant, a consumer of electricity, was issued a bill of Rs.3,54,598.21 by BSES for alleged theft of electricity and a FIR was filed against him under Section 135 of the Electricity Act, 2003. The parties later settled the dispute in a Special Lok Adalat, agreeing on a payment of Rs.1,60,000, and the appellant fi

ENERGY WATCHDOGversusCENTRAL ELECTRICITY REGULATORY COMMISSION AND ORS. ETC.

2017 INSC 33811 April 2017Disposed off

The Supreme Court examined appeals by power generators challenging the Central Electricity Regulatory Commission’s (CERC) refusal to grant compensatory tariff after a rise in Indonesian coal prices. The Court clarified that CERC’s authority to adopt or determine tariffs under Section 63 is derived from its general regu

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO. LTD.versusM/S. JSW STEEL LIMITED & ORS.

2021 INSC 86610 December 2021Dismissed

Maharashtra State Electricity Distribution Co. Ltd., a distribution licensee, sought to recover an additional surcharge under Section 42(4) of the Electricity Act, 2003 from a group of captive consumers represented by M/s JSW Steel Ltd. The State Commission had held the surcharge applicable, but the Appellate Tribunal

NABHA POWER LIMITEDversusPUNJAB STATE POWER CORPORATION LIMITED

2023 INSC 8839 October 2023Appeal(s) allowed

The dispute concerned the recovery of deductions from monthly tariff, specifically the cost of washing coal and the gross calorific value (GCV) under a power purchase agreement between Nabha Power Limited and Punjab State Power Corporation Limited (PSPCL). The Supreme Court had earlier, on 5 October 2017, ordered PSPCL

GUJARAT URJA VIKAS NIGAM LTD.versusESSAR POWER LIMITED

2016 INSC 5879 August 2016Appeal(s) allowed

Gujarat Urja Vikas Nigam Ltd. (GUVNL) appealed against the Appellate Tribunal for Electricity’s order that Essar Power Ltd. (EPL) had no contractual duty to declare its generating capacity on a 300 MW : 215 MW (58 % : 42 %) basis. The Supreme Court examined the Power Purchase Agreement (PPA) and held that the agreement

ALL INDIA POWER ENGINEER FEDERATION & ORS.versusSASAN POWER LTD. & ORS. ETC.

2016 INSC 11148 December 2016Appeal(s) allowed

The dispute concerned the commercial operation date (COD) of Unit‑3 of the Sasan Ultra Mega Power Project under a Power Purchase Agreement (PPA) dated 7‑8‑2007. The procurers alleged that the generator had not met the PPA’s requirement of operating at least 95% of the contracted capacity for 72 consecutive hours, and t

MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO. LTD. & ANR.versusDATAR SWITCHGEAR LTD. & ORS.

2010 INSC 6938 October 2010Case Partly allowed

Maharashtra State Electricity Distribution Co. Ltd. (successor to MSEB) and its Chairman were accused by Datar Switchgear Ltd. of fabricating documents submitted to an arbitral tribunal, alleged to be offences under Sections 192 and 199 IPC read with Section 34. The High Court refused to quash the criminal complaint, p

TRANSMISSION CORPN. OF A.P. LTD. & ANR.versusSAI RENEWABLE POWER PVT. LTD. & ORS.

2010 INSC 3918 July 2010Disposed off

The Supreme Court examined a dispute between the Andhra Pradesh Transmission Corporation and several non‑conventional energy developers over the purchase price of electricity and the restriction on third‑party sales imposed by the Andhra Pradesh Electricity Regulatory Commission (APERC). The developers had entered into

INDIAN RAILWAYSversusWEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED & ORS.

2026 INSC 4648 May 2026Dismissed

Indian Railways sought open access to procure 100 MW of power and claimed it is a deemed distribution licensee (DDL) under the Electricity Act, 2003, thereby exempt from cross‑subsidy surcharge (CSS) and additional surcharge. The dispute centered on whether activities under sections 11(g) and 11(h) of the Railways Act

GUJARAT URJA VIKAS NIGAM LIMITEDversusMR. AMIT GUPTA & ORS.

2021 INSC 1638 March 2021Dismissed

Gujarat Urja Vikas Nigam Ltd (GUVNL) allocated a 25‑MW solar project to Astonfield Solar (the corporate debtor) under a 25‑year Power Purchase Agreement (PPA) executed in 2010. After severe flood damage the plant operated at a fraction of capacity and the corporate debtor was declared a non‑performing asset, prompting

JAIPUR VIDYUT VITRAN NIGAM LTD. & ORS.versusMB POWER (MADHYA PRADESH) LIMITED & ORS.

2024 INSC 238 January 2024Appeal(s) allowed

The Rajasthan Electricity Regulatory Commission (State Commission) was asked to approve the procurement of 1,000 MW of power through a competitive bidding process. After negotiations, the Commission approved only 500 MW and adopted the tariffs of the lowest bidders, while the higher‑priced bids of L‑4 and L‑5 were reje

DELHI ELECTRICITY REGULATORY COMMISSIONversusTATA POWER DELHI DISTRIBUTION LIMITED

2026 INSC 4617 May 2026Appeal(s) allowed

The Delhi Electricity Regulatory Commission (Commission) approved a power purchase agreement (PPA) for the Rithala Combined Cycle Power Plant with a six‑year operational period, after which the plant ceased supplying electricity in March 2018. Tata Power Delhi Distribution Limited (TPDDL) later sought to recover the re

KANPUR ELECTRICITY SUPPLY CO. LTD. & ANR.versusM/S. L.M.L. LIMITED & ORS.

2010 INSC 2887 May 2010Dismissed

L.M.L. Ltd., a two-wheeler manufacturer, was declared a Relief Undertaking and later a Sick Company due to market downturn. It applied to Kanpur Electricity Supply Co. Ltd. (KESCO) for reduction of its contracted load from 8 MVA to 1.25 MVA effective 1 April 2006, a decision approved by the Uttar Pradesh Electricity Re

NATIONAL SECURITIES DEPOSITORY LTD.versusSECURITIES AND EXCHANGE BOARD OF INDIA

2017 INSC 2067 March 2017Disposed off

The Securities and Exchange Board of India (SEBI) issued an administrative circular under Section 11(1) of the SEBI Act to curb dematerialisation charges. National Securities Depository Ltd. (NSDL) challenged the circular, arguing that it could not be appealed before the Securities Appellate Tribunal (SAT) under Sectio

BHARAT SANCHAR NIGAM LIMITEDversusTELECOM REGULATORY AUTHORITY OF INDIA AND OTHERS

2013 INSC 8086 December 2013Reference answered

The Supreme Court examined whether the Telecom Disputes Settlement and Appellate Tribunal (TDSAT) could entertain challenges to regulations made by the Telecom Regulatory Authority of India (TRAI) under Section 36 of the Telecom Regulatory Authority of India Act, 1997. It held that the power conferred on TRAI by Sectio

BSES RAJDHANI POWER LTD. & ANRversusUNION OF INDIA AND ORS

2025 INSC 9376 August 2025Directions issued

The three Delhi distribution companies (BSES Rajdhani Power Ltd., BSES Yamuna Power Ltd., and Tata Power Delhi Distribution Ltd.) challenged the Delhi Electricity Regulatory Commission’s (DERC) tariff orders that created and perpetuated a large regulatory asset to bridge revenue gaps, which had ballooned to over Rs 27,

CLP INDIA PVT. LTD.versusGUJARAT URJA VIKAS NIGAM LTD. & ANR.

2020 INSC 3836 May 2020Dismissed

The Gujarat Electricity Board (Gujarat Urja) and CLP India entered into a 1994 Power Purchase Agreement (PPA) for 635 MW of electricity. A 1995 Central Government notification amended the 1992 tariff notification, removing the deemed generation incentive for naphtha‑based plants. Gujarat Urja sought recovery of incenti

HARYANA POWER PURCHASE CENTREversusSASAN POWER LTD. & ORS

2023 INSC 3266 April 2023Appeal(s) allowed

The case concerned an Ultra Mega Power Project where the seller (Sasan Power Ltd.) claimed compensation for increased costs of a water‑intake system and customs duty on mining equipment, alleging these were "change in law" events under Article 13 of the Power Purchase Agreement (PPA). The seller argued that the Appella

BHARATI REDDYversusTHE STATE OF KARNATAKA & ORS.

2018 INSC 2136 March 2018Appeal(s) allowed

The appellant, Bharati Reddy, was elected Adhyaksha of a Zilla Panchayat after obtaining an Income and Caste Certificate from the Tahsildar. Unsuccessful candidates alleged that the certificate was fraudulently obtained, that the appellant’s affidavits contained contradictory income disclosures, and that the certificat

RITHWIK ENERGY GENERATION PVT. LTD.versusBANGALORE ELECTRICITY SUPPLY CO. LTD. & ORS. ETC.

2018 INSC 1086 February 2018Dismissed

Rithwik Energy Generation Pvt Ltd entered into a Power Purchase Agreement (PPA) with Bangalore Electricity Supply Co Ltd (BESCOM). The State Commission refused to approve the PPA, leading the appellant to seek a declaration that the PPA was invalid. During the pendency of appeals, the appellant sent a letter dated 5 Ma

M/S PREM COTTEXversusUTTAR HARYANA BIJLI VITRAN NIGAM LTD. & ORS.

2021 INSC 6175 October 2021Dismissed

M/S Prem Cottex, a cotton yarn manufacturer, was issued a short assessment notice by Uttarakhand Bijli Vitran Nigam Ltd. alleging that the multiply factor (MF) used in its electricity bills was incorrectly applied, resulting in short billing of about Rs.1.35 crore. The appellant filed a consumer complaint under the Con

NABHA POWER LIMITED (NPL)versusPUNJAB STATE POWER CORPORATION LIMITED (PSPCL) & ANR.

2017 INSC 10085 October 2017Case Partly allowed

Nabha Power Ltd (NPL) entered into a 25‑year Power Purchase Agreement (PPA) with Punjab State Power Corporation Ltd (PSPCL) for a 1200 MW plant under a fuel‑specific, pre‑identified site procurement route. The PPA’s energy‑charge formula required the cost of purchasing, transporting and unloading coal "to and at the pr

GUJARAT URJA VIKAS NIGAM LIMITEDversusTARINI INFRASTRUCTURE LTD. & ORS.

2016 INSC 5005 July 2016Dismissed

The Supreme Court examined whether a tariff fixed under a Power Purchase Agreement (PPA) is immutable and beyond the review of the State Electricity Regulatory Commission (SERC). The Court held that tariff determination is a statutory function of the SERC under Section 86(1)(b) of the Electricity Act, 2003 and is subje

SAI BHASKAR IRON LTD.versusA.P. ELECTRICITY REGULATORY COMMISSION & ORS.

2016 INSC 5025 July 2016Dismissed

The petitioners challenged the Andhra Pradesh Electricity Regulatory Commission’s Regulation 45‑B, which prescribes a formula for calculating the fuel surcharge adjustment (FSA) and excludes agricultural consumption until metering is completed. They argued that the regulation was ultra vires the Andhra Pradesh Electric

HINDUSTAN ZINC LIMITED (H.Z.L.)versusAJMER VIDYUT VITRAN NIGAM LIMITED

2019 INSC 13194 December 2019Disposed off

Hindustan Zinc Limited (HZL) operates four units and a captive power plant, and entered into open‑access agreements with Ajmer Vidyut Vitran Nigam Ltd (AVVNL) for wheeling power to three of its units. A dispute arose over unscheduled interchange (UI) charges under clauses 8 and 9 of the agreements. The Rajasthan Electr

THE STATE OF HIMACHAL PRADESH & ORS.versusMIS. GUJARAT AMBUJA CEMENTS LTD. & ORS.

2017 INSC 9914 October 2017Appeal(s) allowed

The State of Himachal Pradesh appealed against a High Court order that had held Mis Gujarat Ambuja Cements Ltd. entitled to reimbursement of Peak Load Exemption Charge (PLEC) under the power‑tariff‑freeze incentive granted to industrial units. The cement unit, which began commercial production on 26‑Sept‑1995, was supp

T.N. GENERATION & DISTBN. CORPN. LTD.versusPPN POWER GEN. CO. PVT. LTD.

2014 INSC 2484 April 2014Dismissed

The appellant, a power distribution company, entered into a Power Purchase Agreement (PPA) with the respondent, a power generator, and disputed accounting details and rebate claims arising from monthly invoices. The dispute was taken before the Tamil Nadu Electricity Regulatory Commission (State Commission) which adjud

DAMODAR VALLEY CORPORATIONversusCENTRAL ELECTRICITY REGULATORY COMMISSION & OTHERS

2018 INSC 11273 December 2018Dismissed

The Damodar Valley Corporation (DVC), a statutory body under the Damodar Valley Corporation Act, 1948, sought a tariff order from the Central Electricity Regulatory Commission (CERC) and claimed that, under Section 38 of the DVC Act, it was entitled to interest on its entire capital in addition to the return on equity

PASCHIMANCHAL VIDYUTVITRAN NIGAM LTD. & ORS.versusM/SADARSH TEXTILES & ANR.

2014 INSC 8293 December 2014Disposed off

The Supreme Court examined whether a policy decision of the Uttar Pradesh Government dated 14‑June‑2006, which provided a flat‑rate electricity subsidy for power‑loom bunkers, could be extended by the Uttar Pradesh Electricity Regulatory Commission to industries using HV‑2 connections. The Court held that the State Gov

POWER GRID CORPORATION OF INDIA LTD.versusPUNJAB STATE POWER CORPORATION LTD. AND OTHERS

2016 INSC 11733 March 2016

Power Grid Corporation, a transmission licencee, constructed the 400 kV Barh‑Balia double‑circuit line but the switchgear and protection system at the Barh end, which were to be installed by NTPC, were not completed. Power Grid sought a tariff from CERC effective 1 July 2010, which CERC granted despite the line not bei

THE STATE OF JHARKHANDversusSURENDRA KUMAR SRIVASTAVA & ORS.

2019 INSC 53 January 2019Appeal(s) allowed

The State of Jharkhand and the Jharkhand State Electricity Board sought to energise a fully constructed electricity sub‑station on land claimed by three respondents who alleged possession of the suit property. The respondents had earlier failed to establish a title to the land in a title suit and could not specify the

SRI CHANDU KHAMARUversusSMT. NAYAN MALIK & ORS.

2011 INSC 6372 September 2011Appeal(s) allowed

The appellant, owner of a house on Dag No. 408, sought electricity supply from the Calcutta Electricity Board, which was initially granted but later disconnected after respondents claimed the supply line passed through their land (Dag Nos. 406, 407, 409). The respondents filed a writ petition seeking a prohibition on u

M/S ADANI POWER (MUNDRA) LTD.versusGUJARAT ELECTRICITY REGULATORY COMMISSION AND ORS.

2019 INSC 7112 July 2019Appeal(s) allowed

The Gujarat Electricity Regulatory Commission (GERC) procured power through a competitive bidding process and selected M/s Adani Power (Mundra) Ltd. (the appellant) for a 1000 MW supply at Rs 2.35/kWh, contingent on an assurance from Gujarat Mineral Development Corporation (GMDC) to provide indigenous coal. When GMDC f

M/S STAR WIRE (INDIA) VIDYUT PVT. LTD. & ANR.versusHARYANA ELECTRICITY REGULATORY COMMISSION

2019 INSC 7182 July 2019Appeal(s) allowed

Star Wire (India) Vidyut Pvt. Ltd. operates a 9.90 MW biomass plant that became commercially operational on 3 May 2013. The Haryana Electricity Regulatory Commission (HERC) amended its 2010 tariff regulations by a notification dated 12 August 2015, classifying projects commissioned in FY 2013‑14 differently from those

SOUTHERN POWER DISTRIBUTION POWER COMPANY LIMITED OF ANDHRA PRADESH (APSPDCL) & ANR.versusM/S HINDUJA NATIONAL POWER CORPORATION LIMITED & ANR

2022 INSC 1362 February 2022Dismissed

The Supreme Court dismissed the appeal of the Andhra Pradesh distribution companies (DISCOMS) challenging the Appellate Tribunal for Electricity’s (APTEL) order directing the State Electricity Regulatory Commission to decide on two applications: HNPCL’s petition for determination of capital cost (O.P. No.21 of 2015) an

BENGAL CHEMISTS & DRUGGISTS ASSN.versusKALYAN CHOWDHURY

2018 INSC 912 February 2018Dismissed

Bengal Chemists & Druggists Assn. appealed against an order of the National Company Law Appellate Tribunal (NCLAT) that dismissed its appeal as not maintainable because it was filed nine days after the initial 45‑day limitation period and after the additional 45‑day grace period had also expired. The appellant argued t

GUJARAT URJA VIKAS NIGAM LIMITEDversusEMCO LIMITED & OTHERS

2016 INSC 1242 February 2016Appeal(s) allowed

Gujarat Urja Vikas Nigam Ltd (GUVNL) entered into a Power Purchase Agreement (PPA) with EMCO Ltd for a 5 MW solar project, the tariff being fixed by the Gujarat Electricity Regulatory Commission (GERC) in its first tariff order of 29 Jan 2010, which assumed the benefit of accelerated depreciation under Section 32 of th

CENTRAL ELECTRICITY SUPPLY UTILITY OF ODISHAversusDHOBEI SAHOO & ORS.

2013 INSC 7411 November 2013Appeal(s) allowed

The Central Electricity Supply Utility of Odisha (CESU) appointed its Chairman, a retired officer, to also discharge the functions of Chief Executive Officer (CEO) and paid him a consolidated honorarium. A public‑interest litigation sought a writ of quo warranto to quash this arrangement and directed recovery of the ho

U.P. POWER CORPORATION LTD. AND ORS.versusANIS AHMED

2013 INSC 3941 July 2013Appeal(s) allowed

The Supreme Court examined whether industrial/commercial electricity users could file complaints before a Consumer Forum against assessment orders under Section 126 of the Electricity Act, 2003 or actions under Sections 135‑140 of the same Act. The petitioners (U.P. Power Corporation Ltd. and others) argued that such p

M/S. DSR STEEL (P) LTD.versusSTATE OF RAJASTHAN & ORS.

2012 INSC 1951 May 2012Dismissed

The appellants, including DSR Steel (P) Ltd., challenged the Rajasthan Electricity Regulatory Commission’s tariff order and the withdrawal of an incentive scheme, alleging promissory estoppel. Their review petitions were dismissed by the Commission and the Appellate Tribunal, and they filed appeals under Section 125 of

OIL & NATURAL GAS CORP. LTD.versusGUJARAT ENERGY TRANSMISSION CORPORATION LTD. & ORS.

2017 INSC 12691 March 2017Dismissed

Oil & Natural Gas Corp. Ltd. (ONGC) appealed to the Supreme Court against the order of the Appellate Tribunal for Electricity which denied its claim for a refund. The appeal was filed more than 71 days after the 60‑day period prescribed under Section 125 of the Electricity Act, 2003, and beyond the additional 60‑day co

MUNICIPAL CORPORATION OF DELHIversusGAGAN NARANG & ORS. ETC.

2025 INSC 21 January 2025Appeal(s) allowed

The Municipal Corporation of Delhi (MCD) sought approval from the Delhi Electricity Regulatory Commission (DERC) to conduct a tariff‑based competitive bidding for a 28 MW waste‑to‑energy (WTE) project at Narela Bawana, invoking Section 63 of the Electricity Act, 2003. The Waste to Energy Research & Technology Council c